For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 08.02.032 — Electrical Code

Spokane Municipal Code; partial · SMC 08.02.032 · Effective

Corpus is an independent public-information project, not the official City of Spokane website. Stable reference URL

Section 08.02.032 Electrical Code

A. Electrical inspection fees for new construction are based upon the area of the building. Fees are provided in the Development Fee Schedule. B. Electrical inspection fees for alteration, repair or addition in existing buildings including finishing of tenant spaces are based on the number of circuits. The fee is provided in the Development Fee Schedule. C. There are separate inspection fees in addition to the general inspection fees listed above. Fees are provided in the Development Fee Schedule. D. Reinspections. Reinspection fees are provided in the Development Fee Schedule. E. Inspections Outside Normal Inspector Working Hours. Fees for inspections outside normal inspector working hours are provided in the Development Fee Schedule. F. Work Done Without Permit/Investigation Fees. Where work has commenced without first obtaining the required permit(s), a work without permit fee equivalent to the greater of: 1. twice the inspection fee, or 2. the permit fee plus three hundred dollars, must be paid prior to the issuance of the permit(s).

Date Passed: Monday, December 9, 2024 Effective Date: Wednesday, January 22, 2025 ORD C36619 Section 6