§ 13.04.190 — Dead-end/cul-de-sac public or private streets or ways, or permanent access easements
Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 13.04.190
Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/88464bc9-dc27-4327-afb4-886c5afc5355
§ 13.04.190: Dead-end/cul-de-sac public or private streets or ways, or permanent access easements.
Whenever feasible, a subdivision/short subdivision shall provide for the continuation of the multi-modal street and transportation system existing for pedestrians, bicycles, and vehicles by connecting to and extending abutting streets, sidewalks, and bicycle facilities. Dead-end/cul-de-sacs shall be allowed only when the Director or Hearing Examiner makes a finding that a public or private street way or permanent access easement cannot be aligned with and connected to the surrounding street system for pedestrian, bicycle and vehicular connectivity within the proposed subdivision/short subdivision due to factors such as topographic constraints, proximity to critical areas, and/or limitations by reason of property ownership. If the Director or Hearing Examiner makes a finding that such connectivity is not reasonable for the subject subdivision/short subdivision, dead-end/cul-de-sac public or private streets or ways, or permanent access easements shall not be longer than 500 feet. Whenever feasible, such dead-end/cul-de-sac shall nonetheless incorporate at a minimum a pedestrian connection to the adjacent transportation network. Any dead-end/cul-de-sac public or private street or way, or permanent access easement in excess of 150 feet in length shall incorporate a turn-around designed in accordance with applicable ordinances, manuals, design specifications, plans and guidelines in Section 13.04.120 as currently enacted or as may be hereafter amended, subject to approval by the City Engineer or designee.
( Ord. 25532 § 1, 1994-06-28 ; Ord. 27563 Ex. A, 2006-12-12 ; Ord. 28157 Ex. D, 2013-06-25 ; Ord. 28336 Ex. C, 2015-12-01 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.
