§ 18.62.070 — Critical Area Report—Additional Requirements for Specific Hazards
Code of Ordinances of the City of Kennewick, Washington (Codified through Ordinance No. 26-6253, enacted September 15, 2026 (Supp. No. 19)) · Kennewick Municipal Code § 18.62.070
Corpus is an independent public-information project, not the official City of Kennewick website. Stable reference: corpuslaw.us/code/d913d2b9-14a9-45a4-a17d-7aef790a38f4
18.62.070: - Critical Area Report—Additional Requirements for Specific Hazards.
In addition to the general critical area report requirements of Section 18.58.140, critical area reports for geologically hazardous areas must meet the requirements of this Section. Critical area reports for two or more types of critical areas must meet the report requirements for each relevant type of critical area. (1) Erosion, Landslide and Extreme Slope Hazard Areas. In addition to the basic critical area report requirements, a critical area report for an erosion hazard or landslide hazard area shall include the following information at a minimum: (a) Site Plan. The report shall include a copy of the site plan for the proposal showing: (i) The height of slope, slope gradient, and cross section of the project area; (ii) The location of springs, seeps, or other surface expressions of ground water on or within 200 feet of the project area or that have potential to be affected by the proposal (a distance of 200 feet is suggested so that geological features that might affect the proposal are included in the critical area report. It may be necessary to include features further than 200 feet from the project area in some instances, such as a series of related geological features that extend more than 20 feet); and (iii) The location and description of surface water runoff. (b) Geotechnical Analysis. The geotechnical analysis shall be prepared by a qualified professional described in KMC 18.62.060(1) and specifically include: (i) A description of the extent and type of vegetative cover; (ii) An estimate of load capacity including surface and ground water conditions, public and private sewage disposal systems, fills and excavations and all structural development; (iii) An estimate of slope stability and the effect construction and placement of structures will have on the slope over the estimated life of the structure; (iv) An estimate of the bluff retreat rate that recognizes and reflects potential catastrophic events such as seismic activity or a 100-year storm event; (v) Consideration of the run-out hazard of landslide debris and/or the impacts of landslide run-out on down slope properties. (vi) A study of slope stability including an analysis of proposed angles of cut and fill and site grading; (vii) Recommendations for building limitations, structural foundations, and an estimate of foundation settlement; (viii) An analysis of proposed surface and subsurface drainage, and the vulnerability of the site to erosion; (c) Erosion and Sediment Control Plan. For any development proposal on a site containing an erosion hazard area, an erosion and sediment control plan shall be required. The erosion and sediment control plan shall be prepared in compliance with requirements set forth in the City's Construction Standards; (d) Drainage Plan. The report shall include a drainage plan for the collection, transport, treatment, discharge and/or recycle of water. The drainage plan should consider on-site septic system disposal volumes where the additional volume will affect the erosion or landslide hazard area. (e) Mitigation Plans. Hazard and environmental mitigation plans for erosion and landslide hazard areas shall include the location and methods of drainage, surface water management, locations and methods of erosion control, a vegetation management and/or replanting plan and/or other means for maintaining long-term soil stability. (f) Monitoring Surface Waters. If the Planning Director determines that there is a significant risk of damage to downstream receiving waters due to potential erosion from the site, based on the size of the project, the proximity to the receiving waters, or the sensitivity of the receiving waters, the critical area report shall include a plan to monitor the surface water discharge from the site. The monitoring plan shall include a recommended schedule for submitting monitoring reports to the City. (2) Other Geologically Hazardous Areas. In addition to the basic report requirements, the Planning Director may require additional information to be included in the critical area report when determined to be necessary to the review the proposed activity and the subject hazard. Additional information that may be required, includes, but is not limited to: (a) Site Plan. The site plan shall show all hazard areas located within 200 feet of the project area or that have potential to be affected by the proposal; and (b) Geotechnical Analysis. The geotechnical analysis shall include a complete discussion of the potential impacts of the hazard on the project area and of the proposal on the hazard.
(Ord. 5206 Sec. 5, 2007)
Ask a question about Kennewick law
Corpus searches the Kennewick sections it holds and shows the ones that match, with their citations. Free, no sign-in.
