§ 12.08C.120 — State requirements
Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.08C.120
Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/bcacc668-1e22-4d13-b458-70a9eaaf9b7d
§ 12.08C.120: State requirements.
A. All pollutants discharged from a commercial or industrial operation to the POTW shall satisfy all applicable requirements set forth in Chapter 173-216 WAC. B. Any person who constructs or modifies or proposes to construct or modify wastewater treatment facilities shall comply with the submittal requirements set forth in Chapter 173-240 WAC. No person may commence construction or modification of a wastewater treatment facility covered under Chapter 173-340 WAC without first submitting engineering reports and plans and specifications to the Control Authority for its review and written acceptance. The City, acting through the Control Authority, is authorized as a delegated unit of local government under RCW 90.48.110(2) to review such submittals. C. Industrial users shall apply to the Control Authority for an industrial wastewater discharge permit at least ninety (90) days prior to the discharge of any pollutants other than domestic wastewater, or wastewater the Control Authority has determined to be similar in character and strength to domestic wastewater, and that there is no potential for such discharge to adversely affect the POTW. D. All significant industrial users shall apply for, obtain, and maintain compliance with, an industrial wastewater discharge permit from the Control Authority, or approval of the Control Authority of a transfer of an existing permit to the industrial user, prior to discharging pollutants. E. Claims of confidentiality shall be governed by TMC § 12.08C.910. F. Applicants for a new industrial wastewater discharge permit, or permit reissuance or modification, which allows a new or increased pollutant loading shall publish notice for each application in the format provided by the Control Authority, and in accordance with the public notice requirements set forth in TMC § 12.08C.470. G. The Control Authority may require the applicant to also mail this public notice to persons who have expressed an interest in being notified, and to state agencies and local governments with a regulatory interest, and to post the public notice on the facility. If the Control Authority determines there is sufficient public interest, it will hold a public meeting following the requirements of WAC 173-216-100. The Control Authority may, in its discretion, assume responsibility for public notice requirements for any applicant, and may waive the requirements of this section for any industrial user who is not classified as a significant industrial user. H. Discharge restrictions set forth in Chapter 173-303 WAC (Dangerous Waste) shall apply to all industrial users. I. All required monitoring data shall be analyzed by a laboratory registered or accredited under the provisions of Chapter 173-50 WAC, except for flow, temperature, settleable solids, conductivity, pH, turbidity, and internal process control parameters. However, if the laboratory analyzing samples for conductivity, pH, or turbidity must otherwise be accredited, it shall also be accredited for these parameters.
( Ord. 28761 Ex. C, 2021-05-25 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.
