For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 34-128 — Costs arising from permittee exceeding specifications; substantial projects

Code of General Ordinances of the City of Janesville, Wisconsin (Codified through Ordinance No. 2026-935, enacted May 26, 2026. (Supp. No. 20)) · Janesville Code of General Ordinances § 34-128

Corpus is an independent public-information project, not the official City of Janesville website. Stable reference: corpuslaw.us/code/61472eea-10c9-4338-b884-d86ba687a3c7

Sec. 34-128. - Costs arising from permittee exceeding specifications; substantial projects.

(a) A permittee exceeding the scope of the project reported in the written application shall fully and forthwith reimburse the City for all additional City costs incurred in addition to the fees otherwise applicable and/or paid for the entire project as established. Such actual costs shall include, but not be limited to, actual salaries and staff time, benefits, overhead, vehicle and equipment costs, copies and inspections. (b) Substantial projects. For applications that provide for a substantial undertaking of excavation within a public right-of-way attended by disruption of the general public and traffic, the City Engineer may assess the actual costs of the City employees' time engaged in review and inspection of the anticipated plans and work, multiplied by a factor determined by the City Engineer to represent the City's actual costs and expenses, benefits, insurance, sick leave, holidays, vacation and similar benefits, overhead and supervision, said factor not to exceed 2.0, plus the costs of mileage, vehicle rental/use attributed to the work, plus all consultant fees associated with the work at the invoiced amount plus ten percent for administration.

(Code 1976, § 12.16.060)

Ask a question about Janesville law

Corpus searches the Janesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.