For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11.63.042 — Project eligibility

Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 11.63.042

Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/8e1b2e91-2c22-4497-a380-06ec6383cb3a

§ 11.63.042: Project eligibility.

A proposed project must meet the following requirements for consideration for a property tax exemption: 1. Location. The project must be located within a residential target area, as designated in YMC § 11.63.040(C). 2. Tenant Displacement Policy. Existing dwelling units proposed for rehabilitation must have been unoccupied for a minimum of twelve months prior to submission of an application and must have one or more violations of the city’s minimum housing code, or the project shall not displace existing residential tenants of structures that are proposed for redevelopment prior to a demonstration that all relocation obligations set forth in and required by state and federal laws have been complied with. Applications for new construction cannot be submitted for vacant property upon which an occupied residential rental structure previously stood, unless a minimum of twelve months has elapsed from the time of most recent occupancy. 3. Size. The project must include at least four units of multiple-unit housing within a residential structure or as part of a mixed-use development. A minimum of four new units must be constructed or at least four additional multiple-units must be added to existing occupied multiple-unit housing. Existing multiple-unit housing that has been vacant for twelve months or more shall not be required to provide additional units so long as the project provides at least four units of new, converted, or rehabilitation multifamily housing. 4. Permanent Residential Housing. One hundred percent of the space designated for multiple-unit housing must be provided for permanent residential occupancy, as defined in RCW 84.14.010(13). 5. Proposed Completion Date. New construction multiple-unit housing and rehabilitation improvements must be scheduled to be completed within three years from the date of application approval. 6. Compliance with Guidelines and Standards. The project must be designed to comply with the city’s comprehensive plan, building, housing, and zoning codes, and any other applicable regulations in effect at the time the application is approved. Rehabilitation and conversion improvements must comply with the city’s minimum housing code. New construction must comply with the International Building Code (IBC). The project must also comply with any other standards and guidelines adopted by the city council for the residential target area in which the project will be developed.

( Ord. 2017-001 § 2 (part), 2017 ; Ord. 2017-010 § 2, 2017 )

Ask a question about Yakima law

Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.