For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.14.020 — Application

Code of Ordinances of the City of Kennewick, Washington (Codified through Ordinance No. 26-6253, enacted September 15, 2026 (Supp. No. 19)) · Kennewick Municipal Code § 4.14.020

Corpus is an independent public-information project, not the official City of Kennewick website. Stable reference: corpuslaw.us/code/41e3f390-49f8-4142-ab38-a98831e7a7d7

4.14.020: - Application.

Applicants shall apply using the City's franchise application form and submit a fee adopted by City Council and located in the Kennewick Master Fee Schedule. See Chapter 5.20 KMC for basic requirements. The Director and his or her designee shall coordinate review with the Planning Director with respect to small cell deployments which require review under KMC 18.12.315 in one consolidated process. Phased development is permitted and an applicant is encouraged to specify at least the initial small cell deployment in its application. The following information shall be provided by all applicants for franchises seeking to utilize small cell deployment in addition to the information provided pursuant to Chapter 5.20 KMC. Existing franchisees who seek to utilize a small cell deployment to expand, assist or implement an existing franchise may provide the information as a part of a Small Cell Permit application for small cell deployment. (1) Designation of Facilities. The application shall provide specific locational information including GIS coordinates of all facilities, and specify whether and where small cell facilities are to be located on existing utility poles including City-owned light standards (included in the definition of utility pole), or will utilize replacement utility poles, new poles, towers, and/or other structures. Conduit and/or ground-mounted equipment necessary for and intended for use in the deployment shall also be specified regardless of whether the additional facilities are to be constructed by the applicant or leased from an infrastructure provider. Detailed schematics and visual renderings of the facilities shall be provided by the applicant. Failure to provide sufficient detail may result in a later finding of a significant change in the facility if the facility is not accurately shown on the originally approved franchise exhibit. Failure to specify elements may also result in the requirement that new or undocumented elements complete the approval processes detailed in this Chapter and/or KMC 4.16. (2) Implementation. The rights granted under a franchise are implemented through the issuance of Small Cell Permits. The franchise application may be accompanied by application for a Small Cell Permit to deploy small cells. An initial franchise and all related Small Cell Permit applications including right-of-way use permits shall be processed concurrently as one Master Permit. See RCW 35.99.010(3) for the definition of "master permit." (a) Issuance of a Small Cell Permit to install a small cell deployment shall be contingent upon approval of a franchise or the possession of a valid franchise. (b) All Small Cell Permits which are submitted in conjunction with a franchise application shall be considered as one Master Permit. (i) Any element of a deployment which qualifies as either an Eligible Facilities Request or a collocation shall be specifically designated by the applicant and may be addressed separately by the Director in order to comply with the shot clocks established by federal law and KMC 4.16. (c) The Director may approve, deny or conditionally approve all or any portion of the sites proposed in the Small Cell Permit application. (d) Any application for a franchise or Small Cell Permit which contains an element which is not exempt from Critical Areas, Shorelines or SEPA review shall simultaneously apply under Chapter 43.21C RCW and Chapters 4.08 and 18.58 to 18.68. (e) RF Certification. The applicant shall submit a sworn affidavit signed by an RF Engineer with knowledge of the proposed project affirming that the small cell deployment will be compliant with all FCC and other governmental regulations in connection with human exposure to radio frequency emissions for every frequency at which the small cell facility will operate. If facilities necessary to the Small Cell Deployment are to be provided by another franchisee, then the Small Cell Deployment in the initial franchise or in a subsequent Small Cell Permit shall be conditioned on an RF Certification showing the cumulative impact of the RF emissions on the entire installation. (f) Regulatory Authorization. Issuance of the Use Permit for the facilities shall also be contingent upon the applicant's provision of proof of FCC and other regulatory approvals required to provide the service(s) or utilize the technologies sought to be installed. (g) Recognizing that small cell technology is rapidly evolving, the Public Works Director is authorized to adopt and publish standards for the technological and structural safety of City-owned light standards and utility structures and to formulate and publish application questions for use when an applicant seeks to attach to City-owned utility structures.

(Ord. 25-6116, Sec. 1, 2025; Ord. 5792, Sec. 1 (part), 2018; Ord. 5733, Sec. 1 (part), 2017)

Ask a question about Kennewick law

Corpus searches the Kennewick sections it holds and shows the ones that match, with their citations. Free, no sign-in.