For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.09.050 — Building permit fees

Municipal Code, City of Tacoma, Washington (Tacoma Municipal Code current through legislation adopted 2026-09-30 (eCode360 publication TA6977, scraped 2026-11-18)) · Tacoma Municipal Code § 2.09.050

Corpus is an independent public-information project, not the official City of Tacoma website. Stable reference: corpuslaw.us/code/f9f570e9-0be7-48ec-8877-5c58ffa04b38

§ 2.09.050: Building permit fees.

A. Permit fees. Building permit fees shall be charged in accordance with the PDS Fee Schedule for the construction, alteration, relocation, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal and demolition of every building or structure or any appurtenances connected or attached to such buildings or structures, unless exempt by Chapter 2.02. Fees for each building permit shall be based upon the valuation of the work. 1. Valuation. The determination of value or valuation under any of the provisions of this Code shall be made by the Building Official. The valuation to be used in computing the permit and plan review fees shall be the total value of all construction work for which the permit is issued. Finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguishing systems, site work, and any other permanent work or permanent equipment shall be considered part of the valuation. The valuation of construction for new structures and additions shall be based upon floor area whenever possible, and shall be calculated from the most recent available “Building Valuation Data” (“BVD”) published by the International Code Council. The BVD shall be updated as directed by the Director of Planning and Development Services. Where fees are based on building floor area, such floor area shall include all floor area within the exterior surfaces of the exterior walls, basement areas, areas of exterior exit stairways and balconies, and those parts of other exterior balconies and walkways under roof overhangs. Where it is not possible to base the permit fee on floor area, the permit shall be based on valuation of work directly, subject to approval by the Building Official. The building permit fee for alterations, repairs, towers, retaining walls tanks (other than domestic fuel oil tanks), and similar construction shall be based on valuation. 2. Phased building permits. Fees for phasing building permits shall be in accordance with the PDS Fee Schedule. For the purposes of determining fees, the building permit can be separated into the following phases: a. Foundation/structural shell permit. Where the foundation and structural elements are being authorized by the permit and there are no building walls or spaces above the foundation approved for occupancy. b. Shell building. Where tenant spaces are not included in the permit and the spaces do not receive certificate of occupancy. A certificate of completion is issued for the completed shell space. c. Initial tenant improvement. Non-structural initial tenant alterations, which were not included in the building permit for the new building Work authorized at this rate will be limited to improvements to previously unoccupied space. Fees for all tenant alterations beyond the first permit will be computed on the basis of valuation. 3. Permits fees for residential combination permits. Residential combination permits will be issued for residential buildings up to 3 stories in height with 6 or fewer dwelling units and their accessory structures. The residential combined permit includes the following scopes of work for the types of projects listed below: a. | New structures. Building, plumbing, mechanical, and site development inclusive of the water service connection (from meter to house), stormwater connections, sanitary connections, grading, and erosion control. Right-of-way scope inclusive of utility service connections, driveways, and street trees. b. | Additions. Building, plumbing, and mechanical, and site development inclusive of grading and erosion control. c. | Remodels. Building, plumbing, and mechanical. Separate permits are required, as follows: a. | Other right-of-way construction scope not included in the combination permit as described above. b. | Electrical permits in accordance with the TPU Fixed Fee Schedule. c. | Water meter and system development charges in accordance with the TPU Fixed Fee Schedule. d. | Fire permits in accordance with TMC Chapter 3.09. Additional provisions for adjusting the valuations of residential buildings and their accessory structures are provided in the PDS Fee Schedule. B. Plan review fees. A plan review fee shall be charged for all building permits in accordance with the PDS Fee Schedule, and shall be based on a percentage of the permit fee. The fee for combination permits for new or additions to single-family/duplex buildings includes building, mechanical and plumbing plan reviews and site development plan reviews for the site development work included in those permit types. The fee for combination permits for remodels to single-family/duplex buildings includes the building, mechanical and plumbing plan reviews. Deferred submittals may be allowed upon approval of the Building Official. All deferred submittals shall be assessed an additional plan review fee based on an hourly rate established in the PDS Fee Schedule. The plan review fee shall be paid at the time of submittal. An application is not considered complete until the plan review fee has been paid as required. . Any discrepancies between the plan review fee calculated at the time of submittal and the actual plan review fee shall be corrected at the time the permit is issued. When, in the course of plan review, it is determined that the plans must be substantially revised and resubmitted, or if the plans are substantially revised by the proponent during or after the plan review, an additional plan review fee shall be assessed and charged. A new plan review fee shall be charged for each resubmittal. Exception: Where the aspects of the plans required to be resubmitted are minor in nature, or revisions instituted by the proponent are limited in scope, the Building Official may waive the additional plan review fee and instead assess the additional plan review fee based on an hourly rate established in the PDS Fee Schedule. Such additional plan review fee shall not exceed the original plan review fee for each resubmittal or additional review. C. Demolition permits. Demolition permit fees for buildings shall be charged in accordance with the PDS Fee Schedule. All demolition that is not the full building demolition or is for a non-building structure, including signs and billboards, shall be charged based on valuation of the work. In addition, demolition work that affects the exterior building footprint or other surrounding site features may require additional permits related to the earthwork, paving, and stormwater management and erosion control.

( Ord. 26557 § 3, 1999-12-14 ; Ord. 27009 § 5, 2002-11-19 ; Ord. 27305 § 4, 2004-12-14 ; Ord. 28502 Ex. A, 2018-04-10 ; Ord. 28701 Ex. A, 2020-11-17 ; Subst. Ord. 28986 Ex. F, 2024-11-19 )

Ask a question about Tacoma law

Corpus searches the Tacoma sections it holds and shows the ones that match, with their citations. Free, no sign-in.