§ 11.06.750 — Buffers and building setback lines. Revised 8/26
Kent City Code (current through Ordinance 4547, passed August 18, 2026) · Kent City Code § 11.06.750
Corpus is an independent public-information project, not the official City of Kent website. Stable reference: corpuslaw.us/code/96785a71-e736-4ab9-8854-eec4eca4ec5e
11.06.750 Buffers and building setback lines. Revised 8/26
A. A buffer shall be established to protect landslide hazard areas. Buffers and setbacks shall be established from the top, bottom, and sides of critical areas. Unless permitted by the director, native vegetation within buffer areas shall not be altered, and shall remain in its natural state. Minimum buffer width from identified landslide hazard areas shall be equal to the vertical height of the landslide hazard area or 50 feet, whichever is greater, for all landslide hazard areas that measure 10 feet or more in vertical elevation change from top to toe of slope, as identified in the geotechnical report, maps, and field-checking. No disturbance may occur within the buffer except as provided within this chapter. The department shall establish the width of the buffer based upon consideration of the following factors: 1. The recommendations contained in the geotechnical report required by this chapter; provided, that it is prepared by a qualified professional. 2. The sensitivity of the landslide hazard in question. 3. The type and intensity of the proposed land use, whether the proposed use may affect the landslide hazard, or whether the use itself will be affected by the landslide hazard. B. All buffers shall include a minimum 15-foot building setback line (BSBL) in addition to the designated buffer of the identified landslide hazard area. C. When the geotechnical report demonstrates that, due to application of design and engineering solutions, lesser buffer and setback distances will meet the intent of this regulation, the department may permit a reduced buffer and setback distance as follows: 1. The buffer may be reduced when a qualified professional demonstrates to the department’s satisfaction that the reduction will adequately protect the proposed development, adjacent developments and uses, and the subject critical area. In no case shall the buffer be less than 25 feet. 2. To increase the functional attributes of the buffer, the department may require that the buffer be enhanced through planting of indigenous species. 3. The edge of the buffer area shall be clearly staked, flagged, and fenced prior to any site clearing or construction. The buffer boundary markers shall be clearly visible, durable, and permanently affixed to the ground. Site clearing shall not commence until the engineer has submitted written notice to the department that buffer requirements of this regulation are met. Field marking shall remain until all construction and clearing phases are completed and final approval has been granted by the department.
(Ord. No. 3746, § 3, 4-19-05; Ord. No. 4159, § 1, 7-21-15; Ord. No. 4542, § 73, 6-16-26)
Ask a question about Kent law
Corpus searches the Kent sections it holds and shows the ones that match, with their citations. Free, no sign-in.