§ 7.65.140: Reporting requirements for industrial dischargers.

A. Within either one hundred eighty days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing significant industrial dischargers subject to such categorical pretreatment standards, and currently discharging to or scheduled to discharge to the POTW, shall be required to submit to the wastewater manager a report which contains the information listed in this section. At least one hundred twenty days prior to commencement of their discharge, new sources, and sources that become significant industrial dischargers subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the wastewater manager a report which contains the information listed in this section. A new source shall also be required to report the method of pretreatment it intends to use to meet applicable pretreatment standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants discharged. The industrial discharger shall submit the information required by this section including: 1. The name and address of the facility including the name of the operator and owners. 2. A list of any environmental control permits held by or for the facility. 3. A brief description of the nature, average rate of production and standard industrial classifications of the operation(s) carried out by such industrial discharger. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes. 4. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 CFR 403.6(e). 5. A measurement of pollutants. a. Identification of the categorical pretreatment standards applicable to each regulated process. b. Submission of the results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by the city) of regulated pollutants in the discharge from each regulated process. The industrial discharger shall take a minimum of one representative sample to compile the data necessary to comply with the requirements of this subsection. Instantaneous, daily maximum and long-term average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection H of this section. In cases where the pretreatment standard requires compliance with best management practices or pollution prevention alternatives, the industrial discharger shall submit documentation as required by that standard to document compliance with the standard. c. Sampling must be performed in accordance with procedures set out in subsection I of this section. d. The city may allow the submission of a baseline report, which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. 6. A statement from the industrial discharger’s authorized representative and certified by a professional engineer registered in the state of Washington, indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. 7. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the industrial discharger will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. Where the industrial discharger’s categorical pretreatment standard has been modified by a removal allowance (under 40 CFR 403.7), the combined waste stream formula (under 40 CFR 403.6(e)), and/or a fundamentally different factors variance (under 40 CFR 403.13) at the time the industrial discharger submits the report required under subsection A of this section, the information required by subsections (A)(6) and (7) of this section shall pertain to the modified limits. If the categorical pretreatment standard is modified by a removal allowance, the combined waste stream formula, and/or a fundamentally different factors variance after the industrial discharger submits the report required under subsection A of this section, any necessary amendments to the information requested by subsections (A)(6) and (7) of this section shall be submitted by the industrial discharger to the wastewater manager within sixty days after the modified limit is approved. The following conditions shall apply to the schedule required by this subsection: a. The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the installation and operation of additional pretreatment facilities required for the discharger to meet the applicable pretreatment standards (such events include hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing installation, beginning and conducting routine operation). No progress increment referred to above shall exceed nine months. b. The industrial discharger shall submit a progress report to the wastewater manager no later than fourteen days following each date in the schedule and the final date of compliance including, as a minimum, whether or not the discharger complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the industrial discharger to return to the established schedule. In no event shall more than nine months elapse between such progress reports to the wastewater manager. 8. All baseline monitoring reports must be signed and certified in accordance with subsection K of this section. B. Within ninety days following the date for final compliance with applicable categorical pretreatment standards (deadline date for categorical dischargers published in the appropriate categorical pretreatment standards, compliance date for noncategorical dischargers established by the city) or in the case of a new source (new discharger) within thirty days of commencement of the introduction of wastewater into the POTW, any industrial discharger subject to such pretreatment standards and requirements shall submit to the wastewater manager a report containing the information described in subsections (A)(4) through (6) of this section. For industrial dischargers which may be subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the industrial discharger’s long-term wastewater discharge rate. For all other industrial dischargers subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the industrial discharger’s actual wastewater discharge rate during the appropriate corresponding sampling period. All compliance reports must be signed and certified in accordance with subsection K of this section. C. Any significant industrial discharger subject to a pretreatment standard shall, at a frequency determined by the wastewater manager in its discharge permit, but in no case less than twice per year, submit a report indicating the nature and concentration of pollutants in the discharge which are limited by such pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. All compliance reports must be signed and certified in accordance with subsection K of this section. 1. The report shall include a record of the concentrations (and mass if specified by the city) of the limited pollutants that were measured and a record of all flow measurements (average and maximum) taken at the designated sampling locations, and shall also include any additional information required by this chapter or regulations promulgated thereunder. Production data shall be reported if required by the city. Both daily maximum and average concentration (or mass, where required) shall be reported. In cases where the pretreatment standard requires compliance with best management practices or pollution prevention alternatives, the industrial discharger shall submit documentation as required by that standard to document compliance with the standard. If a discharger sampled more frequently than required by the city, it must submit all results of sampling and analysis of the discharge during the reporting period. 2. Any industrial discharger subject to equivalent mass or concentration limits established by the city in accordance with procedures provided in 40 CFR 403.6(c) shall submit as part of its report a reasonable measure of the discharger’s long-term production rate. 3. If the city calculated limits to factor out dilution flows or nonregulated flows, the industrial discharger shall be responsible for providing flows from the regulated process flows, dilution flows and nonregulated flows. 4. The report shall indicate the time, date and place of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of the normal work cycles and expected pollutant discharges to the POTW. 5. Flows shall be reported on the basis of actual measurement; provided, however, that the city may accept reports of average and maximum flows estimated by verifiable techniques if the city determines that an actual measurement is not feasible. 6. Sampling shall be representative of the industrial discharger’s actual discharge and collected in accordance with subsection I of this section. Wastewater monitoring and flow management facilities shall be properly operated, kept clean and maintained in good working order at all times. The failure of an industrial discharger to keep its monitoring facility in good working order shall not be grounds for the industrial discharger to claim that sample results are unrepresentative of its discharge. 7. Where the industrial discharger conducts self-monitoring, the number and frequency of monitoring shall be prescribed by the city in their discharge permit. The samples shall be processed at a laboratory accredited by the state. Alternately, at the request of the industrial permittee, the city may collect and analyze the samples as part of the required sampling and analysis under its NPDES permit and YMC § 7.65.160(E). All costs associated with such testing and analysis shall be the responsibility of the industrial discharger. D. Any industrial discharger subject to this chapter shall report to the wastewater division, in person or by phone, ninety days prior to any changes in its operations or processes which significantly affect its wastewater constituents or characteristics, or storage of chemicals, and which take place after the last report, permit application or environmental survey. These changes include, but are not limited to, flow, BOD, or TSS increases of twenty percent or greater, the commencement of discharge of any prohibited or limited substance under YMC § 7.65.060(B), and the addition of any process covered by national categorical pretreatment standards. Formal written notification shall also be made to the wastewater division at least ten days prior to such change. E. Any discharger operating under equivalent mass or concentration limits shall notify the wastewater manager within two business days after the discharger has a reasonable basis to know that the production level will significantly change within the next calendar month. Any discharger not notifying the wastewater manager of such an anticipated change shall be required to comply with the existing limits. F. All significant industrial dischargers not subject to categorical pretreatment standards and, as deemed necessary by the wastewater manager, any minor industrial dischargers shall provide to the wastewater manager the same reports as set forth in subsection A of this section. G. If sampling performed by an industrial discharger indicates a violation, the industrial discharger must notify the wastewater manager within twenty-four hours of becoming aware of the violation. The industrial discharger shall also repeat the sampling and analysis and submit the results of the repeat analysis to the wastewater manager within thirty days after becoming aware of the violation. Where the city has performed the sampling and analysis in lieu of the industrial discharger, the city must perform the repeat sampling and analysis within thirty days after becoming aware of the violation unless it notifies the industrial discharger of the violation and requires that discharger to perform the repeat sampling and analysis. The industrial discharger is not required to resample if the POTW performs monitoring at the industrial discharger’s at least once a month, or if the POTW performs sampling between the industrial discharger’s initial sampling and when the industrial discharger receives the results of this sampling. H. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report, shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and WAC 173-216-125. If 40 CFR Part 136 or WAC 173-216-125 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by the EPA. I. Except as indicated below, the industrial discharger must collect wastewater samples using twenty-four-hour flow proportional composite collection techniques. In the event twenty-four-hour flow proportional composite sampling is infeasible, the wastewater manager may authorize the use of time proportional composite sampling or a minimum of four grab samples where the industrial discharger demonstrates that this will provide a representative sample of the actual effluent being discharged to the POTW and the wastewater manager shall document the decision to allow alternative sampling in the discharger’s facility file. In addition, grab samples may be required to show compliance with instantaneous discharge limits. Samples to be analyzed for fats, oil and grease (FOG), temperature, pH, cyanide, phenols, toxicity, sulfides, metals and volatile organic compounds shall be obtained using grab collection techniques. 1. Samples should be taken immediately down-stream from pretreatment facilities if such exist or immediately downstream from the regulated or manufacturing process if no pretreatment exists or as determined by the city. For dischargers subject to categorical pretreatment standards, if other wastewaters are mixed with the regulated wastewater prior to pretreatment the discharger should measure the flows and concentrations necessary to allow use of the combined waste stream formula of 40 CFR 403.6(e) in order to evaluate compliance with the applicable pretreatment standards. 2. All sample results shall indicate the time, date and place of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges from the industrial discharger. If a discharger subject to the reporting requirements in and of this section monitors any pollutant more frequently than required by the city, it must submit the results of this extra sampling and analysis of the discharge as part of its self-monitoring report. J. The wastewater manager may use a wastewater grab sample(s) to determine noncompliance with applicable pretreatment standards. K. Any reports required by this chapter and submitted by the industrial discharger shall be signed by an authorized representative of the discharger. Any person signing the report shall make the following certification: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. L. Written reports shall be deemed to have been submitted on the date postmarked. For reports, which are not mailed, postage prepaid, into a mail facility serviced by the U.S. Postal Service, the date of receipt of the report shall govern. The wastewater manager shall develop and implement procedures to receive and analyze reports and other notices submitted by industrial dischargers.

( Ord. 2003-74 § 1 (part), 2003 ; Ord. 2007-26 § 1 (part), 2007 )