§ 8-47 — Building permits

Municipal Code, City of Green Bay, Wisconsin (Supp. 10: codified through Ordinance No. 11-26, enacted July 21, 2026 (online updated October 12, 2026)) · Green Bay Municipal Code § 8-47

Corpus is an independent public-information project, not the official City of Green Bay website. Stable reference: corpuslaw.us/code/80e4e495-dec9-46a1-ae6c-85b64a16c0e6

Sec. 8-47. - Building permits.

(a) Building permit required. No person shall erect or construct any building or structure, or shall add to, enlarge, move, improve, alter, convert, extend, or demolish any building or structure or cause the same to be done, or shall commence any work covered by this article on any structure without first obtaining a building permit therefor from the Director, provided the Director may authorize minor repairs not involving structural alterations without requiring a building permit to be issued. (1) Residential properties. The Director may issue a permit under this section to an owner currently living and residing at the property. For residential properties not occupied by the owner, the Director shall only issue a permit under this section to a contractor who holds a dwelling contractor certification or dwelling contractor qualifier certification issued by the State of Wisconsin. (b) Application. An application for a building permit shall be filed with the Director on a blank form to be furnished for that purpose. Such application shall describe the land upon which the proposed building or work is to be done, either by lot, block, tract, or similar general description which will readily identify and definitively locate the proposed building or work, shall show the use or occupancy of all parts of the building, and shall include such other pertinent information as may be required by the Director. (c) Information to accompany application. (1) Site plan. Each application for a building permit shall be accompanied by two copies of a site plan, drawn to scale, where not less than one inch equals 20 feet nor more than 1/16 -inch equals one foot, which shows the actual dimensions of the lot to be built upon, the size and location of the buildings to be erected, the proper relationship of the buildings to the exterior lines of existing or proposed streets shown on the Official Map, and such other information as may be necessary to provide for the enforcement of this article. Such site plan shall indicate the detailed legal description of the property as it appears of record. In the case of unplatted land or parcels conveyed by metes and bounds, the site plan, together with sufficient measurements to permit property determination, shall be submitted to the Director, who shall certify as to whether the proposal is in conflict with the Official Map. (2) Other data required. The following data shall be a part of, or shall accompany, all site plans submitted for approval: a. The location of streets, alleys, lot lines, and any other buildings on the same lot or property. b. The name of the owner. c. The intended use of all rooms. d. When required by the Director, computations, stress diagrams, and other data necessary to show the correctness of the plans. (3) Foundation specifications. When necessary, information concerning the size and material of the foundations and, if required, the loads to be placed thereon, where piles are to be driven, and the spacing, size, and materials of the piles and the load to be placed on each shall accompany the application for a building permit. (d) Reserved. (e) Conditions of approval of application. (1) Sanitary sewers. Where sanitary sewers are not installed or immediately available, no building permit shall be issued by the Director until a plumbing permit for an individual sewage disposal system has been issued in accordance with Section 8-370. (2) Right to inspect. The Director may, as a condition of the granting of a building permit, enter any premises for which such permit was issued at any reasonable time during the course of the work and until final inspection and approval thereof has been given to inspect such premises for compliance with all statutory and ordinance regulations concerning the construction, repair, use, and location of such building. (3) Buildings covered by State Building Code. a. Agent Municipality Status. The City of Green Bay has adopted appointed agent municipality status in accordance with SPS 361.60 and SPS 382 of the Wisconsin Administrative Code. As such, the City assumes plan examination and inspection responsibilities for the Department of Safety and Professional Services (DSPS) as outlined in this section. b. Scope of Jurisdiction. The City shall exercise plan review and inspection authority for all commercial buildings and structures, regardless of size, and all plumbing projects governed by SPS 382, including any plumbing project involving more than six fixtures for installations outlines in SPS Table 382.20-2. This includes, but is not limited to, new construction, additions, relocated buildings, repairs and alterations to buildings and structures. c. Municipal responsibilities. 1. The City shall provide commercial building inspections through certified inspectors as required under SPS 305. 2. The City shall provide plan examination services for all applicable commercial building, structural, and plumbing plans, in accordance with SPS 361 and SPS 382. d. Plan Examination Requirements. Drawings, specifications, and calculations shall be submitted for municipal review and approval for all commercial projects within city limits, including but not limited to the following: 1. New construction of any size commercial building or structure. 2. Additions of any size to existing commercial buildings, structures, or building systems, including plumbing, HVAC, fire alarm, or fire suppression systems. 3. Modifications to existing plumbing, HVAC, fire alarm, or fire suppression systems. 4. Component and system replacements where plan review is required under SPS 361 or SPS 382. 5. All plumbing projects involving more than six fixtures, regardless of total building size or use. 6. Any other project required by SPS 361.30 or SPS Table 382.20-2 to undergo plan review. e. Jurisdiction Waiver Provisions. 1. The City may elect to waive jurisdiction for a specific project, project type, or component, in which case plans shall be submitted to the Department for review. 2. Where DSPS waives jurisdiction and the City agrees to accept the review, the City shall assume plan review responsibility under this section. f. Plan Submission Procedures. Applicants shall provide the following for plan review and permitting: 1. A completed building permit application. 2. A completed plan review application on the appropriate State of Wisconsin form or equivalent municipal form. 3. Payment of plan review fees in accordance with the City's adopted fee schedule. Fees apply to all commercial building and plumbing projects. 4. One complete electronic set of documents, including: (a) Signed and sealed construction drawings prepared in accordance with SPS 361.31 and/or SPS 382.20. (b) Specifications related to the building and system design. (c) Component/system plans for plumbing, HVAC, fire alarm, fire suppression, or other applicable trades. (f) Specifications shall be in detail. All specifications in which general expressions are used to the effect that work shall be done "in accordance with the Building Code" or "to the satisfaction of the Director" shall be deemed imperfect and incomplete; and every reference to the Building Code shall be to the applicable section or subsection. (g) Permit fees. (1) Fees for building permits issued under this section shall be provided in the City Fee Schedule. (2) If an application for a building permit has not been obtained prior to the commencement of a job, the applicable permit fee shall be doubled. (h) Issuance of building permit. (1) When issued. If the application, plans, and specifications conform to the requirements of this article and to all other laws or ordinances applicable thereto, the Director shall, upon receipt of the required fee, issue a building permit for such work in the name of the owner and shall sign, date, and endorse in writing or by rubber stamp both sets of plans and specifications as "approved." (2) Who shall have plans and specifications. One such approved set of plans and specifications shall be retained by the Department and one shall be returned to the applicant, which set shall be kept at the site of such work at all times until the work authorized thereby is completed and shall be available for inspection by any public official. Such approved plans and specifications shall not be altered without written permission from the Director. (3) Evidence of permit. With every permit, Director shall also issue to the applicant an appropriate card properly filled out evidencing issuance of the permit. The permit holder shall place such card in a conspicuous place on the site of such authorized work, the card to be unobstructed from the public view and available for Inspectors to mark. (4) Lapse. A building permit shall lapse and be void unless the work authorized thereby is commenced within six months of the date thereof and completed or resumed within one year from the date thereof. If further construction is necessary after one year, the permit holder shall make written application in duplicate to the Director stating the reasons for the request for an extension at least 90 days prior to the expiration of the building permit, and the Director shall approve or reject the renewal permit application. The applicant may appeal the denial of a renewal permit application to the Board of Appeals. (5) Revocation. a. If the Director finds at any time that the ordinances, laws, orders, plans, and specifications herein are not being complied with, the building permit shall be revoked by written notice served on the general contractor, or on the person in charge of that phase of work in which the error or violation has occurred, and upon the owner. Such service shall be either personal or by mailing a copy of such notice to the address of the permit holder and by posting a copy of such notice at the work site. When any such permit is revoked, no person shall do any further work upon the subject building until a new permit is issued, excepting such work as the Director may authorize as reasonably necessary to protect work already done on the job, existing property, adjoining property, and/or the public. b. The permit holder may request a hearing on the revocation of said permit within 15 business days of receipt of notice of the City's intent to revoke the permit. c. The hearing on the revocation shall be held before the Board of Appeals. If the Board of Appeals revokes the permit, the permit holder may seek judicial review of the Board's decision by petition for writ of certiorari to the Brown County Circuit Court. (6) Violations and errors not excused by issuance. The issuance of a permit or the approval of plans and specifications shall not be deemed or construed to be permission for or approval of any violation of any provision of this article. No permit presuming to give authority to violate, or to fail to comply with, the provisions of this article shall be valid except insofar as the work or use which it authorizes is lawful. If, subsequent to the issuance of a permit, errors are discovered in the application, plans, specifications, or execution of the work, the Director may require the correction of such errors and may rescind the permit and prevent building operations from being further carried on thereunder when in violation of this article or any other City ordinances. (7) Preliminary foundation permit may be issued. Whenever any person has applied for a building permit and all of the provisions of this section have been complied with, particularly with respect to review and approval of the site plan and other necessary conditions of approval as set forth in subsection (e) of this section, the Director may issue a preliminary foundation permit allowing the permittee to construct the foundation of any building for which a permit is sought. Thereafter, the Director may issue the final permit upon approval of plans and specifications for the remaining portion of the building to be constructed above the foundation. Nothing contained herein shall require the Building Inspector to issue the final permit unless the plans and specifications for the remainder of the building to be constructed above the foundation are in proper order and approved. The Director shall not issue such preliminary foundation permit unless all necessary information provided hereunder has been reviewed and approved by the appropriate City departments and the only information remaining to be approved is the computation, stress diagrams, and other data necessary to show the correctness of the plans for that portion of the building to be constructed above the foundation. (i) Hearing when permit is denied. Any person whose application for a permit under this section has been denied may request and shall be granted a hearing on the matter before the Zoning Board of Appeals.

(Ord. No. 13-24, § 1, 7-30-2024; Ord. No. 12-25, § 1, 6-24-2025)

Ask a question about Green Bay law

Corpus searches the Green Bay sections it holds and shows the ones that match, with their citations. Free, no sign-in.