Sec. 10-58. - Excavations in streets.

All excavations in the streets for sewer and/or water connection or for any other purpose by person other than an authorized utility or contractor working for the City or utility shall conform to the following requirements: (1) Permit. Before the excavation is started, the person doing the work shall obtain the necessary permit and shall obtain full information on all existing underground structures, pipes, conduits, etc. (2) Damage. No excavation shall be carried on with a mechanical digger closer than two feet from such piping or underground structure. The actual work of exposing the piping or structures shall be done by hand and extreme care shall be exercised by the person doing the work so as not to injure such piping or structures, it will be repaired at the expense of the person or firm holding a permit to excavate in the public streets. (3) Width of trench. The width of the trench shall be kept as narrow as possible for safe working conditions and all excavated material shall be hauled away from the site and disposed of, unless excavated material is suitable for reuse in the opinion of the Plumbing Inspector. (4) No tunneling. No tunneling will be permitted under any portion of the roadway, except State and Federal Highways. (5) Filling trenches. When pipe laying has been completed in any street and has been approved by the Plumbing Inspector, all trenches shall be refilled with sand and gravel, to a height of not less than the present grade of said street at the time of excavation and extending full length into the property line. Sand and gravel shall be used as refill for all trenches and the last 12 inches of fill for said trenches shall be limestone rock or chips, and said trenches shall be properly mechanically compacted at six inch lifts. (6) Barricades. The street shall be kept barricaded and protected with flares until the City has repaired the trench upon notice to do so from the contractor or firm doing the work, and/or the Plumbing Inspector. (7) Final repairs by City. The City will make the final repairs of the excavation and restore the street surface. The expense of this work shall be borne by the person or firm holding the permit to excavate in the street. (8) Police Department, Fire Department and Bus Department to be notified. The Fire Department and Bus Department must be notified before any street is entirely blocked, and when it is opened. (9) Blocking highways. According to statute, no U.S. or State Highway can be blocked to the extent of more than 50 percent of the roadway at any time.

(Code 1976, § 15.02.080)

Ask a question about Janesville law

Corpus searches the Janesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.