For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11.06.790 — Critical aquifer recharge area performance standards. Revised 8/26

Kent City Code (current through Ordinance 4547, passed August 18, 2026) · Kent City Code § 11.06.790

Corpus is an independent public-information project, not the official City of Kent website. Stable reference: corpuslaw.us/code/3f73c05d-3c07-4fcb-9125-81164c3aa5dd

11.06.790 Critical aquifer recharge area performance standards. Revised 8/26

A. General requirements applicable to all critical aquifer recharge areas. 1. Fundamental protection standard. Activities may only be permitted in a critical aquifer recharge area if the applicant can show that the proposed activity will not cause contaminants to enter the aquifer and that the proposed activity will not adversely affect the recharging of the aquifer. 2. Regulatory compliance. The proposed activity must comply with the water source protection requirements and recommendations of the United States Environmental Protection Agency, Washington State Department of Health, and Public Health – Seattle and King County. 3. Stormwater management. The following performance standards apply: a. The proposed storm water management facilities must be designed and constructed in accordance with the Kent Surface Water Design Manual, as currently exists and is later amended. b. Within wellhead protection areas, stormwater infiltration facilities shall maintain appropriate separation from the seasonal high groundwater table as specified in the Kent Surface Water Design Manual, as currently exists and is later amended. 4. Abandoned wells. In any critical aquifer recharge area, the property owner shall properly decommission any abandoned well using techniques approved by the Washington State Department of Ecology. B. Category-specific performance standards. 1. The following enhanced standards apply to all development proposals in Category I areas: a. Underground storage tanks standards. All new underground storage facilities proposed for use in the storage of hazardous substances or hazardous wastes shall be designed and constructed so as to: i. Prevent releases due to corrosion or structural failure for the operational life of the tank. ii. Be protected against corrosion, constructed of noncorrosive material, steel clad with a noncorrosive material, or designed to include a secondary containment system to prevent the release or threatened release of any stored substances. iii. Use material in the construction or lining of the tank that is compatible with the substance to be stored. b. Above ground storage tank standards. All new above ground storage facilities proposed for use in the storage of hazardous substances or hazardous wastes shall be designed and constructed so as to: i. Not allow the release of a hazardous substance to the ground, groundwaters, or surface waters. ii. Have primary containment areas enclosing or underlying the tank or part thereof. iii. A secondary containment system either built into the tank structure or a dike system built outside the tank for all tanks. iv. Be covered to prevent rainwater from filling secondary containment areas. c. Vehicle repair and servicing. Vehicle repair and servicing must be conducted over impermeable pads and within a covered structure capable of withstanding normally expected weather conditions. Chemicals used in the process of vehicle repair and servicing must be stored in a manner that protects them from weather and provides containment should leaks occur. d. Enhanced monitoring. The director may require groundwater monitoring wells for facilities with high contamination potential. 2. The following enhanced standards apply to all development proposals in Category II areas: a. Storage tank compliance. All storage tanks proposed to be located in a critical aquifer recharge area must comply with all applicable laws and regulations including, but not limited to, the Washington State Department of Ecology and city requirements. b. Best management practices. The director shall determine the implementation of appropriate best management practices for activities involving potential groundwater contamination. 3. Specific use standards applicable to all critical aquifer recharge areas: a. Dry wells that receive runoff from pollution-generating impervious surfaces are prohibited within mapped critical aquifer recharge area wellhead protection areas. b. Dry wells receiving roof-only runoff may be allowed with the approval of the department, if the applicant can demonstrate compliance with: i. Washington State underground injection control wells program requirements, including registration and adherence to the “does not endanger groundwater” standard, Chapter 173-218 WAC; and ii. All applicable design, pretreatment, and hydrogeologic suitability criteria in the Kent Surface Water Design Manual, as currently exists and is later amended. c. Existing dry wells. Dry wells existing on a site prior to development or redevelopment must be abandoned using State Department of Ecology approved techniques unless approved under subsection (B)(3)(b)(ii) of this section. d. Substantial improvements. For substantial improvements to existing facilities in critical aquifer recharge areas, compliance upgrades may be required as determined by the director based on category and risk assessment.

(Ord. No. 3746, § 3, 4-19-05; Ord. No. 4159, § 1, 7-21-15; Ord. No. 4542, § 77, 6-16-26)

Ask a question about Kent law

Corpus searches the Kent sections it holds and shows the ones that match, with their citations. Free, no sign-in.