For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.02.090 — Installation and connection charges inside city limits, permits, and inspection fees

Kent City Code (current through Ordinance 4547, passed August 18, 2026) · Kent City Code § 7.02.090

Corpus is an independent public-information project, not the official City of Kent website. Stable reference: corpuslaw.us/code/3777b741-b928-440c-87c4-776458791998

7.02.090 Installation and connection charges inside city limits, permits, and inspection fees.

A. Tap charge – Connection by water utility. Any property owner within the city limits applying for water service shall pay in full a tap charge and a permit review and inspection fee, plus a system development charge prior to issuance of the water service permit. The tap charge will include the cost of connection and laying the pipe from the city water main to the property line of the property to which service is desired, or at a distance of 60 feet from the main toward such property line, whichever is shorter. The minimum tap charge so established for service installed by the water utility is as follows: 1. Two hundred seventy-five dollars for each five-eighth-inch by three-quarter-inch connection. 2. Three hundred twenty-five dollars for each three-quarter-inch connection. 3. Three hundred fifty dollars for each one-inch connection. 4. Six hundred dollars for each one-and-one-half-inch connection. 5. Eight hundred dollars for each two-inch connection. On any connection over two inches, the minimum tap charge shall be the actual cost of the meter and installation, plus 25 percent. B. Tap charge – Connection by licensed contractor. If the workload of the water utility as determined by the director of public works is such that the installation of the water connection would interfere with the proper operation and maintenance of the water system, the director of public works may require that the property owner employ a licensed contractor to make the connection and install the necessary line and materials except the water meter. All such water services shall meet or exceed the standards and specifications approved by the director of public works. The minimum tap charge is as follows: 1. One hundred dollars for each five-eighth-inch by three-quarter-inch connection. 2. One hundred twenty-five dollars for each three-quarter-inch connection. 3. One hundred seventy-five dollars for each one-inch connection. 4. Three hundred sixty dollars for each one-and-one-half-inch connection. 5. Five hundred dollars for each two-inch connection. All such contractor-installed connections shall be guaranteed by the contractor for a period of one year. C. System development charge. The system development charge is as follows: | Meter Size (inches) | Charge Effective Through March 31, 2009 | Charge Effective April 1, 2009 | Less than 1 | $2,600 | $5,949 | 1 | $4,627 | $14,872 | 1-1/2 | $10,400 | $29,743 | 2 | $18,486 | $47,589 | 3 | $41,594 | $95,179 | 4 | $73,933 | $148,717 | 5 | $115,528 | $222,932 | 6 | $166,376 | $297,434 | 8 | $295,786 | $475,894 | 10 | $462,162 | $654,354 After April 1, 2009, this system development charge will increase annually, on the first day of each calendar year, by an amount equal to the percentage increase in the Construction Price Index for Seattle-Tacoma-Bremerton for the 12 months, October 31st through September 30th, of the previous calendar year. However, if (1) the city’s fire marshal has required that, in conjunction with the city’s issuance of a single-family residential building permit, the applicant must install a fire sprinkler system, and (2) the need for a meter size greater than three-quarters of an inch is based solely on the fire marshal’s requirement that the sprinkler system be installed, the single-family residential permit applicant shall pay only the system development charge listed above for a meter less than one inch in diameter. It is not the city’s intent to require an applicant to pay a higher system development charge when the larger meter size is needed only in the unusual event of a fire demand rather than for normal daily user demand. D. Permit and inspection fee. The city council shall, by resolution, establish the permit, inspection, and other related fees to be assessed to implement and operate the regulations adopted in this chapter. In the event of any conflict or ambiguity regarding any fees established by council resolution, the public works director is authorized to interpret the fee schedule(s) to resolve that conflict or ambiguity. E. Installation of undersized meter. If an undersized meter is installed, a deduction will be allowed from the above charges, including system development charges, which will reflect the difference in cost between the undersized meter and the regular size meter. All service material (including water meter) will remain the property of the city. F. Tap change. If the tap is changed to one of a larger size, the cost and expense of such charge must be paid before the larger size tap is installed. G. Paving replacement – Charge. If it becomes necessary during the installation of such connection on a time and material basis to break and replace either concrete or blacktop paving, then in each instance an additional charge shall be made to cover the cost of such repair. H. Fee deferral. Until December 31, 2013, at the time of issuance of any single-family residential building permit for a dwelling unit that is being constructed for initial sale, the owner of the subject real property may defer payment of the water system development charge in subsection (A) of this section, executing a first position lien in favor of the city in the amount of the water system development charge. The city shall record the lien against the real property and the lien amount shall be paid by the seller to the city at the time of closing of the sale of the real property and single-family residence. An owner who chooses to defer the water system development charge must combine the lien with a lien deferring the transportation improvement fee in KCC 12.11.090 or Chapter 43.21C RCW, and drainage system development charge in KCC 7.05.160.

(Ord. No. 4288, § 2, 11-20-18)

Ask a question about Kent law

Corpus searches the Kent sections it holds and shows the ones that match, with their citations. Free, no sign-in.