For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.12.580 — Traffic impact assessment

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 13.12.580

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/5e047f28-705e-47d3-b6ea-57c128f456d3

§ 13.12.580: Traffic impact assessment.

A. Purpose and applicability. 1. This section sets forth provisions for Traffic Impact Assessments for projects located within the following areas. Transportation impacts generally relate to the size of the development, the number of trips generated, and their effect on local and state streets and transportation facilities, transit operations, freight, and pedestrian and bicycling facilities and operations. The Department of Public Works will use the Traffic Impact Assessment to evaluate impacts and assist in identifying and establishing mitigation measures that will address safety, circulation, and capacity issues; capacity will be addressed in terms of Level of Service established in the City Comprehensive Plan and applicable sub-area plans. In those cases where the Department of Public Works identifies potential impacts to State Highways, they will consult with the Washington State Department of Transportation (“WSDOT”) in identifying mitigation measures. a. In the Downtown Tacoma Regional Growth Center and within the Tacoma Mall Neighborhood Regional Growth Center in areas where a Subarea Plan and a companion area-wide, non-project Environmental Impact Statement (“EIS”) have been completed. b. Urban residential districts. Sites within the Urban Residential (UR) districts, where the City has completed an area-wide, non-project Environmental Impact Statement to raise the residential threshold exemption to 40 units. 2. Exemptions. The Director of Public Works may be able to provide an exemption from this impact analysis if a proposal has no meaningful potential for significant and adverse transportation or traffic impacts. This may occur if the proposal has characteristics that may limit its net new vehicle traffic generation, or if only non-congested roadways and intersections are nearby, or if the net increase in traffic would not be significant compared to traffic from existing development. B. Definitions. For definitions, see Section 13.01. C. Traffic impact assessments. Transportation information is required to be prepared and submitted to the Public Works Department at the time of permit intake. If such information is not submitted, the Public Works Department may delay completing the application process until such time as the information is made available. After the application is accepted, permit review by Public Works Department staff may result in a request for additional information, which will be detailed in a correction notice. The type and extent of analysis required, which is outlined below, is based on the project size, as follows: 1. Within the Downtown Tacoma RGC. DOWNTOWN TACOMA RGC USE | “Level 1” Analysis | “Level 2” Analysis Residential | 100 to 199 dwelling units | Over 199 dwelling units Commercial | 30,000 – 59,999 sq. feet | Over 59,999 sq. feet If the residential unit count in a mixed-use development is less than the listed size ranges, but the non-residential use exceeds 20,000 square feet: | 20,000 – 59,999 sq. feet | Over 59,999 sq. feet 2. Within the Tacoma Mall Neighborhood RGC. TACOMA MALL NEIGHBORHOOD RGC USE | “Level 1” Analysis | “Level 2” Analysis Residential | Development that exceeds SEPA categorical exemptions as defined in TMC § 13.12.310 | Over 199 dwelling units Commercial | Over 59,999 sq. feet Mixed-use or industrial | Over 59,999 sq. feet Large block developments as defined in TMC § 13.05.010 Site Approval. | Optional: Analyze Site Approval connections as part of TIA | Required: Analyze Site Approval connections as part of TIA 3. In Urban Residential (UR) Districts. (a) Residential development from 21-40 units shall perform a Level 1 TIA as described in this section. Residential development above 40 dwellings as well as non-residential or mixed-use development shall submit an Environmental Checklist and otherwise follow the review process laid out in this Chapter. 4. Level 1: The following information must be provided by a qualified expert in the form of a transportation impacts study: a. Number of additional daily vehicle trips generated by the development as calculated using the ITE Trip Generation Manual, 8th Edition or successor edition. b. Number of additional “peak hour” vehicle trips generated by the development in the afternoon peak hours as calculated using the ITE Trip Generation Manual, 8th Edition or successor edition. c. The proposed ingress/egress routes, such as alleys and streets, on which vehicles will enter and leave the site’s parking garage or lot, and whether or not new curb-cuts will be proposed. d. An estimate of what proportion of the development’s traffic is likely to use which streets. e. Identify whether the nearest intersections are controlled by stop signs, traffic lights, or other form of traffic control. f. Describe existing pedestrian and bicycle facilities in the immediate site vicinity. g. Describe any pedestrian or bicycle facility improvements proposed, using the City’s Comprehensive Plan. h. Describe any impacts to state highways. i. Summarize relationships and potential for impacts to transit service, passenger rail, and non-motorized facilities in the site vicinity, and traffic safety, to the extent affected by the proposed development. j. Assessment of existing transportation network conditions, level of service, planned capital improvement projects, and potential effect on mode choice shift in the Subarea. k. Additional information determined by the Public Works Department to be necessary to identify the impacts of the proposal and to determine the appropriate mitigation actions pursuant to City policies and standards. 5. Level 2: The following information must be provided by a qualified expert in the form of a transportation impacts study: a. Identification of existing conditions, future baseline conditions, and number of additional daily vehicle trips generated by the development, specifically: (1) Information to describe the local streets and state highways, existing traffic volumes and turning movements, and traffic control devices on affected streets, state highways, and intersections; (2) Level of service information or alternate equivalent measures of traffic operation, delay, volume-to-capacity (“v/c”) ratio for affected intersections and/or streets/highway; (3) Traffic safety information – accident/collision history, latest 3 years; (4) Trip Generation: use the ITE Trip Generation Manual, 8th Edition (or successor), or alternate method to provide the following: (a) Calculate reductions from basic trip generation, for internal trips, pass-by trips, and mode choices (e.g., proportion likely to use modes other than single-occupant vehicle travel), at the applicant’s discretion. (b) Calculate any other reductions justifiable due to the nature of the development or site. (c) Summarize the resulting trip calculations for residential and commercial uses. b. Number of additional “peak hour” vehicle trips generated by the development in the afternoon peak hours, specifically: (1) Using comparable methods described under Subsection C.1. above, calculate peak hour vehicle trip generation; and (2) Providing the proposed ingress/egress routes, such as alleys and streets, on which automobiles will enter and leave the site’s parking garage or lot, and whether or not new curb-cuts will be proposed. c. The applicant’s estimate of “trip distribution” and assignment – what proportion of the development’s traffic is likely to use which streets. d. Identify the probable extent of traffic impacts on affected streets, highways, and intersections as follows: (1) Afternoon peak hour turning movement impacts on identified intersections, and interpretation of the potential magnitude of impact, including roadway level of service, intersection level of service, and/or other methods of evaluating impacts on street and intersection operations. (2) Site access operations, including information such as peak hour volumes, delay and/or level of service, and relationship to freight operations if relevant. e. Summarize relationships and potential for impacts to transit service, passenger rail, and non-motorized facilities in the site vicinity, and traffic safety, to the extent affected by the proposed development, including: (1) Description of proposed bicycle, pedestrian, transit, and freight facilities and operations as provided for in existing multimodal plans. This should include whether there are gaps in pedestrian connections from the site to the nearest transit stop or gaps in continuity of bicycle facilities in the site vicinity. (2) Describe whether the development would adversely affect sidewalks, bicycle lanes, transit facilities, and whether it would contribute traffic to a high accident location. (3) Describe any planned improvements or reconstruction of sidewalks or streets adjacent to the development site. f. Describe any impacts to state highways.

( Ord. 28222 Ex. C, 2014-05-13 ; Ord. 28511 Ex. B, 2018-05-15 ; Ord. 28725 Ex. A, 2020-12-08 ; Ord. 28986 Ex. D, 2024-11-19 )

Ask a question about Tacoma law

Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.