§ 21.49.083 — Large Customer Renewable Generation Program
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 21.49.083
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/04f201e5-6a82-4a05-9f78-eecab31a7d1e
21.49.083 - Large Customer Renewable Generation Program
A. The Large Customer Renewable Generation Program shall be open to customers operating solar photovoltaic (PV) arrays or other qualified generation systems, as defined in RCW 19.29A.090(3) and 19.29A.090(4), sized larger than 100 kW and not greater than 5 mW, measured as alternating current (AC). The Department may consider including other renewable systems or systems larger than 5 mW on a case-by-case basis. To be eligible for the program, a generation system must be connected to a customer premises located within the Department's service territory and be equipped with a two-way advanced meter capable of measuring both consumption and outbound power exports. B. To participate, customers must enter into an interconnection agreement with the Department and to comply with all its terms. The Department may adopt any interconnection requirements as necessary to protect public safety and system reliability. C. Large Customer Renewable Generation program customers shall be metered, billed, and credited according to the following provisions: 1. The customer's two-way advanced meter will measure accumulated kilowatt hours of inbound retail consumption and outbound exported power. 2. Any electricity produced by the customer's system may be used to reduce inbound retail electricity consumption at the customer's rate schedule for electric service. 3. Electricity generated in excess of that consumed by the customer may be exported to the Department's system. Accumulated kWh of exported electricity shall be measured by the advanced meter and each customer will be credited for exported electricity according to the same Large Customer Renewable Export Rate, which reflects the value of the power and grid benefits. Large Customer Renewable Export Rate Effective January 1, 2023 Export Credit cents per kWh | 4.96 Export Credit | Effective January 1, 2025 All days in January cents per kWh | 5.90 All days in February cents per kWh | 5.00 All days in March cents per kWh | 4.30 All days in April cents per kWh | 6.00 All days in May cents per kWh | 3.10 All days in June cents per kWh | 4.20 All days in July cents per kWh | 7.70 All days in August cents per kWh | 8.70 All days in September cents per kWh | 9.40 All days in October cents per kWh | 6.90 All days in November cents per kWh | 6.10 All days in December cents per kWh | 4.80 4. The customer shall retain ownership of all environmental, social, and other non-power attributes of the electricity produced by their system, irrespective of whether it is consumed on-site or exported. 5. Customers totalizing multiple meters per Section 21.49.090 may integrate their system into their totalized service. Otherwise, meter aggregation across multiple customer premises shall not be permitted. 6. Customers that permit and complete buildings under the terms of the Living Building Pilot outlined in Section 23.40.060, or receive Living Building Challenge certification for a building within City Light service areas outside of Seattle before December 31, 2025, or buildings meeting high energy efficiency standards as determined by the Department, will receive annual net metering as described in Section 21.49.082. The maximum system allowed under this provision is 250 kW. Affordable housing performing under high energy efficiency standards as determined by the Department may receive net metering for systems up to 500 kW. 7. Until December 31, 2035, the Department will honor the terms of the large Customer Renewable Generation program for interconnected participants and guarantee an annual export rate of at least 1.8 cents per kWh, as calculated by the average of the monthly prices.
(Ord. 127122, § 9, 2024; Ord. 126677, § 9, 2022; Ord. 125903, § 1, 2019.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.
