For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.05 — Shoreland, Wetlands, and Floodlands: Administration

Code of General Ordinances of the City of Kenosha, Wisconsin (Codified through Ordinance No. 33-26, adopted September 9, 2026. (Supp. No. 11, Update 2)) · Kenosha Zoning Ordinance § 8.05

Corpus is an independent public-information project, not the official City of Kenosha website. Stable reference: corpuslaw.us/code/1275254f-4695-4831-84a9-066301e0f947

8.05. - Shoreland, Wetlands, and Floodlands: Administration.

A. Zoning Permits. Unless another section of this Ordinance specifically exempts certain types of development from this requirement, a Zoning Permit shall be obtained from the Administrator before any New Construction, as defined in Section 12.0.B. of this Ordinance; repair, modification or addition to an existing structure or any change in the use of an existing building or structure including sewer and water facilities, may be initiated. Applications shall include: 1. An application for a Zoning Permit shall be made to the Administrator upon forms furnished by the municipality and shall include, for the purpose of proper enforcement of these regulations, the following information: a. Name, address, and telephone number of applicant, property owner and contractor, where applicable. b. Legal description of the property and a general description of the proposed use or development including if it is new construction or a modification. c. Whether or not a private water supply or sewage system is to be installed. 2. The Site Development Plan shall be submitted as a part of the permit application and shall contain the following information drawn to scale: a. Location, dimensions, area and elevation of the lot; b. Location of any structures with distances measured from the lot lines and centerline of all abutting streets or highways; c. Description of any existing or proposed on-site sewage systems or private water supply systems; d. Location of the ordinary high-water mark of any abutting navigable waterways; e. Boundaries of all wetlands; f. Existing and proposed topographic and drainage features and vegetative cover; g. Location of floodplain and floodway limits on the property as determined from floodplain zoning maps; h. Location of existing or future access roads; i. Specifications and dimensions for areas of proposed wetland alteration; j. The elevation of the lowest floor of proposed buildings and any fill using the vertical datum from the adopted study—either National Geodetic Vertical Datum (NGVD) or North American Vertical Datum (NAVD); k. Data sufficient to determine the regional flood elevation in National Geodetic Vertical Datum or North American Vertical Datum at the location of the development and to determine whether or not the requirements of Section 3.20 or 17.0 are met; and l. Data to determine if the proposed development will cause an obstruction to flow or an increase in regional flood height or discharge according to Section 2.08. This may include any of the information noted in Section 3.20. 3. All permits issued under the authority of this Ordinance shall expire one hundred eighty (180) days after issuance. 4. When a Zoning Permit is approved, an appropriate record shall be made by the Administrator of the use and structures permitted. 5. When the conditions of a Zoning Permit are violated, the permit shall be revoked by the Board of Appeals. B. Certificate of Compliance. 1. Except where no Zoning Permit is required, no land shall be occupied or used, and no building which is thereafter constructed, altered, added to, modified, rebuilt or replaced shall be occupied, until a Certificate of Compliance is issued by the Administrator subject to the following conditions: a. The Certificate of Compliance shall show that the building or premises or part thereof, and the proposed use thereof, conform to the provisions of this Ordinance. b. Application for such certificate shall be concurrent with the application for a Zoning or Conditional Use Permit. c. The Certificate of Compliance shall be issued within ten (10) days after notification of the completion of the work specified in the Zoning or Conditional Use Permit, providing the building or premises and proposed use thereof conform with all the provisions of this Ordinance. 2. The Administrator may issue a temporary Certificate of Compliance for a building, premises or part thereof pursuant to rules and regulations established by the municipal governing body. 3. Upon written request from the owner, the Administrator shall issue a Certificate of Compliance for any building or premises existing at the time of Ordinance adoption, certifying after inspection, the extent and type of use made of the building or premises and whether or not such use conforms to the provisions of this Ordinance. C. Reserved. D. Reserved. E. Zoning Agency. 1. The City Plan Commission shall: a. Oversee the functions of the office of the Administrator; and b. Review and advise the Common Council on all proposed amendments to this ordinance, maps and text. 2. The City Plan Commission shall not: a. Grant variances the terms of the ordinance in place of action by the Board of Zoning Appeals; or b. Amend the text or zoning maps in place of official action by the Common Council. F. Other Permits. Prior to obtaining a floodplain development permit the applicant must secure all necessary permits from federal, state, and local agencies, including, but not limited to, those required by the U.S Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act, Amendments of 1972, 33 U.S.C. 1344. G. Public Information. 1. Place marks on structures to show the depth of inundation during the regional flood. 2. All maps, engineering data and regulations shall be available and widely distributed. 3. Real estate transfers should show what floodplain district any real property is in.

(Ord. No. 08-24, § 1, 2-21-2024)

Ask a question about Kenosha law

Corpus searches the Kenosha sections it holds and shows the ones that match, with their citations. Free, no sign-in.