§ 5.10 — Minimum Wage Scale for Certain Public Works Contracts
Code of General Ordinances of the City of Kenosha, Wisconsin (Codified through Ordinance No. 33-26, adopted September 9, 2026. (Supp. No. 11, Update 2)) · Kenosha Code of General Ordinances § 5.10
Corpus is an independent public-information project, not the official City of Kenosha website. Stable reference: corpuslaw.us/code/38cb5143-16e0-4667-a3e9-4b4b32364718
5.10. - Minimum Wage Scale for Certain Public Works Contracts.
A. Definitions. In this Chapter: Building or Work shall mean construction activity as distinguished from manufacturing, furnishing of materials, or servicing and maintenance work, but "building or work" shall include the delivery of mineral aggregate such as sand, gravel, asphaltic concrete or stone which is incorporated into the work under contract with the City by depositing the material substantially in place, directly or through spreaders, from the transporting vehicle. Public Works Construction shall mean building or work involving the erection, construction, remodeling, repairing or demolition of buildings, parking lots, sidewalks, street lighting, traffic signals, sanitary sewers, water mains and appurtenances, storm sewers, and the grading and landscaping of public lands. B. Application. This Chapter shall only be applicable to public works construction contracts estimated to be over twenty-five thousand dollars ($25,000.00). C. Minimum Wage Scale. The Director of Public Works, or his/her designee, or the Manager of the Kenosha Water Utility, or his/her designee, prior to the bidding or letting of a contract for any public works construction, shall determine the rate of wage scale which shall be paid by the contractor to the employees upon the project. Except for known increases contained within the schedule, the prevailing wage rate shall not change during the contract. The Director of Public Works, or his/her designee, or the Manager of the Kenosha Water Utility, or his/her designee, shall apply to the Wisconsin Department of Workforce Development with respect to public works construction where it has jurisdiction, to ascertain the prevailing wage rate, hours of labor and hourly basic pay rates in all trades and occupations required in the work contemplated. In other cases, the Director of Public Works, or his/her designee, or the Manager of the Kenosha Water Utility, or his/her designee, shall make said determinations. No laborer, worker or mechanic employed directly upon the site of the project by the contractor or by a subcontractor, agent or other person, doing or contracting to do any part of the work, may be paid less than the prevailing wage rate in the same or most similar trade or occupation; nor may he or she be permitted to work a greater number of hours per day or per calendar week than the prevailing hours of labor determined under this Subsection, unless he or she is paid for all hours in excess of the prevailing hours at a rate of at least one and one-half (1½) times his or her hourly basic rate of pay. An employee's classification shall not be changed to a classification of a lesser rate during the contract. This Subsection does not apply to wage rates and hours of employment of laborers, workers or mechanics engaged in the processing or manufacture of materials or products, or to the delivery thereof by or for commercial establishments which have a fixed place of business from which they regularly supply such processed or manufactured materials or products. This Subsection does apply to laborers, workers or mechanics delivering mineral aggregate such as sand, gravel or stone which is incorporated into the work under the contract by depositing the material substantially in place, directly or through spreaders, from the transporting vehicle. Questions regarding employee classification, rate of pay or rate of pay within a classification, shall be resolved by reference to the established practice that predominates in the industry and on which the trade or occupation rate/classification is based. D. Records And Evidence Of Compliance. Each contractor, subcontractor or agent thereof participating in a project covered by this Chapter shall keep full and accurate records clearly indicating the name and trade or occupation of every laborer, worker or mechanic employed thereby in connection with the project and an accurate record of the number of hours worked by each employee and the actual wages paid therefor. Each agent or subcontractor shall furnish the contractor with evidence of compliance with this Subsection. Upon completion of the project and prior to final payment therefor, each contractor shall file with the Department of Public Works or the Kenosha Water Utility, whichever Department determined the wage scale in Subsection C. herein, an affidavit stating that contractor has complied fully with the provisions and requirements of this Chapter, and that contractor has received evidence of compliance from each of contractor's agents and subcontractors. No final payment shall be made until such an affidavit is filed in proper form and order. The Director of Public Works, or Manager of the Kenosha Water Utility, or City Attorney, or designee thereof, may demand and examine copies of any payrolls and other records and information relating to the wages paid laborers, workers or mechanics on work to which this Chapter applies. E. Bids, Classifications and Posting. 1. Reference to prevailing wage rates and hours of labor determined by the Wisconsin Department of Workforce Development shall be published in the notice issued for the purpose of securing bids for the project. Wherever any contract for any public works construction is entered into, the wage rates and hours determined shall be incorporated into and made a part of such contract. 2. After bids have been opened and made public, the contractor who has submitted the apparent low bid, by the end of the next regular work day of the City, shall submit in writing the classifications of all the employees of the contractor, subcontractors and agents, and the total number of hours estimated in each classification for the work. The classifications shall be reviewed by the Director of Public Works or General Manager of the Kenosha Water Utility, who may, within ten (10) days, object to any classification which is not reflective of that which would be required for the work. Failure to comply with this paragraph may result in rejection of the bid. 3. For the information of the employees working on the project, the wage rates and hours determined by the Department of Workforce Development, the Director of Public Works, or General Manager of the Kenosha Water Utility shall be kept posted by the employer in at least one (1) conspicuous and easily accessible place at the site of the project. F. Penalty. Whenever the Director of Public Works, General Manager of the Kenosha Water Utility, or the Department of Workforce Development for the State of Wisconsin, has established a rate of wage scale to be paid to employees for public works construction by a contractor and it is found upon due proof that the contractor is not paying or has failed to pay the wage scale established, or is directly or indirectly, by a system of rebates or otherwise, violating this Chapter, the contractor may be required to pay a forfeiture not to exceed five hundred dollars ($500.00) for each offense, plus the costs of prosecution. The failure to pay the required wage to an employee for any one (1) week or part thereof constitutes a separate offense.
Ask a question about Kenosha law
Corpus searches the Kenosha sections it holds and shows the ones that match, with their citations. Free, no sign-in.
