§ 17.12.030 — Application
Code of Ordinances of the City of Kennewick, Washington (Codified through Ordinance No. 26-6253, enacted September 15, 2026 (Supp. No. 19)) · Kennewick Municipal Code § 17.12.030
Corpus is an independent public-information project, not the official City of Kennewick website. Stable reference: corpuslaw.us/code/36a855fb-134b-4821-adb6-f68b4d1afa3a
17.12.030: - Application.
All binding site plan applicants must submit a completed and signed application including the following: (1) A required number of copies and one reproducible copy of a binding site plan map prepared by or under the direct supervision of a professional land surveyor licensed by the State of Washington, in accord with Section 17.12.080; (2) A title report dated no later than 60 days prior to the date of application showing the name of anyone with an interest in the land being subdivided; (3) Preliminary engineering plans including, but not limited to, water, sewer, streetlights, roads, storm drainage and sidewalks; (4) A filing fee in accord with the adopted fee schedule; and (5) A SEPA checklist consistent with the provisions of KMC 4.08.510(2).
(Ord. 5645 Sec. 1, 2016; Ord. 5415 Sec. 18, 2012; Ord. 5280 Sec. 1, 2010)
Ask a question about Kennewick law
Corpus searches the Kennewick sections it holds and shows the ones that match, with their citations. Free, no sign-in.
