For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 42-392 — Streets, highway and traffic standards

Code of General Ordinances of the City of Janesville, Wisconsin (Codified through Ordinance No. 2026-935, enacted May 26, 2026. (Supp. No. 20)) · Janesville Code of General Ordinances § 42-392

Corpus is an independent public-information project, not the official City of Janesville website. Stable reference: corpuslaw.us/code/875214a4-1c6a-4289-9c1f-313f50755aa9

Sec. 42-392. - Streets, highway and traffic standards.

Large developments generally involve significant land area and/or building area. As such they typically generate significant traffic and thus they often negatively impact existing street, highway and traffic improvements. In order to determine the impact from any such development on existing and planned streets, highways and traffic facilities, and to determine what, if any, new improvements are necessary to mitigate such impacts, a traffic study must be completed and submitted with each development proposal. Said study shall comply with the following standards: (1) A traffic impact study shall be completed for every large development as defined by the applicable zoning district regulations if determined necessary by the City Engineer. Said study shall be completed by a qualified engineer or equivalent professional or firm having past experience and expertise in completing such studies. (2) The cost of the study shall be paid for by the applicant. (3) The study shall analyze the existing transportation network in the area surrounding the large development site. This would entail identifying or collecting traffic volumes for all arterial, collector, and nonresidential local streets, conducting turning counts at major intersections, and a review of all planned transportation system improvements within an area surrounding the large development site as determined appropriate by the City Engineer. (4) The study shall identify existing and projected traffic volumes and turning movements for the aforesaid transportation network components. Traffic projections should be based on the full build-out of all lands within the study area using City land use plans for those areas that are undeveloped. (5) The study shall determine the existing and project the anticipated levels of service for all components of the transportation network within the study area as such levels of service are defined in the most recent edition of the Transportation Research Board's Highway Capacity Manual. (6) The study shall make recommendations for all improvements that may be necessary to maintain a level of service of D or better for all components of the transportation network. The Plan Commission may modify this requirement if they find that the construction of such improvements are impractical or excessive. (7) The study shall prorate on a percentage basis the portion of the need for any such improvements that can be attributed to the proposed large development covered by the study. (8) The applicant may be responsible for the installation costs of any improvements necessary to maintain a level of service of D or better on the transportation network components that would be adversely affected by the proposed development. The Plan Commission may modify this requirement if they find that the construction of such improvements are impractical or excessive.

(Code 1976, § 18.34.080)

Ask a question about Janesville law

Corpus searches the Janesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.