§ 22.800.080 — Authority
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.800.080
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/c0e8ccda-74b8-432c-90fc-61b09ee3d1a3
22.800.080 - Authority
A. For projects not conducted in the public right-of-way, the Director of SDCI has authority regarding the provisions of this subtitle pertaining to grading, review of drainage control plans, and review of construction stormwater control plans, and has inspection and enforcement authority pertaining to temporary erosion and sediment control measures. B. The Director of SPU has authority regarding all other provisions of this subtitle pertaining to drainage water, drainage, and erosion control, including inspection and enforcement authority. The Director of SPU may delegate authority to the Director of SDCI or the Director of SDOT regarding the provisions of this subtitle pertaining to review of drainage control plans, inspection of drainage control facilities, review of construction stormwater control plans, and inspection and enforcement authority pertaining to temporary erosion and sediment control measures for projects conducted in the public right-of-way. C. The Directors of SDCI, SDOT, and SPU are authorized to take actions necessary to implement the provisions and purposes of this Subtitle VIII in their respective spheres of authority to the extent allowed by law, including, but not limited to, the following: promulgating and amending rules and regulations, pursuant to the Administrative Code, Chapter 3.02; establishing and conducting inspection programs; establishing and conducting or, as set forth in Section 22.802.040, requiring responsible parties to conduct monitoring programs, which may include sampling of discharges to or from drainage control facilities, the public drainage system, or receiving waters; taking enforcement action; abating nuisances; promulgating guidance and policy documents; and reviewing and approving, conditioning, or disapproving required submittals and applications for approvals and permits. The Directors are authorized to exercise their authority under this Subtitle VIII in a manner consistent with their legal obligations as determined by the courts or by statute. D. The Director of SPU is authorized to develop, review, or approve drainage basin plans for managing receiving waters, drainage water, and erosion within individual basins. A drainage basin plan may, when approved by the Director of SPU, be used to modify requirements of this subtitle, provided the level of protection for human health, safety and welfare, the environment, and public or private property will equal or exceed that which would otherwise be achieved. A drainage basin plan that modifies the minimum requirements of this subtitle at a drainage basin level subject to the municipal stormwater NPDES Permit must be reviewed and approved by Ecology and adopted by City ordinance. E. The Director of SPU is authorized, to the extent allowed by law, to develop, review, or approve an Integrated Drainage Plan as an equivalent means of complying with the requirements of this subtitle, in which the developer of a project voluntarily enters into an agreement with the Director of SPU to implement an Integrated Drainage Plan that is specific to one or more sites where best management practices are employed such that the cumulative effect on the discharge from the site(s) to the same receiving water is the same or better than that which would be achieved by a less integrated, site-by-site implementation of best management practices. F. For projects that do not discharge to the combined sewer system, the Director of SPU is authorized, to the extent allowed by law, to enter into an agreement with the developer to allow a project's flow control, water quality treatment, on-site stormwater management, or wetland protection requirements to be met at an alternative location if the following conditions are met, or if another scenario is approved by Ecology: 1. The developer enters the agreement voluntarily to contribute funds toward the construction of, or to construct, one or more drainage control facilities at an alternative location to mitigate the impacts to the same receiving water that have been identified as a consequence of the project; and 2. The alternative location is for an equivalent area in terms of flow and pollution characteristics when compared with the project, as determined by the Director; and a. The site of the project has greater than or equal to 35 percent existing hard surface coverage and the project discharges to: 1) A listed creek and the equivalent area is in-basin, which means that the equivalent area is on the same site as the project, the project is located within contributing area to the equivalent area, or the equivalent area discharges from the public drainage system to the receiving water at the same point as (or upstream of) the point where the project area discharges from the public drainage system to the same receiving water; or 2) A receiving water other than a listed creek and the equivalent area discharges to the same receiving water as the project. G. For projects that discharge to the combined sewer system, the Director of SPU is authorized, to the extent allowed by law, to enter into an agreement with the developer to allow a project's flow control or on-site stormwater management requirements to be met at an alternative location if the developer enters the agreement voluntarily to contribute funds towards the construction of, or to construct, one or more drainage control facilities at an alternative location, determined by the Director, to mitigate the impacts that have been identified as a consequence of the project. H. If the Director of SPU determines that a discharge from a site, real property, or drainage control facility, directly or indirectly to a public drainage system, a private drainage system, or a receiving water within or contiguous to Seattle city limits, has exceeded, exceeds, or will exceed water quality standards at the point of assessment, or has caused or contributed, is causing or contributing, or will cause or contribute, to a prohibited discharge or a known or likely violation of water quality standards in the receiving water or a known or likely violation of the City's municipal stormwater NPDES permit, and cannot be adequately addressed by the required best management practices, then the Director of SPU has the authority, to the extent allowed by law, to issue an order under Chapter 22.808 requiring the responsible party to undertake more stringent or additional best management practices. These best management practices may include additional source control or structural best management practices or other actions necessary to cease the exceedance, the prohibited discharge, or causing or contributing to the known or likely violation of water quality standards in the receiving water or the known or likely violation of the City's municipal stormwater NPDES permit. Structural best management practices may include but shall not be limited to: drainage control facilities, structural source controls, treatment facilities, constructed facilities such as enclosures, covering and/or berming of container storage areas, and revised drainage systems. For existing discharges as opposed to new projects, the Director may allow 12 months to install a new flow control facility, structural source control, or treatment facility after the Director notifies the responsible party in writing of the Director's determination pursuant to this subsection 22.800.080.H and of the flow control facility, structural source control, or treatment facility that must be installed. I. Unless an adjustment pursuant to subsection 22.800.040.B or an exception pursuant to subsection 22.800.040.C is approved by the Director, an owner or occupant who is required to connect, or who chooses to connect, to a public drainage system shall be required to extend the public drainage system if a public drainage system is not accessible within an abutting public area across the full frontage of the site. J. The Director of SDCI or the Director of SPU has the authority, to the extent allowed by law, to require projects with any addition or replacement of hard surface or land disturbing activity to comply with the more stringent requirements set forth in Chapter 22.805 when necessary to accomplish the purposes of this subtitle. In making this determination, the Director of SDCI or the Director of SPU may consider, but is not limited to, the following attributes of the site: location within an Environmentally Critical Area; proximity and tributary to an Environmentally Critical Area; and proximity and tributary to an area with known erosion or flooding problems.
(Ord. 126336, § 1, 2021; Ord. 124919, § 90, 2015; Ord. 124872, § 6, 2015; Ord. 123105, § 2, 2009.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.
