§ 7.65.195 — Wastewater discharge permit contents, transfer and modification
Municipal Code, City of Yakima, Washington (includes legislation through 10-06-2026) · Yakima Municipal Code § 7.65.195
Corpus is an independent public-information project, not the official City of Yakima website. Stable reference: corpuslaw.us/code/5bc2fcde-b247-4120-9036-762100e3c53b
§ 7.65.195: Wastewater discharge permit contents, transfer and modification.
A. Permit Terms and Conditions. 1. Any discharge permit issued by the city shall include such conditions as are reasonably deemed necessary by the wastewater manager to prevent pass through or interference, protect the quality of the water body receiving the treatment plant’s effluent, protect worker health and safety, facilitate biosolids management and beneficial reuse, and protect against damage to the POTW, including without limitation: a. A statement that indicates the duration of the permit, which in no event shall exceed five years; b. A statement that the wastewater discharge permit is nontransferable without compliance with subsection (B) of this section; c. All known available and reasonable methods of prevention, control and treatment; d. Applicable pretreatment requirements and local discharge limits, including best management practices, and prohibited discharge requirements pursuant to this chapter; e. Self-monitoring, sampling, reporting, notification, technical report submittal, compliance schedules, and record-keeping requirements. These requirements shall identify pollutants to be monitored, sampling locations, sampling frequency, and sample type based on federal, state, and city law; f. Requirements pursuant to other laws including the state’s Hazardous Waste Disposal Act, Chapter 70.105 RCW, the Solid Waste Management Act, Chapter 70.95 RCW, the federal Resource Conservation and Recovery Act of 1976, Public Law 95-190, or any other applicable local ordinances or state or federal statutes, to the extent that they pertain to the prevention or control of waste discharges into the waters of the state; g. Any conditions necessary to meet applicable water quality standards for surface waters; h. Requirements necessary to avoid conflict with a plan approved pursuant to Section 208(b) of the Act; i. Any conditions necessary to prevent and control pollutant discharges from plant site runoff, spillage or leaks, sludge or waste disposal, or raw material disposal; j. A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements or any applicable compliance schedule; and k. Requirements to control slug discharges, if determined by the wastewater manager to be necessary. 2. As a condition of their permit and as required in YMC § 7.65.160, the permittee shall allow the wastewater manager, upon the presentation of credentials and other documents as may be required by law, which may include a judicial inspection warrant, to: a. Enter upon the permittee’s premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the permit; b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of the permit; c. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under the permit; d. Have the right to sample or monitor waste discharges for the purposes of assuring permit compliance at any location; and e. Inspect any production, manufacturing, fabricating or storage area where pollutants, regulated under the permit, could originate, be stored, or be discharged to the POTW. 3. The permittee shall, at all times, be responsible for the proper operation and maintenance of any facilities or systems of control installed by the permittee to achieve compliance with the conditions of the permit. Where design criteria have been established, the permittee shall not permit flow or waste loadings to exceed approved designed criteria or approved additions thereto. 4. A new application or supplement to the previous application shall be submitted along with required engineering plans and reports, whenever a new or increased discharge or change in the nature of the discharge is anticipated that is not specifically authorized by the current permit. Such application shall be submitted at least sixty days prior to proposed changes. 5. In the event the permittee is unable to comply with any of the permit terms and conditions due to any cause, the permittee shall: a. Immediately take action to stop, contain, and clean up unauthorized discharges or otherwise stop the violation, and correct the problem; b. Immediately notify the wastewater division of the failure to comply; and c. Submit a detailed written report to the wastewater division within thirty days, unless requested earlier by the wastewater division, describing the nature of the violation, corrective action taken to prevent a recurrence, and any other pertinent information. B. Transfer of a Permit. 1. A permit is automatically transferred to a new owner or operator of the facility if: a. A written agreement, signed by the new owner, between the old and new owner or operator, containing a specific date for transfer of permit responsibility, coverage and liability, is submitted to the wastewater division at least sixty days prior to the specified transfer date; and b. The wastewater division does not notify the permittee of the need to modify or revoke and reissue the permit. 2. Unless a permit is automatically transferred according to subsection (B)(1) of this section, a permit may be transferred only if the permit is modified or revoked and reissued to incorporate such other requirements as determined necessary by the wastewater division. C. Modification, Suspension, Revocation and Voiding of Permits. 1. The wastewater division may modify a permit, including the schedule of compliance or other conditions, if it determines good and valid cause exists, which includes, but is not limited to, promulgation or revisions of categorical standards, the issuance of a special order, a change in the POTW, and alterations or additions to the discharger’s discharges. 2. Any permit issued under this chapter may be suspended or revoked, in whole or in part, by the wastewater division for, but not limited to, the following reasons: a. Violation of any permit term or condition; b. Obtaining a permit by misrepresentation or failure to fully disclose all relevant facts; c. A material change in quantity or type of waste disposal; d. Nonpayment of fees associated with the permit; e. Failure to notify the city of significant changes to the discharge prior to implementing that change; f. Falsifying reports; g. Tampering with monitoring equipment; h. Intentionally providing nonrepresentative samples; i. Refusing to allow the city access to the facility premises and records; or j. Failure to meet a compliance schedule. 3. Wastewater discharge permits shall be voidable upon cessation of operations. All wastewater discharge permits issued to a particular discharger are void upon the issuance of a new discharge permit to that user.
( Ord. 2003-74 § 1 (part), 2003 ; Ord. 2007-26 § 1 (part), 2007 )
Ask a question about Yakima law
Corpus searches the Yakima sections it holds and shows the ones that match, with their citations. Free, no sign-in.
