For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.11.020 — Definitions

Kent City Code (current through Ordinance 4547, passed August 18, 2026) · Kent City Code § 12.11.020

Corpus is an independent public-information project, not the official City of Kent website. Stable reference: corpuslaw.us/code/275edcde-816e-4186-a271-2d760fc394c7

12.11.020 Definitions.

For purposes of this chapter, the following definitions apply: Affected arterial means any street which can be identified as significant to the area in which it serves in terms of the nature and composition of travel and which will be impacted by new development. Arterials serve major centers of activity and carry the major portion of the traffic entering and leaving the city. Affected intersection means a designated signalized intersection as set forth in KCC 12.11.100 within a traffic zone (mobility management zone) in the city over which the city has operational responsibility and which will be impacted by new development. Application means any development proposal and accompanying traffic analysis as required in this chapter used to determine the impact on each facility and/or mobility management zone it affects. Area-average level-of-service means the sum of volumes on critical arterials and at key intersections as defined in Highway Capacity Manual Special Report No. 209 dated December, 1985, divided by the sum of the capacity on critical arterials and at key intersections within a mobility management zone. Background traffic means the volume of traffic that currently exists on the street system prior to date of occupancy of a proposed development. Background traffic includes all existing traffic and the anticipated traffic from all development proposals which have been approved under this chapter. Capacity means the maximum traffic volume that can pass through an intersection or arterial during a given peak hour as measured by the sum of critical volumes as defined in the Highway Capacity Manual Special Report 209 dated December, 1985. Capital facilities plan (CFP) means the six (6) year plan for capital improvements that support the city’s current and future population and employment growth. It contains level of service (LOS) standards for each public facility, a financing plan for necessary facilities, and requires that new development is served by adequate facilities for which concurrency is required under this chapter. The CFP also contains broad goals and specific policies for all public facilities. Capital improvement means land, improvements to land, structures (including design, permitting, and construction), initial furnishings and selected equipment. Capital improvements have an expected useful life of at least five (5) years and a cost of at least twenty-five thousand dollars ($25,000). Other capital costs, such as motor vehicles and motorized equipment, computers and office equipment, office furnishings, and small tools are considered to be non-capacity capital expenses in the city’s annual capital improvement plan budget, and are not capacity capital improvements for the purposes of the comprehensive plan, or the issuance of development permits. Concurrency means a requirement of the 1990 Growth Management Act (RCW 36.70A.070(6)) requiring that the city may only permit development approval if a development would not cause level of service to fall below the city’s adopted standard, except for transportation facilities where revenues are or may be secured to complete mitigating transportation improvements or strategies within six (6) years. When a development fails to meet the concurrency test, mitigation will require improvements or strategies to accommodate the impacts of the development. Demand management and other non-roadway strategies may be used for transportation mitigation. Concurrency is further defined in KCC 12.11.050. Degradation means an increase in the volume/capacity ratio (V/C ratio) above the area-wide level of service (LOS) standard for a mobility management zone as established in KCC 12.11.060. Development means construction and/or substantial modification of structures or improvements to land which will alter, modify and/or expand a use of land in a manner that may cause adverse impacts. Development permit or approval means any document granting, or granting with conditions, a rezone, plat, planned unit development, conditional use permit, shoreline substantial development permit, building permit, or any other official action of the city having the effect of authorizing the development of land. 1. Final development permit. A building permit or any other development permit which results in an immediate and continuing impact upon public facilities. 2. Preliminary development approval. Including, but not limited to, a rezone, plat, planned unit development, or shoreline substantial development permit. Director means the public works director for the city of Kent, the director’s authorized representative or any representative authorized by the mayor. Funded project means a project in the most recently adopted capital facilities plan (CFP) for the city or similar capital program of another jurisdiction which has sufficient revenues secured for construction or which meets the facility concurrency requirements of KCC 12.11.050. Level of service (LOS) standard means, for the purpose of this chapter, a qualitative estimate of the performance efficiency of the city’s transportation facilities and is tailored for each of the city’s twenty-two (22) mobility management zones (MMZ), reflecting distinct roadway conditions and multiple community objectives. LOS standards for arterials, transit and pedestrian/bicycles within each of the twenty-two (22) zones are set forth in KCC 12.11.100 below. Mitigation means, for the purposes of this chapter, transportation demand management strategies and/or facility improvements constructed or financed by a developer which return a degraded area-average level of service to the standard established for that area. If an area is already exceeding the standard prior to the development proposal, mitigation shall mean transportation demand management strategies and/or facility improvements constructed or financed by a developer to return the degraded area-average level of service to at least the level-of-service established for that area. Mobility management zones (MMZ) means distinct transportation areas within the city limits and the city’s potential annexation area with boundaries based on certain criteria as set forth in the city’s comprehensive transportation plan, which is a supporting document to the city’s comprehensive plan. Mobility management zones are set forth in KCC 12.11.100. Some mobility management zones include intersections and arterials outside the city’s jurisdiction. Peak hour means the consecutive sixty (60) minute period between the hours of 4:00 p.m. and 6:00 p.m. which experiences the highest sum of traffic volumes as determined by the city on a roadway segment or passing through an intersection. This is also referred to in this chapter as the “p.m. peak hour.” Peak hour trips means total vehicular trips entering and leaving a project during the peak hour on adjacent streets, as defined in the most recent ITE Trip Generation Manual, published by the Institute of Transportation Engineers. Other trip generation sources subject to approval by the director may be used where ITE data is based on a limited survey sample or where there may be special trip-generating characteristics of the proposal. Phased development means any development involving multiple buildings or improvements where issuance of development permits would not occur at the same time, but be phased over a period of time. Public facilities means the capital improvements and systems of the transportation facilities and/or services requiring concurrency. Site specific improvements means improvements made to transportation systems, the need for which results directly from a development permit or decision made under the Kent Zoning Code or other provisions of the Kent City Code relating to development permits. For transportation facilities, such improvements may include, but are not limited to, site access, turning lanes, traffic signals, changes in traffic signal operation and modification of intersection geometrics. Site specific improvements include right-of-way and related frontage improvements when they are required to be dedicated or constructed at the time of building permit issuance. Supplemental links and intersections means an intersection or roadway link which contributes to the system function within each mobility management zone. System intersections within the mobility management zones are listed and mapped in KCC 12.11.100 with levels of service for each zone. Transportation demand management (TDM) means public and/or private programs designed to increase the efficiency of existing capital transportation facilities, including, but not limited to, transit and ride sharing incentives, flexible working hours, parking management, and supporting non-motorized enhancements to decrease single occupancy vehicle trips. Transportation facilities means streets, roads, highways, sidewalks, street and road lighting systems, traffic signals, non-motorized enhancements, and related systems and site specific improvements. Under construction means when a construction contract for a project has been awarded or actual physical alteration or improvement has occurred on the site. Volume/capacity ratio (v/c ratio) means the proportion of available intersection capacity used by vehicles passing through an intersection as defined in the Highway Capacity Manual Special Report 209 dated December, 1985.

(Ord. No. 3284, § 1, 3-19-96)

Ask a question about Kent law

Corpus searches the Kent sections it holds and shows the ones that match, with their citations. Free, no sign-in.