For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 40-452 — Bypassing

Code of General Ordinances of the City of Janesville, Wisconsin (Codified through Ordinance No. 2026-935, enacted May 26, 2026. (Supp. No. 20)) · Janesville Code of General Ordinances § 40-452

Corpus is an independent public-information project, not the official City of Janesville website. Stable reference: corpuslaw.us/code/1159f08d-7bcf-41da-9cd0-b457c5ff7db6

Sec. 40-452. - Bypassing.

(a) A user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions identified hereafter. (b) Bypass notifications. (1) If a user knows in advance of the need for a bypass, it shall submit prior notice to the control authority, at least ten days before the date of the bypass, if possible. (2) The user shall follow the procedures identified in reporting potential problems as promulgated in Section 40-297 and shall submit the following information to the control authority within 24 hours of becoming aware of an unanticipated bypass that exceeds applicable pretreatment standards or, if this information is provided orally, a written submission must be provided within five days: a. A description of the bypass discharge and contributing factors causing the bypass; b. The duration of bypass, including exact dates and times or, if not corrected, the anticipated time the bypassing is expected to continue; c. Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the bypass. The control authority may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. (c) Bypass is prohibited, and the control authority may take an enforcement action against a user for a bypass, unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage which includes substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and (3) The user submitted notices as required under Subsection (b) of this section. (d) The control authority may approve an anticipated bypass, after considering its adverse effects, if the control authority determines that it will meet the three conditions listed under Subsection (c) of this section.

(Code 1976, § 16.16.710)

Ask a question about Janesville law

Corpus searches the Janesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.