§ 15.27.703 — Development review procedure for geologically hazardous areas
Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 15.27.703
Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/8828fef6-9121-4502-a002-c696ede8d4ad
§ 15.27.703: Development review procedure for geologically hazardous areas.
A. The administrative official shall make a determination of hazard to confirm whether the development or its associated facilities (building site, access roads, limits of grading/excavation/filling, retaining walls, septic drainfields, landscaping, etc.) are located: 1. Within a mapped geologically hazardous area; 2. Adjacent to or abutting a mapped geologically hazardous area and may result in or contribute to an increase in hazard, or pose a risk to life and property on or off the site; 3. Within a distance from the base of an adjacent landslide hazard area equal to the vertical relief of said hazard area; or 4. Within the potential run-out path of a mapped avalanche hazard. B. Developments that receive an affirmative determination of hazard by the administrative official under subsection A of this section must conduct a geologic hazard report as provided in YMC § 15.27.315(C), which may be part of a geotechnical report required below. 1. If the geologic hazard report determines that no hazard exists or that the project area lies outside the hazard, then no geologic hazard review is needed. 2. The administrative official is authorized to waive further geologic hazard review for oversteepened slopes on the basis that the hazards identified by the geologic hazard report will be adequately mitigated through conditions applied to a grading or construction permit. C. Developments that receive an affirmative determination of hazard, but do not meet the provisions of subsection (B)(1) or (B)(2) of this section, must: 1. Obtain a critical areas development authorization under Part Three of this chapter; 2. Submit a geotechnical report that is suitable for obtaining grading and construction permits that will be required for development: a. The geotechnical report shall incorporate a submitted assessment which includes the design of all facilities; b. A description and analysis of the risk associated with the measures proposed to mitigate the hazards; and c. Ensure the public safety, and protect property and other critical areas; and 3. Be consistent with YMC § 15.27.704.
( Ord. 2008-46 § 1 (part), 2008 ; Ord. 2016-029 § 1 (Exh. A) (part), 2016 ; Ord. 2017-017 § 2 (Exh. B) (part), 2017 ; Ord. 2021-021 § 2 (Exh. A), 2021 )
Ask a question about Yakima law
Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.