For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 42-560 — Administration

Code of General Ordinances of the City of Janesville, Wisconsin (Codified through Ordinance No. 2026-935, enacted May 26, 2026. (Supp. No. 20)) · Janesville Code of General Ordinances § 42-560

Corpus is an independent public-information project, not the official City of Janesville website. Stable reference: corpuslaw.us/code/2ae6811b-0a20-425f-aca1-f22862a0a74b

Sec. 42-560. - Administration.

(a) Designation. The City Council hereby designates the Community Development Director (hereinafter referred to as Director) and/or his or her designee to administer and enforce the provisions of this article. In the event of any conflict, the determination or interpretation of the Community Development Director shall prevail. (b) Responsibilities. The Director is hereby delegated the responsibility and authority to: (1) Approve or conditionally approve Zoning/Building Site Permits that do not exceed required height restrictions; (2) Advise applicants of the provisions of this chapter and assist them in preparing permit applications and appeals; (3) Issue permits and inspect any building site or improvement or use of land as required by this article; (4) Investigate and issue citations for violations of this article; (5) Maintain records of approvals, denials, conditions of approvals, and inspections made, and maintain a complete public record of all proceedings; (6) Maintain on file a list of all documentation of certified elevations; and (7) Review and make recommendations to the County Board of Supervisors on all zoning map changes and amendments to the text of Land Control Ordinances, including the Airport Overlay Zoning District Ordinance. (c) Powers. The Director shall have all the powers necessary to enforce the provisions of this article without limitation by reason of enumeration, including the following: (1) To require complete and accurate information necessary to make reasonable evaluations of applications; (2) To hear and grant applications for unclassified and unspecified uses, provided that such uses are similar in character to the principal uses permitted in the district; and (3) To hear and grant applications for temporary uses in any district, provided that such uses are of a temporary nature, do not involve the erection of a substantial structure, and are compatible with neighboring uses. The permit shall be temporary, revocable, subject to any conditions required by the Director, and shall be issued for a period not to exceed 12 months. Compliance with all other provisions of this article shall be required. (d) Zoning/building site permit. When required by this article, a zoning/building site permit (valid for one year) shall be obtained from the Director and/or his or her designee before the removal of or any change in the construction, alteration, location, or use of any existing use or proposed use. In all cases, the height limits of this chapter shall not be exceeded. The zoning/building site permit (for permit required uses or for existing uses when specified), which may include development and use related conditions, along with a signed affidavit (applicant's recorded affidavit accepting mitigation responsibilities), notifies applicants of their responsibilities and required mitigation for any construction, alteration, location or use of land to minimize potential hazardous impacts to the Southern Wisconsin Regional Airport, aircraft, airport operational areas, and aircraft overflight areas, as well as residents of the area. Failure to obtain a zoning/building site permit when required, shall be a violation of this chapter. Application for a permit shall be made to the Director and/or his or her designee upon furnished application forms and shall include the following data: (1) Name and address of the applicant, property owner, and contractor-builder; an accurate properly dimensioned map of the property, in duplicate showing; (2) Legal description of the property, the type of proposed use, and an indication as to whether new construction or a modification to an existing structure is involved; (3) A description of the proposed land use and building materials and landscaping materials; (4) When the Director deems necessary, the elevation of the highest point of the structure, object, or natural vegetation using National Geodetic and Vertical Datum when locating within the individual zone of the AOZD, including existing ground elevations reporting in Mean Sea Level (MSL), height of the structure or object above ground measured in feet (AGL), and top elevation measured in MSL; (5) When the Director deems necessary, evidence of submission for a Federal Aviation Administration (FAA) Form 7460-1, Notification of Proposed Construction or Alteration, commonly known as an airspace review. Receipt of final determination letter from the FAA is required prior to final approval or denial of a Zoning/Building Site Permit (as required for Permit Required Uses or for Existing Uses when specified); (6) Applicant's affidavit accepting mitigation responsibilities to ensure that any use, construction or alteration of such use is compatible with this article; and (7) Other permits. It is the responsibility of the applicant to secure all other necessary permits from all appropriate federal, state, and local agencies. (e) Application information. In order to secure evidence upon which to base its determination, the Director may require, in addition to the information required on Permit Application, the submission of plans of buildings; arrangement of operations; plat of grounds showing location and elevation of buildings, stockpiles, wells, septic systems, equipment storage, fences or screens, parking areas, traffic access, fill areas, floodproofing measures, landscaping; and any other pertinent information that may be necessary to determine if the proposed use meets the requirements of this chapter. Plans drawn to a scale of not less than one inch equals 200 feet showing the location, dimensions, elevations, and contours of the site; elevations of all pertinent structures, fill, or storage areas; size, location, and spatial arrangements of all proposed and existing structures on the site; location and elevations of streets, water supply, and sanitary facilities; and the relationship of the above to the Southern Wisconsin Regional Airport, as well as a particular zone of the AOZD. (f) Standards applicable to all permit required uses within the Airport Overlay Zoning District. Upon reviewing a zoning/building site permit application in the AOZD, the Director shall consider the factors listed below. In addition, the Director is not authorized to allow any use to exceed a height limitation in the AOZD. (1) Potential to create an undue concentration of people (density); (2) Potential to cause visual obstructions (through the creation of smoke, steam, dust, lighting or other unspecified obstruction) that would adversely effect aircraft operational areas and airspace, and specifically the proximity to runway ends, runway surfaces and extended runway centerlines; (3) Potential for noise sensitivity, and when necessary, ensuring building construction that reduces airport related noises for proposed uses; (4) Creation of electrical or navigational interference; (5) Creation of standing water areas or detention/retention ponds which may attract wildlife, thus designing or mitigating standing water areas or detention/retention ponds to avoid attracting wildlife; (6) Creation of wildlife attractants other than water; (7) Potential storage of flammable or hazardous materials limits as defined by the Wisconsin Commercial Building Code; (8) At the owner's expense, the technical expertise of a professional surveyor and/or engineer to determine exact locations and elevations. This may be done to confirm the accuracy of information supplied by the applicant. (g) Conditions of approval. Upon consideration of the factors listed above, the director may deny or approve the issuance of a zoning/building site permit; any approval may require attached conditions the committee designee deems necessary in furthering the purpose of this chapter. Violation of any of these conditions shall be deemed a violation of this chapter. (h) Appealing decisions of the Director. If the Director and/or his or her designee denies or conditionally approves a zoning/building site permit and the applicant disagrees with such decision, the applicant may appeal such denial or condition to the Plan Commission. Such an appeal shall be signed and filed in writing with the Planning Division within 30 days following the Committee Designee's determination or be forever barred. The Plan Commission may affirm, overrule or modify a decision of the Director and/or his or her designee.

(Code 1976, § 18.80.160)

Ask a question about Janesville law

Corpus searches the Janesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.