§ 12.08C.340 — Industrial wastewater discharge permitting – Application contents
Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.08C.340
Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/9ed61928-fcdf-4b9e-a705-1e32f5348f2b
§ 12.08C.340: Industrial wastewater discharge permitting – Application contents.
A. All industrial users required to obtain an industrial wastewater discharge permit shall apply by using a form provided by the Control Authority. Industrial users shall submit the following information as part of their permit application unless waived by the Control Authority: 1. Identifying information. The industrial user shall submit the name and physical address of the facility, including the legal name and trade name, if any, of the owner(s), operator(s), duly authorized representative of the industrial user, and, if different than the duly authorized representative of the industrial user, the facility manager, and mailing address and contact information for each person listed; 2. Permits. The industrial user shall submit a list of any environmental permits held by or for the facility; 3. Description of operations. The industrial user shall submit the following information regarding facility operations: (i) a brief description of the nature and average rate of production (including each product produced by type, amount, process, and rate of production); (ii) the Standard Industrial Classification(s) (SIC Code) and/or the NAICS Code that applies to each operation; (iii) a list of all raw materials and chemicals used (average and maximum rates) or stored at the facility that could be accidentally or intentionally discharged to the POTW; (iv) the number of employees and a general description of the duties they perform; (v) the hours of operation; (vi) a description of each product produced by type and amount, including the rate of production, and the process used for each product produced; (viii) the types of wastes generated on a routine and periodic basis; (ix) the times and durations when wastes will be discharged; and (x) sampling locations and provisions for monitoring discharges. The description shall also include a schematic process diagram showing each process step, wastestream, treatment step, internal recycling process, and points of discharge to the POTW. This diagram shall identify which wastestreams are subject to a categorical pretreatment standard. The industrial user shall also submit site plans, floor plans, mechanical and plumbing plans and details showing all sewers, sewer connections, floor drains, inspection manholes, and sampling chambers by size, location, and elevation; 4. Flow data. The industrial user shall submit information showing the estimated or actual measured average daily and maximum daily flow, in gpd, to the POTW from regulated process streams and other wastestreams, if necessary to allow the use of the combined wastestream formula set forth in 40 CFR 403.6(e); 5. Pollutant data. The industrial user shall submit: (i) the categorical pretreatment standard applicable to each regulated process; (ii) the results of sampling and analysis, as required by the Control Authority, that identify the nature and concentration (or mass) of regulated pollutants in the discharge from each regulated process; and (iii) the estimated peak instantaneous, daily maximum and long-term average discharge concentrations (and mass) based on sampling results. All samples taken shall be representative of daily operations and shall conform to the sampling collection and analytical procedures outlined in TMC § 12.08C.800 and TMC § 12.08C.810 and applicable program guidance. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e) for a categorical industrial user covered by a categorical pretreatment standard, this adjusted limit, along with supporting data, shall be submitted as part of the application; 6. Slug discharge control plan for significant industrial users as described in Section 12.08C.670 shall be submitted. The Control Authority may require industrial users regulated under TMC § 12.08C.330 to also submit a slug discharge control plan; 7. A statement that the industrial user acknowledges, understands, and agrees that the permittee facility will be subject at reasonable times to inspections and gathering of samples by the Control Authority to determine whether an industrial user is complying with the requirements of this chapter and any industrial wastewater discharge permit or other control mechanism issued thereunder; 8. Other information. Any other information the Control Authority deems necessary to prepare an industrial wastewater discharge permit; 9. Certification. The industrial user shall certify that the application was reviewed by an authorized representative of the industrial user in accordance with TMC § 12.08C.350; and 10. Incomplete information. Incomplete or inaccurate information will not be processed and will be returned to the industrial user for revision.
( Ord. 28761 Ex. C, 2021-05-25 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.
