For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.08D.250 — Low impact development stormwater rate reduction

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 12.08D.250

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/4777bf93-f360-4bed-9ea9-824286d83cb6

§ 12.08D.250: Low impact development stormwater rate reduction.

A. For parcels that provide additional low impact development BMPs and features beyond those required by the SWMM to mitigate the stormwater impacts of new development or redevelopment, or if low impact development is used to mitigate existing stormwater discharges that were not required to install low impact development BMPs at the time of new development or redevelopment (collectively or individually the “low impact improvement”), a rate reduction in the stormwater charge(s) applicable to those parcels may be allowed by the control authority in accordance with this section. All stormwater facilities and low impact improvements shall be designed in accordance with the applicable BMPs and requirements of the SWMM. All designs shall be reviewed and approved by the control authority prior to installation. In order to qualify for a rate reduction under this section, the owner shall submit the request for a rate reduction to the control authority prior to construction of the proposed low impact improvements, obtain all required permits for such work, and satisfy the following requirements: 1. Where the low impact improvement is built for mitigating the impacts of stormwater based on new development or redevelopment that has met the thresholds for Minimum Requirement #5 as defined in the most recent version of the SWMM, the owner of the parcel must have obtained the required permits and constructed the low impact improvement according to plans approved by the control authority, and the low impact improvement must include LID BMPs or features beyond those required by the minimum requirements of the SWMM in effect at the time of new development or redevelopment. 2. Where the low impact improvement is built to provide mitigation for existing stormwater flows and not as a requirement of any new development or redevelopment action that requires compliance with the SWMM, the low impact improvement must be approved by the control authority prior to construction, the applicant shall obtain proper permits if applicable, the design shall be reviewed and accepted by the control authority prior to construction, the applicant shall notify and allow the control authority to inspect the low impact improvement during and after construction, and the low impact improvement shall comply with the applicable BMPs and requirements of the SWMM or the approved plans. 3. The owner shall develop an O&M manual for the low impact improvement, be responsible for all costs of construction and proper operation and maintenance of such low impact improvement, and shall submit annual maintenance reports to the control authority. 4. The owner shall enter into a covenant and easement agreement with the City to assure proper operation and maintenance of the low impact improvement and allow the City access for inspection. The covenant and easement agreement shall be recorded with the Pierce County Auditor’s Office to the title of the property by the City and be in a form and content approved by the City Attorney. B. The control authority may inspect all low impact improvement and stormwater systems approved or sought to be approved under this section to ascertain that they have been installed in accordance with the approved documents and function properly. If at any time such low impact improvement or stormwater system fails to function as designed as determined by the control authority based on appropriate engineering standards, or if the owner fails to submit the annual maintenance reports, the control authority may reduce or revoke any rate reduction granted to reflect the effectiveness, if any, of such low impact improvement or stormwater system, or the control authority may revoke approval of the low impact improvement or stormwater system irrespective of its prior approval of either the low impact improvement or stormwater system or plans therefor. C. The stormwater rate reduction allowed under this section shall be as follows: 1. Use of low impact development BMPs as designated in the SWMM for partial mitigation of stormwater impacts from the site, defined as in this chapter, shall qualify the parcel to receive a one basic category of development rate reduction. 2. Use of low impact development BMPs as designated in the SWMM for full mitigation of stormwater impacts from the site, defined as mitigation of all surfaces and disturbed areas to the maximum amount practicable, shall receive a two basic categories of development rate reduction. 3. Notwithstanding any rate reduction authorized, permitted, or provided for in this section, no rate shall be reduced below the basic category of development for undeveloped land.

( Ord. 28761 Ex. D, 2021-05-25 )

Ask a question about Tacoma law

Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.