§ 15.27.509 — General policies and standards
Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 15.27.509
Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/411de836-a757-46d4-a124-f1054d8c8b3a
§ 15.27.509: General policies and standards.
The following policies and standards shall apply to any development, construction, or use carried out within a designated fish and wildlife habitat conservation area: A. The ordinary high water mark of a stream or lake, and the edge of a wetland, shall be marked on the ground before any development, construction, or use is initiated; B. Existing vegetation and any vegetative species pertinent to the critical area identified on the project site within the stream corridor shall only be disturbed to the minimum extent possible; C. Nesting areas and other sensitive habitat identified within a stream corridor shall be disturbed to the minimum extent possible; D. Projects within the stream corridor shall be scheduled to occur at times and during seasons having the least impact to spawning, nesting, or other sensitive wildlife activities. Scheduling recommendations from the appropriate state and/or federal agency may be considered; E. Developments that obtain a stormwater permit approved by a local, state or federal agency and transportation projects using the Eastern Washington stormwater manual are exempt from: 1. Excavation, grading, cut/fills, compaction, and other modifications which contribute to erosion of soils shall be confined to the minimum necessary to complete the authorized work and avoid increased sediment load; 2. The removal of ground-cover vegetation, excavation, and grading shall be scheduled for periods when soils are the least vulnerable to erosion, compaction and movement unless suitable protective measures are used to prevent erosion; 3. Increases in impervious surface area, compaction of soil, changes in topography, and other modifications of land within a stream corridor shall provide on-site facilities for detention, control, and filtration if potential increases have been identified to occur; 4. The discharge point for controlled stormwater runoff shall be designed and constructed to avoid erosion; and 5. Matting or approved temporary ground cover shall be used to control erosion until natural vegetative ground cover is successfully established; F. Development, construction, and uses shall not directly or indirectly degrade surface water and groundwater through the introduction of nutrients, fecal coliform, toxins, and other biochemical substances; G. Prior to the approval of development, construction, or uses within a designated stream corridor, any existing source of biochemical or thermal degradation identified as originating on the project property shall be corrected; H. Facilities which use fertilizers, pesticides or herbicides shall use landscaping, low-risk products, application schedules, and other protective methodology to minimize the surface and subsurface transfer of biochemical materials into the stream corridor; I. Modifications to natural channel gradient, channel morphology, drainage patterns, and other stream features shall not permanently alter or obstruct the natural volume or flow of surface waters; J. Development, construction, or uses within the stream corridor shall not alter or divert flood flows, cause channel shift, erosion, and increase or accelerate the flooding of upstream or downstream flood hazard areas; K. Structures placed in close proximity to the outer edge of bends in stream channels shall be located to minimize the hazard from stream undercutting and stream bank erosion stemming from potential future stream migration; L. The Department of Ecology and adjacent communities shall be notified prior to any alteration or relocation of a watercourse and evidence of such notification shall be submitted to the Federal Insurance Administrator through appropriate notification means; M. Maintenance shall be provided for the altered or relocated portion of said watercourse so that the flood-carrying capacity is not diminished; N. Development, construction, or uses within the fish and wildlife habitat conservation area shall be mitigated using mitigation sequencing as outlined in YMC § 15.27.307; O. Development shall not obstruct, cut off, or isolate stream corridor features; P. Nothing in these regulations shall constitute authority of any person to trespass or in any way infringe upon the rights of private ownership; Q. If archaeological resources are uncovered during excavation, developers and property owners shall immediately stop work and notify the city of Yakima, the Washington State Office of Archaeology and Historic Preservation and any affected Indian nation. Archaeological sites are subject to RCW Chapters 27.44 and 27.53. Development or uses that may impact such sites shall comply with WAC Chapter 25-48, Archaeological Excavation and Removal Permit; R. Projects located within the floodway must meet the requirements of YMC § 15.27.411; and S. Any portion of the vegetative buffer temporarily damaged or disturbed as a result of construction activities (excluding approved permanent use areas) shall be repaired at the completion of construction using the reclamation found in YMC § 15.27.517.
( Ord. 2008-46 § 1 (part), 2008 ; Ord. 2016-029 § 1 (Exh. A) (part), 2016 ; Ord. 2017-017 § 2 (Exh. B) (part), 2017 ; Ord. 2021-021 § 2 (Exh. A), 2021 )
Ask a question about Yakima law
Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.
