Sec. 36-38. - Grading plan.
In order to ensure positive drainage of subdivided lands and to prevent health, aesthetic, or other problems related to ponding (i.e., pooling, flooding) outside of approved stormwater facility areas, a detailed grading plan shall be submitted to the Planning Department as a required part of the preliminary and final plat or CSM submissions. In the preparation of the grading plan, the designer must consider the existing topography of the development and its relationship with adjacent properties. Grading plans may be progressively developed over the course of the plat or CSM review process as specified below, and must conform to the following standards: (1) Conceptual grading plan. A conceptual grading plan shall be developed and submitted in conjunction with the preliminary plat or CSM (if required) and shall demonstrate: a. The basic anticipated drainage pattern that would be expected to provide positive drainage throughout the development. b. How surface drainage would reach storm sewers within the road right-of-way. c. Whether back yard drains or sewers would be required. d. Where stormwater facilities could be located and how stormwater will reach those facilities. (2) Pre-final grading plan. A pre-final grading plan shall be developed and submitted in conjunction with the initial submission of the final plat. It may also be submitted at any time before submission of the final plat at the option of the subdivider. The pre-final grading plan is considered a draft of the final grading plan and shall include the following minimum information: a. A drainage plan for each block or group of lots within the subdivision as well as the surrounding areas within a reasonable distance beyond the subdivision limits. The drainage plan shall ensure that water will flow from any point within a lot to a street right-of-way, a natural or constructed drainage right-of-way or easement, or a storm sewer system. b. Existing and proposed contours at vertical intervals of not more than two feet. Elevations shall be marked on such contours based on City datum. c. Cut and fill areas shall be identified. d. Final grade elevations to be maintained along all side and rear lot lines. e. The first floor elevation for the primary structure on each lot shall be established such that the grading of a lot does not conflict with the overall grading or drainage plan for the block or the subdivision. First floor elevations can be modified after the approval of the final grading plan, provided sound engineering documentation is provided to the City Departments of Public Works and Planning and the Inspection Division. (3) Final grading plan. The final grading plan shall be developed and submitted in conjunction with the final plat. Final grading plans shall include, at a minimum, the same information required of pre-final grading plans, and shall also meet the following additional requirements: a. All final grading plans shall be designed and prepared by a qualified professional and shall be stamped and signed by a registered engineer in the State of Wisconsin. b. Minor modifications to approved final grading plans can be made, should field conditions warrant, upon written request to and approval by the Director of Public Works or their designee. (4) All grading plans (conceptual, pre-final, and final) shall be referenced to City datum. (5) Minimum and maximum slopes. a. Yard drainage shall be one percent minimum to public drainage facilities. b. All public drainage rear yard swales and roadside ditches shall have a minimum of a one percent swale gradient. c. When practicable, all rear and side yard swales shall be centered on property lines. d. The maximum side slope of areas that may collect water is 5:1. e. The first 20 feet back from a residential house shall be graded to a maximum of five percent. The remaining rear yard shall have a maximum of eight percent, except when the lot includes approaches to approved detention/retention facilities. Only in extreme cases, with approval by the City Engineer, the last ten feet may be graded to a 4:1 slope. f. All side yard slopes shall be between one percent and 25 percent (4:1). g. The slope between the front edge of sidewalk and back of curb (terrace area) shall be a minimum two percent, maximum four percent (i.e., one-quarter inch to one-half inch per foot). h. Modifications to the slope requirements can be made upon written request to and approval by the Director of Public Works or their designee. (6) Drainage swales shall be provided along rear and side yards of proposed buildings or parcels. a. The minimum distance between a rear yard swale and a residential house is 25 feet (measured from the top of slope/break point). b. The distance between a rear or side yard swale and an accessory building shall be five feet minimum (measured from the top of slope/break point). (7) Grading operations must be coordinated with all private and public utility locations and is the responsibility of the developer. (8) All utility crossings, including culverts, shall have a minimum 30 inches cover from the top of the utility to the finished grade. Modifications to the minimum cover requirement can be made upon written request to and approval by the Director of Public Works or their designee. (9) The difference between the top of foundation elevation of a structure and the adjacent outside finished grade must be a minimum of six feet for residential areas. (10) Other design requirements may be applicable, such as retaining walls or terracing of the property, depending on the land plan and site topography. The City Engineer must approve each special design feature before its incorporation into the plans. (11) If berms are included in the grading plan of a subdivision, they must meet the following standards: a. Maximum height of four feet (unless otherwise approved by the City Engineer). b. Maximum slope of 3:1. c. Construction in a way that does not impede or restrict surface water drainage. d. Possible requirement of gaps or culverts in the berms to accommodate drainage. (12) All grading plans shall coordinate with surrounding elevations by meeting the following requirements: a. Match existing grades at the property lines with a slope not to exceed 5:1, unless an approved grading plan or a proposed established street grade exists for the future development of adjacent properties indicates different elevations. b. Match all proposed and established street grade plans on file with the City Engineer. (13) All grading plans shall accommodate the drainage patterns of adjacent properties unless an alternative approach is approved by the City Engineer. (14) All rights-of-way shall allow for emergency overflow in the case of large storm events or plugged inlet or storm systems.
(Code 1984, § 14.208)
Ask a question about Green Bay law
Corpus searches the Green Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.