§ 7.12.190 — Construction provisions and technical standards
Kent City Code (current through Ordinance 4547, passed August 18, 2026) · Kent City Code § 7.12.190
Corpus is an independent public-information project, not the official City of Kent website. Stable reference: corpuslaw.us/code/85a0df0c-69c6-4d1e-9ac9-dfa043f65af6
7.12.190 Construction provisions and technical standards.
The following construction provisions and technical standards apply to every franchise for cable service awarded in the city, except as may be specifically and subsequently modified by any awarded franchise. If the franchise is silent on the issue, the provisions set forth in this chapter shall apply. A. Provision of quality cable service. In addition to satisfying any requirement established in a franchise, every cable operator shall ensure the policies and practices stated below are adhered to during the operation of any cable system within the city, unless any stated policy or practice is expressly prohibited by applicable law. The city retains the discretion to evaluate any franchise proposal, and impose construction and service availability requirements in a franchise in order to meet the needs of the community. 1. Availability of cable service to subscribers. a. Cable plant facilities within 125 feet of structure to be served. A cable operator must extend cable service as a standard installation to any person or to any government building that requests cable service within the city or, if smaller, its franchise area within seven business days of the request, where service can be provided by activating or installing a drop within 125 feet of the structure to receive service. b. Cable plant facilities beyond 125 feet of structure to be served. In cases where a potential subscriber’s structure is more than 125 feet from cable operator’s existing cable plant, an operator must still provide service as a nonstandard installation, so long as the potential subscriber agrees to bear a share of extension or installation costs equal to the cable operator’s incremental cost of that portion of the extension that exceeds the 125-foot limit required to be provided under subsection (A)(1)(a) of this section. A cable operator that requires a potential subscriber to bear a portion of installation or extension costs must prepare and provide the potential subscriber a written estimate of the extension costs within seven business days of a request for an installation. Any estimate shall indicate the portion of costs attributable to both the cable operator and the subscriber. c. Other technologies. Notwithstanding subsection (A)(1)(a) and (b) of this section, if a cable operator’s cable system is not constructed in a manner that is technologically compatible with cable plant availability requirements set forth above, the parties shall negotiate provisions in the cable franchise that address service availability standards in a manner that is compatible with the cable operator’s technology and mirrors the obligations in subsection (A)(1)(a) and (b) of this section as closely as reasonably possible. 2. Extension of distribution line – Charges. Unless otherwise provided for in a franchise, cable service shall be available to all residents within the city, provided there are at least 35 dwelling units per street mile. In the event a request is made for service by a resident living in an area not meeting such criteria, the cable operator shall enter into a contractual agreement with the resident requesting service wherein the operator shall be reimbursed for its construction costs. Whenever any subsequent subscriber who did not contribute to the original cost of the extension connects to the extended distribution service line, that subscriber shall pay his or her pro rata share directly to the operator prior to obtaining cable service. The cable operator shall then promptly tender such payment to the original subscriber so long as the agreement remains in force. Reimbursement shall be calculated on a front foot basis as a percentage of the total cost of the service line extension. Reimbursements shall be made to the original subscriber for a period of up to five years or to the point when the original subscriber has recovered its incremental costs for construction of the distribution service line. The operator shall record its contractual agreement with the original subscriber in the King County recorder’s office before any subsequent subscriber may connect to the extended service line. B. System maintenance and technical quality. A cable operator shall maintain all transmission equipment as necessary to carry a quality signal to subscribers from the access facilities provided under this chapter or any franchise. C. Cable operator facilities in the community. Cable operator will properly maintain and promptly repair all cable operator-owned equipment (boxes, connectors, etc.) on private, public, or city right-of-way property to avoid the creation or maintenance of a public nuisance in violation of Chapter 8.01 KCC. D. Emergency alert capability. A cable operator shall provide an emergency alert system (“EAS”) and comply with all applicable law and franchise provisions.
(Ord. No. 4224, § 2, 12‑13‑16)
Ask a question about Kent law
Corpus searches the Kent sections it holds and shows the ones that match, with their citations. Free, no sign-in.