Sec. 16-39. - Performance standards for construction sites required to be permitted.

(a) Responsible party. The responsible party shall implement an erosion and sediment control plan, developed in accordance with Section 16-41 that incorporates the requirements of this section. (b) Erosion and sediment control plan. A written site-specific erosion and sediment control plan shall be developed in accordance with Section 16-41 and implemented for each construction site. (1) Preventive measures. The erosion and sediment control plan shall also incorporate all of the following: a. Maintenance of existing vegetation, especially adjacent to surface waters whenever possible. b. Minimization of soil compaction and preservation of topsoil. c. Minimization of land disturbing construction activity on slopes of 20 percent or more. d. Development of spill prevention and response procedures. (2) Sediment control practices. Where appropriate, the plan shall include the sediment control practices that will be used (for each site where land disturbing construction activity will occur) to prevent or reduce the following to the maximum extent practicable: a. Prevent tracking of sediment from the construction site onto roads and other paved surfaces. Each site shall have graveled roads, access drives, and parking areas of sufficient width and length to prevent sediment from being tracked onto public or private roadways. Any sediment reaching a public or private road shall be removed, at a minimum, before the end of each workday, and more frequently if tracking is occurring. b. Prevent the discharge of sediment as part of site de-watering. Water pumped from the site shall be treated by temporary sedimentation basins or other appropriate controls for the highest dewatering pumping rate. Dewatering must also comply with WDNR rules. Water may not be discharged in a manner that causes erosion of the site or receiving channels. c. Protect the separate storm drain inlet structure from receiving sediment. d. The discharge of sediment from disturbed areas into adjacent waters of the state. e. The discharge of sediment from drainage ways that flow off the site. f. The discharge of sediment eroding from soil stockpiles existing for more than seven days. g. The discharge of sediment from erosive flows at outlets and in downstream channels. h. The transport by runoff into waters of the state of untreated wash water from vehicle and wheel washing. i. The use, storage and disposal of building materials, debris, garbage, chemicals, cement, concrete truck washout, litter, sanitary waste, toxic materials, hazardous materials, cleaning wastes, and other compounds and materials used on the construction site shall be managed during the construction period, to prevent their entrance into storm sewers and waters of the state. However, projects that require the placement of these materials in waters of the state, such as constructing bridge footings or BMP installations, are not prohibited by this paragraph provided they have appropriate permits. (c) Erosion and sediment control requirements. The erosion and sediment control plan shall meet the following minimum requirements to the maximum extent practicable: (1) BMPs shall be designed, installed, inspected and maintained to control total suspended solids carried in runoff from the construction site as follows: a. For permitted construction sites of land disturbing construction activity, reduce the total suspended solids load by 80 percent, on an average annual basis, as compared with no sediment or erosion controls until the construction site has undergone final stabilization. No person shall be required to exceed an 80 percent sediment reduction to meet the requirements of this subsection. Erosion and sediment control BMPs may be used alone or in combination to meet the requirements of this subsection. Credit toward meeting the sediment reduction shall be given for limiting the duration or area, or both, of land disturbing construction activity, or other appropriate mechanism. b. Soil loss prediction tools that estimate the sediment load leaving the construction site under varying land and management conditions, or methodology identified in of Wis. Admin. Code Ch. NR 151, Subch. V (Wis. Admin. Code §§ NR 151.30—151.32), shall be used to calculate sediment reduction. The soil loss prediction tool must show that BMPs that, by design, discharge no more than five tons per acre per year, or to the maximum extent practicable, of the sediment load carried in runoff from initial grading to final stabilization. c. No person shall be required to employ more BMPs than are needed to meet a performance standard in order to comply with maximum extent practicable. Erosion and sediment control BMPs may be combined to meet the requirements of this subsection. Credit may be given toward meeting the sediment performance standard of this subsection for limiting the duration or area, or both, of land disturbing construction activity, or for other appropriate mechanisms. (2) Notwithstanding subsection (c)(1) of this section, if BMPs cannot be designed and implemented to reduce the sediment load by 80 percent on an average annual basis, the plan shall include a written and site-specific explanation as to why the 80 percent reduction goal is not attainable and the sediment load shall be reduced to the maximum extent practicable. (3) Site erosion control. The following criteria apply only to land development or land disturbing construction activities that result in runoff leaving the site: a. Channelized runoff from adjacent areas passing through the site shall be diverted around disturbed areas, if practical. Otherwise, the channel shall be protected as described below in subsection (c)(3)c.2 or 3 of this section. Sheet flow runoff from adjacent areas greater than 10,000 square feet in area shall also be diverted around disturbed areas, unless shown to have resultant runoff velocities of less than 0.5 feet per second across the disturbed area for the set of one-year design storms. Diverted runoff shall be conveyed in a manner that will not erode the conveyance and receiving channels. b. All activities on the site shall be conducted in a logical sequence to minimize the area of bare soil exposed at any one time. c. Runoff from the entire disturbed area on the site shall be controlled by meeting either subsections (c)(3)c.1 and 2 or (c)(3)c.1 and 3 of this section and WDNR Technical Standards, whichever is more restrictive. 1. All disturbed ground left inactive for 15 or more days shall be stabilized by mulching, temporary or permanent seeding, sodding, covering with tarps, or equivalent control measures. Seeding and sodding may only be used from May 1 to September 15 of any year. If temporary seeding is used, a permanent cover shall also be required as part of the final site stabilization. 2. For sites with ten or more acres disturbed at one time, or if a channel originates in the disturbed area, one or more sedimentation basins shall be constructed. Sedimentation basins shall be designed, constructed and maintained per WDNR Technical Standards. At a minimum, each sedimentation basin shall have a surface area of at least one percent of the area draining to the basin and at least three feet of depth. Sediment shall be removed to maintain a depth of three feet. The basin shall be designed to trap sediment greater than 15 microns in size, based on the set of one-year design storms having duration from 0.5 to 24 hours. The basin discharge rate shall also be sufficiently low as to not cause erosion along the discharge channel or the receiving water. 3. For sites with less than ten acres disturbed at one time, filter fences, straw bales, or equivalent control measures shall be placed along all sideslope and downslope sides of the site. If a channel or area of concentrated runoff passes through the site, filter fences shall be placed along the channel edges to reduce sediment reaching the channel. 4. Runoff from sites or slopes of 12 percent or more may require additional or different control methods which are not listed in this subsection (c)(3)c. (4) Any soil or dirt storage piles containing more than ten cubic yards of material should not be located with a down slope drainage length of less than 25 feet to a roadway or drainage channel. If remaining for 15 days or more, the piles shall be stabilized by mulching, vegetative cover, tarps, or other means. Erosion from piles which will be in existence for less than 15 days shall be controlled by placing straw bales or filter fence barriers around the pile. In-street utility repair or construction, soil or dirt storage piles located closer than 25 feet of a roadway or drainage channel must be covered with tarps or suitable alternative control when exposed for more than 15 days, and the storm drain inlets must be protected with straw bale or other appropriate filtering barriers. (d) Location. The BMPs used to comply with this section shall be located prior to runoff entering waters of the state or regional stormwater treatment facilities. Regional stormwater treatment facilities are appropriate for control of post-construction pollutants, they should not be used for construction site sediment removal. (e) Implementation. The BMPs used to comply with this section shall be implemented as follows: (1) Erosion and sediment control practices shall be constructed or installed before land disturbing construction activities begin in accordance with the erosion and sediment control plan developed in Section 16-41. (2) Erosion and sediment control practices shall be inspected and maintained until final stabilization. (3) Final stabilization activity shall commence when land disturbing activities cease and final grade has been reached on any portion of the site. (4) Temporary stabilization activity shall commence when land disturbing activities have temporarily ceased and will not resume for a period exceeding 14 calendar days. (5) BMPs that are no longer necessary for erosion and sediment control shall be removed by the responsible party. (f) Alternate requirements. The Administering Authority may establish requirements more stringent than those set forth in this section if the Administering Authority determines that an added level of protection is needed for sensitive resources.

(Code 1984, § 34.09)