For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 44-1104 — Districts defined

Municipal Code, City of Green Bay, Wisconsin (Supp. 10: codified through Ordinance No. 11-26, enacted July 21, 2026 (online updated October 12, 2026)) · Green Bay Municipal Code § 44-1104

Corpus is an independent public-information project, not the official City of Green Bay website. Stable reference: corpuslaw.us/code/324585c5-d5c8-40ab-a6c0-6825ce5cce7e

Sec. 44-1104. - Districts defined.

The flood hazard areas regulated by this article are divided into districts as follows. (1) The Floodway District (FW) consists of the channel of a river or stream and those portions of the floodplain adjoining the channel required to carry the regional floodwaters, within AE Zones as shown on the FIRM, or within A Zones shown on the FIRM when determined according to Section 44-1224. (2) The Floodfringe District (FF) consists of that portion of a riverine special flood hazard area outside the floodway within AE Zones on the FIRM, or, when floodway limits have been determined according to Section 44-1224, within A Zones shown on the FIRM. (3) The General Floodplain District (GFP) consists of those riverine areas that may be covered by floodwater during the regional flood in which a floodway boundary has not been delineated on the FIRM and also includes shallow flooding areas identified as AH and AO zones on the FIRM. (4) The Coastal Floodplain District (CFP) is an area of special flood hazard extending from offshore to the inland limit of a primary frontal dune along an open coast, and any other area subject to high velocity wave action from storms, including areas identified as zone V, V1-30, or VE on the FIRM. Where a riverine AE floodway extends into the CFP district, development within the floodway must comply with the regulations for both the FW and CFP districts. Where a riverine A zone or AE zone with no floodway determination abuts the CFP district, the riverine study's floodway limit must be determined based on standard floodway expansion principles within the CFP district and development within the floodway must comply with the standards for both the FW and CFP districts.

(Ord. No. 05-23, § 1, 3-21-2023)

Ask a question about Green Bay law

Corpus searches the Green Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.