11.06.660 Compensating for wetland impacts. Revised 8/26
A. Condition of approval. As a condition of any approval allowing alteration of wetlands or wetland buffers, or as an enforcement action, the director shall require that the applicant engage in the restoration, creation, or enhancement of wetlands and their buffers in order to offset the impacts resulting from the applicant’s or violator’s actions. The applicant shall develop a plan that provides for construction, maintenance, and monitoring of replacement wetlands or buffers and, as appropriate, land acquisition that recreates as nearly as practicable or improves the original wetlands in terms of acreage, function, geographic location, and setting. Compensatory mitigation plans shall be consistent with Wetland Mitigation in Washington State – Part 2: Developing Mitigation Plans – Version 1 (Ecology Publication No. 06-06-011b, Olympia, WA, March 2006, as currently exists and is later amended) and Selecting Wetland Mitigation Sites Using a Watershed Approach (Western Washington) (Publication No. 09-06-32, Olympia, WA, December 2009, as currently exists and is later amended), and may incorporate guidance from Calculating Credits and Debits for Compensatory Mitigation in Wetlands of Western Washington (Ecology Publication No. 10-06-011, Hruby, 2012, as currently exists and is later amended). B. Goal. The overall goal of any compensatory mitigation project shall be no net loss of overall wetland acreage or function and to replace any wetland area lost with wetland(s) and buffers of equivalent functions and values. Compensation shall be completed prior to wetland destruction, where practicable. Compensatory mitigation programs shall incorporate the standards and requirements contained in KCC 11.06.550 and 11.06.560. C. Preference of compensatory mitigation actions. Mitigation for lost or diminished wetland and buffer functions shall rely on the types below in the following order of preference: 1. Restoration (re-establishment and rehabilitation) of wetlands. a. The goal of re-establishment is returning natural or historic functions to a former wetland. Re-establishment results in a gain in wetland acres and functions. Activities could include removing fill material, plugging ditches, or breaking drain tiles. b. The goal of rehabilitation is repairing natural or historic functions of a degraded wetland. Rehabilitation results in a gain in wetland function but does not result in a gain in wetland acres. Activities could involve breaching a dike to reconnect wetlands to a floodplain. 2. Establishment (creation) of wetlands on disturbed upland sites such as those with vegetative cover consisting primarily of nonnative species. Establishment results in a gain in wetland acres. This should be attempted only when there is an adequate source of water and it can be shown that the surface and subsurface hydrologic regime is conducive to the wetland community that is anticipated in the design. a. If a site is not available for wetland restoration to compensate for expected wetland or buffer impacts, the approval authority may authorize creation of a wetland and buffer upon demonstration by the applicant’s qualified professional that: i. The hydrology and soil conditions at the proposed mitigation site are conducive for sustaining the proposed wetland and that creation of a wetland at the site will not likely cause hydrologic problems elsewhere; ii. The proposed mitigation site does not contain invasive plants or noxious weeds or that such vegetation will be completely eradicated at the site; iii. Adjacent land uses and site conditions do not jeopardize the viability of the proposed wetland and buffer (e.g., due to the presence of invasive plants or noxious weeds, stormwater runoff, noise, light, or other impacts); and iv. The proposed wetland and buffer are designed to be self-sustaining with little or no long-term maintenance. 3. Enhancement of significantly degraded wetlands in combination with restoration or creation. Enhancement should be part of a mitigation package that includes replacing the altered area and meeting appropriate ratio requirements. Enhancement is undertaken for specified purposes such as water quality improvement, flood water retention, or wildlife habitat. Enhancement alone will result in a loss of wetland acreage and is less effective at replacing the functions lost. Applicants proposing to enhance wetlands or associated buffers shall demonstrate: a. How the proposed enhancement will increase the wetland’s or the buffer’s functions; b. How this increase in function will adequately compensate for the impacts; and c. How all other existing wetland functions at the mitigation site will be protected. 4. Preservation of wetlands. The removal of a threat to, or preventing the decline of, wetlands by an action in or near those wetlands. Preservation includes activities commonly associated with the protection and maintenance of wetlands and their buffers through the implementation of appropriate legal and physical mechanisms such as recording a critical area tract as set forth in KCC 11.06.101 and providing structural protection like fences and signs. Preservation does not result in a gain of aquatic resource area or functions but may result in a gain in functions over the long term. D. Acreage replacement and enhancement ratio. Wetland alterations shall be replaced or enhanced using the formulas in Table 11.06.660(D)(2). 1. The director may choose to double mitigation ratios in instances where wetlands are filled or negatively affected as a result of code violations. The first number specifies the acreage of wetland to be enhanced, restored, or created and the second specifies the acreage of wetland permanently impacted. These ratios do not apply to remedial actions resulting from illegal alterations. 2. Ratios for rehabilitation and enhancement may be reduced when combined with 1:1 replacement through re-establishment or creation for some wetlands as per Table 11.06.660(D)(2). Table 11.06.660(D)(2) – Compensation Ratios for Permanent Wetland Impacts | Category of Impacted Wetland | Re-establishment or Creation | Rehabilitation Only | Preservation | Re-establishment or Creation (R/C) and Rehabilitation (RH) | Re-establishment or Creation (R/C) and Enhancement (E) | Enhancement Only | Wetland rating based on special characteristics | Category I bog | Not possible | Not possible | 24:1 | Not possible | Not possible | Not possible | Category I wetlands of high conservation value | Consult with WA DNR | Consult with WA DNR | 24:1 | Not possible | Not possible | Consult with WA DNR | Category I forested | 6:1 | 12:1 | 24:1 | 1:1 R/C and 10:1 RH | 1:1 R/C and 20:1 E | 24:1 | Wetland rating based on score for functions | Category I | 4:1 | 8:1 | 16:1 | 1:1 R/C and 6:1 RH | 1:1 R/C and 12:1 E | 16:1 | Category II | 3:1 | 6:1 | 12:1 | 1:1 R/C and 4:1 RH | 1:1 R/C and 8:1 E | 12:1 | Category III | 2:1 | 4:1 | 8:1 | 1:1 R/C and 2:1 RH | 1:1 R/C and 4:1 E | 8:1 | Category IV | 1.5:1 | 3:1 | 6:1 | 1:1 R/C and 1:1 RH | 1:1 R/C and 2:1 E | 6:1 E. Decreased wetland mitigation ratio. The director may decrease the required wetland mitigation ratio where the applicant provides the mitigation in advance of altering the wetland, and a minimum acreage replacement ratio of 1:1 is provided. In such a case, the mitigation must be in place, monitored for three growing seasons, and be deemed a success prior to allowing any alterations. F. Buffer mitigation ratios. Compensatory buffer mitigation shall replace buffer acreage and functions lost from development. Permanent impacts to wetland buffers shall be mitigated at a 1:1 ratio. Temporary impacted wetland buffer areas shall be replanted with vegetation that meets the performance standards set forth in KCC 11.06.550(C)(1). G. Wetland mitigation bank or in-lieu fee program. The city may approve mitigation banking or in-lieu fee mitigation as a form of compensatory mitigation for wetland impacts when the provisions of KCC 11.06.560(F) are met. H. Wetland type. In-kind compensation shall be provided except that out-of-kind compensation may be accepted where: 1. The wetland system to be replaced is already significantly degraded and out-of-kind replacement will result in a wetland with greater functional value. 2. Technical problems such as exotic vegetation and changes in watershed hydrology make implementation of in-kind compensation impracticable. 3. Out-of-kind replacement will best meet identified regional goals (e.g., replacement of historically diminished wetland types). I. Advance mitigation. Mitigation for projects with pre-identified impacts to wetlands may be constructed in advance of the impacts if the mitigation is implemented according to federal rules, state policy on advance mitigation, and state water quality regulations. J. Location. Compensatory mitigation actions shall be conducted onsite or within the same sub-basin as the impact site unless the applicant can demonstrate that: 1. The hydrology and ecosystem of the original wetland and those who benefit from the hydrology and ecosystem will not be substantially damaged by the onsite loss. 2. Onsite compensation is not feasible due to problems with hydrology, soils, or other factors. 3. Compensation is not practical due to potentially adverse impacts from surrounding land uses. 4. Existing functional values at the site of the proposed restoration are significantly greater than lost wetland functional values. 5. Adopted goals for flood storage, flood conveyance, habitat, or other wetland functions have been established and strongly justify location of compensatory measures at another site. K. Offsite compensation. Offsite compensation shall occur within the Green River watershed, unless: 1. Established watershed goals for water quality, flood storage or conveyance, habitat, or other wetland functions have been established by the city and strongly justify location of mitigation at another site; 2. Credits from a state-certified wetland mitigation bank are used as compensation, and the use of credits is consistent with the terms of the certified bank instrument; or 3. Fees are paid to an approved in-lieu fee program to compensate for the impacts. L. Offsite compensation site selection. When considering offsite mitigation, preference should be given to using alternative mitigation, such as a mitigation bank, an in-lieu fee program, or advanced mitigation. Applicants shall pursue siting in the following order of preference: 1. Upland sites which were formerly wetlands or significantly degraded wetlands. Such wetlands are typically small; have only one wetland class; and have one dominant plant species or a predominance of exotic species. 2. Idle upland sites generally having bare ground or vegetative cover consisting primarily of exotic introduced species, weeds, or emergent vegetation. 3. Other disturbed upland. M. Timing. Where feasible, compensatory projects shall be completed prior to activities that will permanently impact wetlands or wetland buffers, or immediately after activities that will temporarily impact wetlands or wetland buffers, or prior to use or occupancy of the activity or development which was conditioned upon such compensation. Construction of compensation projects shall be timed to reduce impacts to existing fisheries, wildlife, and flora. N. Completion of mitigation construction. On completion of construction, any approved mitigation project must be signed off by the applicant’s qualified professional and approved by the department. A signed letter from the professional will indicate that the construction has been completed as approved, and approval of the installed mitigation plan will begin the monitoring period if appropriate. The qualified professional shall also provide the stamped approved mitigation plan that was implemented and reference this plan in the letter. O. Mitigation Plan. For projects that involve wetland or wetland buffer impacts, the submittal of a mitigation plan prepared by a qualified professional shall be required, meeting the following minimum standards: 1. Critical area report for wetlands. A critical area report for wetlands shall accompany or be included in the compensatory mitigation plan and include the information described in KCC 11.06.070(B) and 11.06.590(C). 2. Mitigation plan and plan sheets. The report shall include a compensatory mitigation plan and scaled plan sheets that contain, at a minimum, the elements listed below. Full guidance can be found in Wetland Mitigation in Washington State – Part 2: Developing Mitigation Plans (Version 1) (Ecology Publication No. 06-06-011b, as currently exists and is later amended). a. The compensatory mitigation plan shall be prepared by a qualified professional and contain, at a minimum: i. The name, qualifications, and contact information of the primary author(s) of the compensatory mitigation plan; a summary of the impacts and proposed compensation concept; identification of all the local, state, and federal wetland-related permits required for the project; and a vicinity map for the project. ii. Description of the existing wetland and buffer areas proposed to be altered. Include acreage or square footage, water regime, vegetation, soils, functions, landscape position, and surrounding land uses. Also describe impacts in terms of acreage by Cowardin classification, hydrogeomorphic classification, and wetland rating. iii. Description of the compensatory mitigation site, including location and rationale for selection. Include an assessment of existing conditions, together with acreage or square footage of wetlands and uplands, water regime, sources of water, vegetation, soils, functions, landscape position, and surrounding land uses. Estimate future conditions in this location if the compensation actions are not undertaken. iv. Description of surface and subsurface hydrologic conditions, including an analysis of existing and proposed hydrologic regimes for enhanced, established, or restored compensatory mitigation areas. Include illustrations of how data for existing hydrologic conditions were used to determine the estimates of future hydrologic conditions. v. Description of the proposed actions for compensation of wetland and buffer areas affected by the project. Include overall goals of the proposed mitigation, including a description of the targeted functions, hydrogeomorphic classification, and expected categories of wetlands. vi. Description of the proposed mitigation construction activities and timing of activities. vii. Performance standards (measurable standards for years post-installation) for wetland and buffer areas, a monitoring schedule, a maintenance schedule, and actions proposed by year. viii. Discussion of ongoing management practices that will protect wetlands after the project has been implemented, including proposed monitoring and maintenance programs (for remaining wetlands and compensatory mitigation wetlands). ix. Bond estimate for the entire compensatory mitigation work, including the following elements: site preparation, plant materials, construction materials, installation and oversight, maintenance at least twice per year for at least five years, annual monitoring and reporting per KCC 11.06.570, contingency actions for a maximum of the total required number of years for monitoring, and removal of all non-natural site implements (e.g., irrigation equipment, construction fencing, plant protectors, weed barrier fabric) by the end of the monitoring period. x. Proof of establishment of notice on title as set forth in KCC 11.06.102 for the remaining wetlands and buffers on the development project site (if any) and critical areas tracts or easements as set forth in KCC 11.06.101 for the compensatory mitigation areas. b. The scaled plan sheets shall contain, at a minimum: i. Mapped, ground-verified edges of the existing wetland and buffers, proposed areas of wetland and/or buffer impacts, and location of proposed wetland and/or buffer compensation actions. ii. Existing topography, ground-verified, at two-foot contour intervals in the zone of the proposed compensation actions if any grading activity is proposed in the compensation area(s). Also include existing cross-sections (estimated one-foot intervals) of wetland areas on the development site that are proposed to be altered and of the proposed areas of wetland and buffer compensation. iii. Conditions expected from the proposed actions onsite, including future hydrogeomorphic classes, vegetation community types (e.g., Cowardin class), and future hydroperiods. iv. Required wetland buffers for existing wetlands and proposed compensation areas. Also identify any zones where buffers are proposed to be reduced or enlarged outside of the standards identified in this chapter. v. A planting plan for the compensation area, including all species by proposed community type and hydroperiod, size and type of plant material to be installed, spacing of plants, typical clustering patterns, total number of each species by community type, and timing of installation.
(Ord. No. 3746, § 3, 4-19-05; Ord. No. 3805, § 1, 8-15-06; Ord. No. 4159, § 1, 7-21-15; Ord. No. 4249, § 1, 6-20-17; Ord. No. 4542, § 64, 6-16-26)
Ask a question about Kent law
Corpus searches the Kent sections it holds and shows the ones that match, with their citations. Free, no sign-in.