§ 36.05 — Definitions
Code of General Ordinances of the City of Kenosha, Wisconsin (Codified through Ordinance No. 33-26, adopted September 9, 2026. (Supp. No. 11, Update 2)) · Kenosha Code of General Ordinances § 36.05
Corpus is an independent public-information project, not the official City of Kenosha website. Stable reference: corpuslaw.us/code/1e59a358-6321-4717-9d3d-477af5119fae
36.05. - Definitions.
Administering Authority means the City's Director of Public Works, or his/her designee. Agricultural Facility means a structure associated with an agricultural practice, per the meaning given in Wis. Stats. § 281.16, or as amended. Agricultural Practice means beekeeping; commercial feedlots; dairying; egg production; floricultural; fish or fur farming; grazing; livestock raising; maintaining orchards; poultry raising; raising of grain, grass, mint and seed crops; raising of fruits, nuts and berries; sod farming; placing land in Federal programs in return for payments in kind; owning land, at least thirty-five (35) acres of which is enrolled in the Conservation Reserve Program under 16 USC 3831 to 3836; and, vegetable raising, per the meaning given in Wis. Stats. § 281.16, but vegetable raising is included in the definition of agricultural practice only if the pervious areas in which the vegetable raising activity is occurring is separated from pervious surfaces contiguous to the public right-of-way by a buffer area of grass which maintains separation of no less than ten (10) feet between the pervious area where the vegetable raising activity is occurring and the impervious area. As-Built means a record or plan illustrating how a project was built in fact and not necessarily how it was planned. Average Annual Rainfall means a calendar year of precipitation, excluding snow, which is considered typical. Best Management Practice (BMP) means structural or non-structural measures, practices, techniques or devices employed to avoid or minimize soil, sediment or pollutants carried in runoff to waters of the State. Business Day means a day the office of the City's Director of Public Works is routinely and customarily open for business. Cease and Desist Order means a court-issued order to halt land-disturbing construction activity that is being conducted without the required permit. Combined Sewer System means a system for conveying both sanitary sewage and storm water runoff. Connected Imperviousness means an impervious surface that is directly connected to a separate storm sewer or water of the State via an impervious flowpath. Design Storm means a hypothetical discrete rainstorm characterized by a specific duration, temporal distribution, rainfall intensity, return frequency, and total depth of rainfall. Development means residential, commercial, industrial or institutional land uses and associated roads. Division of Land means the creation from one (1) parcel of five (5) or more parcels or buildings sites of five (5) or fewer acres each in area where such creation occurs at one (1) time or through the successive partition within a five-year period. Effective Infiltration Area means the area of the infiltration system that is used to infiltrate runoff and does not include the area used for site access, berms or pretreatment. Erosion means the process by which the land's surface is worn away by the action of wind, water, ice or gravity. Exceptional Resource Waters means waters listed in Section NR 102.11, Wisconsin Administrative Code. Extraterritorial means the unincorporated area with three (3) miles of the corporate limits of the City of Kenosha. Final Stabilization means that all land-disturbing construction activities at the construction site have been completed and that a uniform perennial vegetative cover has been established, with a density of at least seventy (70) percent of the cover, for the unpaved areas and areas not covered by permanent structures, or that employ equivalent permanent stabilization measures. Financial Guarantee means a Performance Bond, Maintenance Bond, Surety Bond, Irrevocable Letter of Credit, or similar guarantees submitted to the Director of Public Works, or his/her designee, by the responsible party to assure that the requirements of this Chapter are carried out in compliance with the Stormwater Management Plan. Governing Body means the Common Council of the City of Kenosha, Wisconsin. Impervious Surface means an area that releases as runoff all or a large portion of the precipitation that falls on it, except for frozen soil. Rooftops, sidewalks, driveways, parking lots and streets, including those comprised of compacted stone or gravel, are examples of areas that typically are impervious surfaces. In-Fill Area means an undeveloped area of land located within existing development. Infiltration means the entry of precipitation or runoff into or through the soil. Infiltration System means a device or practice, such as a basin, trench, rain garden or swale designed specifically to encourage infiltration, but does not include natural infiltration in pervious surfaces such as lawns, redirecting of rooftop downspouts onto lawns or minimal infiltration from practices, such as swales or roadside channels designed for conveyance and pollutant removal only. Karst Feature means an area or surficial geologic feature subject to bedrock dissolution so that it is likely to provide a conduit to groundwater, and may include caves, enlarged fractures, mine features, exposed bedrock surfaces, sinkholes, springs, seeps or swallets. Land-Disturbing Construction Activity means any manmade alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the State. Land-Disturbing Construction Activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities. Maintenance Agreement means an agreement that provides for long term maintenance of stormwater management practices. MEP or Maximum Extent Practicable means a level of implementing Best Management Practices in order to achieve a performance standard specified in this Chapter which takes into account the best available technology, cost effectiveness and other competing issues, such as human safety and welfare, endangered and threatened resources, historic properties and geographic features. MEP allows flexibility in the way to meet the performance standards and may vary based on the performance standard and site conditions. Navigable, when applied to a waterway, means is capable of floating any boat, skiff, canoe, or kayak, of the shallowest draft used for recreational purposes in a waterway, that if not occurring continuously, at least occurs seasonably of a sufficient length of time to make the waterway useful as a highway. New Development means development resulting from the conversion of previously undeveloped land or agricultural land uses. Non-Navigable, when applied to a waterway, means not navigable. Off-Site means located outside the property boundary described in the permit application. On-Site means located within the property boundary described in the permit application. Ordinary High Water Mark means the point on the bank or shore up to which the presence and action of surface water is so continuous as to leave a distinctive mark, such as by erosion, destruction or prevention of terrestrial vegetation, predominance of aquatic vegetation, or other easily recognized characteristics. Where the bank or shore at any particular place is of such character that it is difficult or impossible to ascertain where the point of the ordinary high water mark is, recourse may be had to the opposite bank of a stream or to other places on the shore of a lake or flowage to determine whether a given stage of water is above or below the ordinary high water mark in Section NR 115.03(6), Wisconsin Administrative Code, per the meaning in Section NR 115.03, Wisconsin Administrative Code, or as amended. Outstanding Resource Waters means waters listed in Section NR 102.10, Wisconsin Administrative Code. Percent Fines means the percentage of a given sample of soil, which passes through a #200 sieve. Performance Standard means a narrative or measurable number specifying the minimum acceptable outcome for a facility or practice. Permit means a written authorization made by the Director of Public Works, or designee, to the applicant to conduct land-disturbing construction activity or to discharge post-construction runoff to waters of the State. Permit Administration Fee means a sum of money paid to the Director of Public Works or his/her designee by the permit applicant for the purpose of recouping the expenses incurred by the authority in administering the permit. Pervious Surface means an area that releases as runoff a small portion of the precipitation that falls on it. Lawns, gardens, parks, forests or other similar vegetated areas are examples of surfaces that typically are pervious surfaces. Pollutant means any dredged spoil, solid waste, incinerator residue, sewage, garbage, refuse, oil, sewage sludge, munitions, chemical wastes, biological materials, radioactive substance, heat, wrecked or discarded equipment, rock, sand, cellar dirt and industrial, municipal and agricultural waste discharged into water, per the meaning given in Wis. Stats. § 283.01, or as amended. Pollution includes contaminating or rendering unclean or impure the waters of the State, or making the same injurious to public health, harmful for commercial or recreational use, or deleterious to fish, bird, animal or plant life, per the meaning given in Wis. Stats. § 281.01, or as amended. Post-Construction Site means a construction site following the completion of land-disturbing construction activity and final site stabilization. Pre-Development Condition means the extent and distribution of land cover types present before the initiation of land-disturbing construction activity, assuming that all land uses prior to development activity are managed in an environmentally sound manner. Preventive Action Limit means a numerical value expressing the concentration of a substance in groundwater which is adopted under Wis. Stats. § 160.15, and Sections NR 140.10, 140.12 or 140.20, Wisconsin Administrative Code, per the meaning given in Section NR 140.05, Wisconsin Administrative Code, or as amended. Protective Area means an area of land that commences at the top of the ordinary high water mark of lakes, streams, or rivers, or at the delineated boundary of wetlands, and that is the greatest of the following widths, as measured horizontally from the top of the channel or delineated wetland boundary to the closest impervious surface. 1. For outstanding resource waters and exceptional resource waters, and for wetlands in areas of special natural resource interest as specified in Section NR 103.04, Wisconsin Administrative Code, seventy-five (75) feet. 2. For perennial and intermittent streams identified on a United States geological survey 7.5 minute series topographic map, or a County soil survey map, whichever is more current, fifty (50) feet. 3. For lakes, fifty (50) feet. 4. For highly susceptible wetlands, fifty (50) feet. Highly susceptible wetlands include the following types: fens, sedge meadows, bogs, low prairies, conifer swamps, shrub swamps, other forested wetlands, fresh wet meadows, shallow marshes, deep marshes and seasonally flooded basins. Wetland boundary delineations shall be made in accordance with Section NR 103.08(1m), Wisconsin Administrative Code. This Section does not apply to wetlands that have been completely filled in accordance with all applicable State and Federal regulations. The protective area for wetlands that have been partially filled in accordance with all applicable State and Federal regulations shall be measured from the wetland boundary delineation after fill has been placed. 5. For less susceptible wetlands, ten (10) percent of the average wetland width, but no less than ten (10) feet, nor more than thirty (30) feet. Less susceptible wetlands include degraded wetlands dominated by invasive species, such as reed canary grass. 6. In Paragraphs 1, 4, and 5 of this definition, determinations of the extent of the protective area adjacent to wetlands shall be made on the basis of the sensitivity and runoff susceptibility of the wetland in accordance with the standards and criteria in Section NR 103.03, Wisconsin Administrative Code. 7. For concentrated flow channels with drainage areas greater than one hundred thirty (130) acres, ten (10) feet. Redevelopment means areas where development is replacing older development. Responsible Party means any entity holding fee title to the property or performing services to meet the performance standards of this Chapter through a contract or other agreement. Runoff means storm water or precipitation, including rain, snow or ice melt or similar water that moves on the land surface via sheet or channelized flow. Separate Storm Sewer means a conveyance or system of conveyances, including roads with drainage systems, streets, catch basins, curbs, gutters, ditches, constructed channels or storm drains, which meet all of the following criteria: 1. Is designed or used for collecting water or conveying runoff. 2. Is not part of a combined sewer system. 3. Is not draining to a storm water treatment device or system. 4. Discharges directly or indirectly to waters of the State. Site means the entire area included in the legal description of the land on which the land-disturbing construction activity is proposed in the permit application. Stop Work Order means an order issued by the Director of Public Works, or his/her designee, which requires that all construction activity on the site be stopped. Stormwater Management Facilities means facilities designed to properly manage stormwater runoff in accordance with the City's Stormwater Management Criteria, which criteria may be updated or amended from time to time. Stormwater Management Plan means a comprehensive plan designed to reduce the discharge of pollutants from stormwater after the site has undergone final stabilization following completion of the construction activity. Stormwater Management System Plan is a comprehensive plan designed to reduce the discharge of runoff and pollutants from hydrologic units on a regional or municipal scale. Technical Standard means a document that specifies design, predicted performance and operation and maintenance specifications for a material, device or method. Top of the Channel means an edge or point on the landscape, landward from the ordinary high water mark of a surface water of the State, where the slope of the land begins to be less than twelve (12) percent continually for at least fifty (50) feet. If the slope of the land is twelve (12) percent or less continually for the initial fifty (50) feet, landward from the ordinary high water mark, the top of the channel is the ordinary high water mark. TR-55 means the United State Department of Agriculture, Natural Resources Conservation Service (previously Soil Conservation Service), Urban Hydrology for Small Watersheds, Second Edition, Technical Release 55, June 1986. Type II Distribution means a rainfall-type curve as established in the United States Department of Agriculture, Soil Conservation Service, Technical Paper 149, published 1973. The Type II curve is applicable to all of Wisconsin and represents the most intense storm pattern. Waters of the State includes those portions of Lake Michigan and Lake Superior within the boundaries of this State, and all lakes, bays, rivers, streams, springs, ponds, wells, impounding reservoirs, marshes, watercourses, drainage systems and other surface water or groundwater, natural or artificial, public or private, within this State or its jurisdiction, per the meaning given in Wis. Stats. § 281.01, or as amended.
Ask a question about Kenosha law
Corpus searches the Kenosha sections it holds and shows the ones that match, with their citations. Free, no sign-in.
