§ 13.13.060: Review procedures.
This section shall be construed as the local review process in accordance with 36 CFR 61.6(e)(1)(ii). A. Cultural resource review required. One or more of the following project factors may trigger a cultural resource review: 1. Properties with a known or high probability for presence of archaeological, cultural or historic sites, including: a. Properties with archaeological and historic resources listed or inventoried in the Washington Information System for Architectural and Archaeological Records Data (WISAARD). b. Construction or ground disturbing activities within 500 feet of a previously documented cultural resource. c. Properties with resources that are listed on any historic register, including the National Register of Historic Places, the Washington State Heritage Register, or the Tacoma Register of Historic Places. d. Areas identified as high probability for the presence of cultural resources based on information provided by Tribes with jurisdiction. e. The proposed development will involve soil disturbance and reliable information indicates the possible existence of an archaeological site on a parcel for which an application for a permit or approval for a ground disturbing action or activity has been submitted. 2. Activities subject to development review under Title 13 Land Use Regulatory Code and Title 19 Shoreline Master Program that include soil disturbance or excavation. 3. On parcel(s) where information provided by a Tribe, or by a Pierce County, federal, or state professional archaeologist demonstrates that the project location contains, or that the project will have probable adverse effect to, cultural resources, provided the information is submitted to the Department within thirty (30) days of notification or within the applicable State or Federal regulatory comment period. a. Locations of known archaeological sites are restricted and consultation with the Washington Department of Archaeology and Historic Preservation or a certified archaeologist will be required. b. The Applicant may submit notification to Tribal Historic Preservation Officer (THPO) with jurisdiction in advance of submitting the application to the Department. The advanced notice shall fulfill the notice requirement of TMC § 13.13.060B after 30 days of submittal to the THPO with jurisdiction if the notice sufficiently describes the project, the location, and the estimated depth of ground disturbance. The applicant shall provide the advance notice and any correspondence received to the Department. B. Tribal coordination. Tribal Historic Preservation Officers (THPO) with jurisdiction shall be provided the opportunity to review and comment on all applications subject to the provisions of this chapter. Comments from the Tribe shall be submitted within 30 days of notification or within the applicable SEPA comment period. 1. Advance notification to the Tribe may be provided by the applicant pursuant to § 13.13.060A; or 2. If no advance notice and correspondence is submitted with the permit application, the Department shall provide such notice. C. Risk assessment. For proposed activities with project factors that trigger a cultural resource review, the applicant’s Professional Archaeologist shall conduct a risk assessment: 1. The Risk Assessment shall include a review of cultural resources located within one mile from the project location. The distance shall be measured on a horizontal plane extending in all directions. 2. Whether the project site is within 500 feet of a site known to contain historic, cultural or archaeological resource(s) based upon historic registers and records. 3. Whether the project site is classified as a moderate to high risk for the presence of archaeological sites according to the Washington Information System of Architectural and Archaeological Records Data (WISAARD). 4. Following confirmation by the Department, within ten (10) years of a complete application, a property in which a previous Risk Assessment or Cultural Resource Survey was prepared by a Professional Archaeologist shall satisfy the Risk Assessment requirement. Cultural Resource Surveys older than ten (10) years may satisfy the Risk Assessment requirement if there is concurrence from affected Tribes. 5. The Department shall review the Risk Assessment and coordinate with affected Tribes. Affected Tribes shall be provided the opportunity to comment on the proposed action and Risk Assessment. Response from affected Tribes on potential adverse effects to cultural resources shall be submitted to the Department within thirty (30) days of notification. 6. A Risk Assessment may be waived if the applicant proposes conducting a Cultural Resource Survey instead. D. Determination of impact. 1. Following coordination with affected Tribes and DAHP, the Department shall determine if the project site is determined to have a potential to impact cultural or historic resources City shall require a cultural resource assessment to be prepared at the applicant’s expense by an individual meeting the applicable Secretary of the Interior’s Professional Qualification Standards for Archaeology and/or Architectural History. Potential impact is defined as: a. For archaeological sites, any project within 500 feet of a known archaeological site, or that is within a moderate to very high risk area according to WISAARD, a high probability area as defined in the Puyallup Tribe of Indians Comprehensive Plan, or for which THPO has indicated a potential impact after being duly notified as described in this chapter. b. For historic structures, any project that will demolish or substantially alter the exterior appearance of any structure listed on the National Register of Historic Places, the Washington State Heritage Register, or demolition of any structure for which a Determination of National Register Eligibility has been made by the State Historic Preservation Officer (SHPO). 2. If there are no potential impacts to archaeological, cultural or historic sites resulting from the project, a letter to the Historic Preservation Officer should be submitted with the development stating so, along with the resources consulted and any correspondence between the applicant and THPO with jurisdiction supporting a no-impact assessment. “No potential impact” includes projects that: a. Do not have any known archaeological or historically designated sites within 500 feet of the subject property; and b. Are not within any areas that are categorized as moderate to very high risk for archaeological sites according to WISAARD records or based on publicly available information from the Puyallup Tribe of Indians, or c. Have received confirmation from THPO indicating no concern, or for which 30 days has elapsed since the applicant has provided notification to THPO, where no concerns have been received. d. For permit applications that meet the criteria under TMC § 13.12.570.2.a.(3), the Department shall find that the project will have no effect on cultural or historic resources and may conclude the review, provided that an Unanticipated Discovery Plan is filed with the permit pursuant to the provisions elsewhere in this chapter. E. Cultural resources assessment requirements. Depending upon the nature of the potential impact, the Cultural Assessment may be required to address impacts to archaeological sites, historic structures, or both. 1. A cultural resources assessment for archaeology shall contain the following elements: a. A title page that includes: (1) Report title. (2) Principal Investigator, author, and organization. (3) Date of submission. b. Introduction. (1) Table of contents and list of figures and tables. (2) Project description that includes proposed project activities and elements, defines the location and size of the project, and a description of the vertical depth and horizontal area of disturbance. c. A summary of the environmental setting with an emphasis on current and historical vegetation, geomorphology, regional depositional history, watershed information and natural resources. (1) If this information has been provided in a previous report for the project, it does not need to be replicated. Reference to the original report or inclusion of an abbreviated version of the summary will suffice. d. Summary of the cultural history, ethnography, and history of the region with an emphasis on historical settlement and activity in the specific project area. (1) If this information has been provided in a previous report for the project, it does not need to be replicated. Reference to the original report or inclusion of an abbreviated version of the summary will suffice. e. Existing Data and Background Data based on current knowledge about archaeological properties, both in the project area and within a study area, based on the impacts of the project. The review should include existing archaeological inventories, historic records, and other archival repositories. f. Sufficient figures, images, and maps to convey the project’s relation to cultural resources. This shall include but not be limited to the United State Geological Survey 7.5 minute quadrangle map with the location of the project, and aerial image with the location of the project. g. Recommendations for future archaeological work, including survey, monitoring or data recovery, property management, and avoidance or mitigation options based on the nature of the undertaking, as described in TMC13.12.570.3. h. Full citation of all published sources of information including author, title, publisher, and date. F. A Cultural Resource Assessment addressing impacts to historic structures shall contain: 1. A title page that includes: a. Report title. b. Author and organization. c. Date of submission. 2. Introduction. a. Table of contents and list of figures and tables. b. Project description. c. An inventory of affected historic structures, including representative exterior photographs from present day as well as any historic period photographs available through historic archives or architectural databases, condition and integrity assessment, associated State Historic Property Inventory forms in WISAARD. For demolition of any structure over the age of 50 years, documentation of buildings must be conducted in accordance with Washington State Department of Archaeology and Historic Preservation guidelines for survey and site reporting. Such documentation must include an assessment of the historic significance or lack thereof, and the basis for this assessment. d. Maps and site plans as applicable clearly showing affected structures and their relation to the proposed development. 3. A previous archaeological survey or cultural assessment that meets the standards established within this section completed within 10 years of the date of application may be used in place of a new assessment. G. From the date of receipt of the Cultural Resource Assessment, the Department shall have thirty (30) days to review the document. The Department may accept the assessment as presented and concur with any conclusions or recommendations for additional work, request additional information or clarification, or find that, due to likely adverse effects upon historically or culturally significant properties resulting from the development project, additional assessment or mitigation is warranted that was not identified in the Cultural Assessment. H. Archaeological field survey. Following coordination with affected Tribes and DAHP, the Department shall determine if the project has the potential for adverse effects to cultural and archaeological resources. If there are potential adverse effect, the applicant shall be notified by the Department and the applicant shall provide an Archaeological Field Survey, prepared by a Professional Archaeologist. 1. The Archaeological Field Survey shall include the following elements: a. The elements of a Cultural Resources Assessment Report. b. The survey boundaries and how the boundary was determined. c. How survey methods were determined including number and spacing of pedestrian transects and subsurface examination procedures. d. Define survey goals and research questions based on both the environmental and cultural setting. e. Summarize the observations and results of the survey, quantify and describe the surface and subsurface survey. If subsurface testing is not utilized, justify the decision against such methodology. I. Archaeological monitoring. 1. Archaeological monitoring shall be required if: a. A Cultural Resource Survey or Risk Assessment determines there is a potential for adverse effect to cultural resources, or; b. The project has been discussed with affected Tribes and DAHP; and the Department determines that the Unanticipated Discovery Plan is insufficient. 2. Monitoring reports, when required, shall include the following elements: a. The elements of a Cultural Resources Assessment Report. b. Detail the date(s) of monitoring activities, noting the field and weather conditions. c. Summarize archaeological monitoring methodology and results of monitoring efforts. d. Quantify and describe the ground-disturbing activities monitored, including area and depth of ground disturbance, and types of equipment used. e. Describe any artifacts, features, and/or other archaeological objects identified during archaeological monitoring activities. f. The applicant may elect to include proactively these elements when completing the Cultural Assessment report submitted with the development permit. J. Avoidance, minimization, or mitigation. 1. For impacts to historic structures, additional submittals shall include: a. A description of how potential adverse effects to historic structures as a result of construction activities will be avoided, minimized, or mitigated. Subject to review and approval of the City’s Historic Preservation Officer, appropriate mitigation may include, but is not limited to: (1) Additional consultation with historic preservation officials at the federal, state, or local level or the Tacoma Landmarks Commission. (2) Additional documentation, including intensive level documentation of affected structures (as defined by the Washington State Department of Archaeology and Historic Preservation survey and reporting standards) (3) Avoidance of historic structures. (4) Retention of all or some of a historic structure into a new development; (5) Interpretive/educational measures, including onsite interpretation, context statements or documentation of thematically or historically related structures or historical narratives; (6) Off-site/on site preservation of another historic resource. 2. For impacts to archaeological and cultural resources, prior to requiring archaeological monitoring, the Department, affected Tribes, and DAHP may opt to resolve adverse effects through avoidance, minimization, or mitigation following the process outlined in 36 CFR 800.6 Resolution of adverse effects. K. Unanticipated Discovery Plan required. 1. An unanticipated discovery plan (UDP) is required as a permit condition for all development permits issued citywide where there is ground disturbance as a result of the permitted project, to be titled “Plan and Procedures for the Unanticipated Discovery of Cultural Resources and Human Skeletal Remains”. 2. The City will provide a UDP template to be used by permit applicants. Applicants may elect to provide their own UDP, so long as it meets the requirements set forth below. 3. The UDP shall be attached to the permit as a permit condition, and included with permit submittals if the applicant is providing their own UDP for the project (such as a UDP included with a cultural assessment report as an appendix), and contain the following sections: a. A general description of cultural resources that may be encountered during the project. b. Responsibilities of the project management, should a discovery occur. c. Steps for consultation with Tribal representatives, and City and State officials. d. A contact list including the State Historic Preservation Office/State Archaeologist, City Historic Preservation Officer, Tribal Historic Preservation Officer(s), Pierce County Medical Examiner and Tacoma Police Department Non-Emergency number. e. A section specifically outlining procedures in the event of discovery of human remains. f. Steps for further documentation. g. Steps for resuming development activities on the site. 4. The Unanticipated Discovery Plan must be posted onsite along with other permitting documents during the course of construction. L. If archaeological resources, archaeological indicators, or human remains are unearthed or exposed during a project’s construction, the following shall apply: 1. Conform to Chapter 25-48 WAC (Archaeological Excavation and Removal Permit). 2. If Human Remains as defined in RCW 68.50 are encountered, the applicant or landowner shall contact the appropriate law enforcement agency. 3. Failure to comply with RCW 27.53.060 is punishable under Chapter 9A.20 RCW. The procedures and penalties included in Indian Graves and Records (RCW 27.44), Human Remains (RCW 68.50), and Abandoned and Historic Cemeteries and Historic Graves (RCW 68.60) shall also apply. 4. The landowner shall be responsible for any required curation. The Department, at the discretion of the Director, may assist the landowner with curation by recommending permanent repositories or providing temporary storage. The permanent repository shall meet the standards of 36 CFR 79, for curation of materials other than human remains. Whenever feasible, the Department in coordination with affected Tribes shall encourage methodological approaches that do not require curation.
( Ord. 29076 Ex. A, 2025-12-02 )
Ask a question about Tacoma law
Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.