For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 103-34 — Permits

Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 103-34

Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/27aba48e-80a0-41a6-9a77-487d0c518b62

Sec. 103-34. - Permits.

(a) Permits required. (1) No building, or any part thereof, shall be erected, constructed, reconstructed, altered, remodeled, moved, or wrecked, nor shall any person make any repairs to buildings or structures damaged by fire or otherwise, nor commence excavation for any building or structure, or part thereof, unless a permit therefor shall be first obtained by the owner or his agent from the Fire Department - Division of Fire Prevention and Building Safety. (2) Alterations and repairs. The following provisions shall apply to buildings altered or repaired: a. Alterations. When not in conflict with any regulations, alterations to any existing building or structure accommodating a legal occupancy and use but of substandard type of construction, which involves either beams, girders, columns, bearing or other walls, room, heating and air conditioning systems, arrangement, light and ventilation, changes in location of exit stairways or exits, or any or all of the above, then such existing construction shall be made to conform to the minimum requirements of this article applicable to such occupancy and use and given type of construction. b. Repairs. Repairs for purposes of maintenance, or replacements in any existing building or structure which do not involve the structural portions of the building or structure or which do not affect room arrangement, light and ventilation, access to or efficiency of any exit stairways, or exits, fire protection, or exterior aesthetic appearance and which do not increase a given occupancy or use, shall be deemed minor repairs. c. Alterations when not permitted. When any existing building or structure, which, for any reason whatsoever, does not conform to the regulations of this article, has deteriorated from any cause whatsoever to an extent greater than 50 percent of the equalized value of the building or structure, no alterations or moving of such building or structure shall be permitted. Any such building or structure shall be considered a menace to public safety and welfare and shall be ordered vacated and thereafter demolished and debris removed from the premises. d. Alterations and repairs required. When any of the structural members of any building or structure have deteriorated from any cause whatsoever to less than their required strength, the owner of such a building or structure shall cause such structural members to be restored to their required strength; failing in which the building or structure shall be considered a menace to public safety and shall be vacated and thereafter no further occupancy or use of the same shall be permitted until the regulations of this article are complied with. e. Extent of deterioration. The amount and extent of deterioration of any existing building or structure shall be determined by the Fire Department - Division of Fire Prevention and Building Safety. (3) Stairways. Construction or replacement of stairs to an existing building, except as otherwise required by applicable State or Federal law, do not require the obtaining of a building permit if the landing for such stairway is not more than 18 square feet in dimension and the stairway does not exceed three risers, none of which shall exceed eight inches in height. (b) Applications. Any person desiring a building or demolition permit shall file an application with the Fire Department - Division of Fire Prevention and Building Safety containing information required by the Department. (c) Plans and specifications. (1) All applications for building permits shall be accompanied by specifications and plans in duplicate, drawn to scale, showing the actual shape and dimensions of the lot to be built upon, the exact size and location on the lot of the buildings and accessory buildings existing, and the lines within which the buildings or structures shall be erected or altered, the existing and intended use of each building or part of building, the number of families the building is designed to accommodate, and such other information with regard to the lot and neighboring lots as may be necessary to determine compliance with this article. One copy of the plans shall be returned to the owner when approved. Plans which do not contain sufficient information to determine compliance with this article shall be rejected. Plans shall be drawn to scale upon substantial paper or electronic. Essential parts shall be drawn to a scale of not less than one-eighth inch to one foot. Plans and specifications shall describe the work proposed sufficiently to show compliance with the law. Computations, strain sheets, stress diagrams and other data necessary to show the correctness of the plans shall accompany the plans and specifications when required by the Fire Department. All plans shall bear the name of the architect, engineer, or person responsible for their preparation, and in no case shall permits be issued when such person has failed to comply with Wis. Stat. § 102.31. At the discretion of the Fire Department, the submission of plans and specifications for private garages, small sheds or small, unimportant work may be waived. (2) All applications for demolition or wrecking permits shall be accompanied by a drawing showing the size and location on the lot of the building, buildings or structures to be demolished, the owner of the property, the owner's address, the name of any contractor and the contractor's address who is to perform the demolition. The application shall also show the current zoning of the lot or parcel of land where the building or structure to be demolished is located as well as the intended use of the lot or parcel of land after demolition. The application shall also contain the required signoffs that all utilities are properly cut and capped and any other information deemed necessary by the Fire Department on forms provided by the Fire Department. All applications shall be signed by the owner of the building or the owner's authorized representative. (d) Issuance of permits. (1) Plans and specifications which comply with all applicable laws and regulations, including the zoning, subdivision control and airport ordinances, shall be endorsed or stamped "Approved" and the permit shall be issued in the name of the owner. Applications shall be acted upon within ten days. If plans and specifications do not comply with all applicable laws and regulations, Fire Department - Division of Fire Prevention and Building Safety shall refuse to issue the permit. One approved set of specifications and plans shall be retained by the Fire Department - Division of Fire Prevention and Building Safety, and one set shall be returned to the applicant, which latter set shall be kept on the building site at all times while the work authorized thereby is in progress, and shall be open to inspection by authorized public officials. The issuance of a permit shall not prevent the Fire Department - Division of Fire Prevention and Building Safety from thereafter requiring the correction of errors in the plans and specifications. All work performed under a permit shall conform to the approved application and plans, and approved amendments thereto. (2) Except as provided for by chapter 115, article VI and with respect to historic buildings as provided for in this chapter, all applications for wrecking or demolition permits shall be acted upon within ten days after submission of the same provided such applications are complete as required by the City Fire Department - Division of Fire Prevention and Building Safety. The Fire Department - Division of Fire Prevention and Building Safety shall refuse to issue a wrecking or demolition permit until any required conditional use permit be obtained or should the intended or proposed use of the lot or parcel of land after demolition be contrary to existing zoning or other State, Federal or local regulations. Any proposed or intended use after demolition which requires zoning which requires zoning changes shall mean that the demolition permit application shall be held in abeyance by the Fire Department - Division of Fire Prevention and Building Safety until such time as any requisite zoning changes are made and approved by the Common Council. The Fire Department - Division of Fire Prevention and Building Safety shall also notify the applicant that should the applicant not use the lot or parcel of land in accordance with the stated intended use or in, accordance with the zoning in effect at the time of the application, that no required zoning changes or variances shall be permitted for a period of two years after demolition unless the same is waived by the Common Council. The provisions in this subsection prohibiting the issuance of a demolition permit shall not apply to buildings or structures that are ordered demolished under applicable local, State or Federal law. (3) No building permits shall be issued during the period of time when temporary zoning is provided with the annexation in accordance with Wis. Stat. § 66.0227, unless such temporary zoning is the same as that provided at the time of filing of the petition. (e) Posting. (1) Issuance of a permit shall include delivery of a permit placard which shall be posted in a conspicuous place on the building or premises where the work is being done, and easily accessible for notation of inspection. (2) It shall be the responsibility of the owner, applicant, authorized agent and contractor to contact the Fire Department - Division of Fire Prevention and Building Safety regarding required inspections. Failure to comply with this subsection may result in penalties under section 103-62. (f) Revocation of permits. (1) The Chief Inspector may revoke any building, plumbing, HVAC or electrical permit, certificate of occupancy, or approval issued under the regulations of this chapter and may stop construction or use of approved new materials, equipment, methods of construction, devices or appliances for any of the following reasons: (2) The notice revoking a building, plumbing, HVAC or electrical permit, certificate of occupancy or approval shall be in writing and may be served upon the applicant of the permit, owner of the premises and the owner's agent, if any, and on the person having charge of construction. A revocation placard shall also be posted upon the building, structure, equipment or premises in question by the Fire Department. After the notice is served upon the persons as aforesaid and posted, it shall be unlawful for any person to proceed thereafter with any construction whatsoever on the premises, and the permit which has been so revoked shall be null and void, and before any construction or operation is again resumed, a new permit, as required by this division, shall be procured and fees paid therefor, and thereafter the resumption of any construction or operation shall be in compliance with the regulation of this division. However, such work as the Chief Inspector may order as a condition precedent to the reissuance of the building permit may be performed, or such work as he may require for the preservation of life and safety. (g) Expiration. (1) Except as otherwise provided herein, permits shall expire if the building or work authorized is not commenced within six calendar months from the date the permit is issued, or is suspended, abandoned or substantial progress is not shown for a period of 60 days at any time after the work is commenced. Before such work can be recommenced a new permit shall be first obtained, and the fee therefore shall be the same amount required for a new permit. For purposes of this section, the term "substantial progress" shall mean at least 20 percent of the exterior coverings applied or 20 percent of the project completed as determined by the Fire Department. (2) Permits issued for the demolition of buildings shall expire within 90 days of issuance. Any building not completely demolished within this period of time is hereby declared a public nuisance and the City may then enter upon the premises and complete the demolition in accordance with the requirements of this article. The cost of such demolition shall be charged against the real estate upon which such building is located and shall be a lien upon such real estate, and shall be assessed and collected as a special tax. (h) Permit fees. (1) Permit fees shall be based upon the square footage of work to be done, as determined by the Fire Department - Division of Fire Prevention and Building Safety on the basis of total square footage, in the amount established by resolution. (2) Definitions. The following definitions apply to calculation of the applicable fee: Commercial or industrial building means a building or structure that houses a business or industrial use, enterprise, or activity at a greater scale than a home occupation or involving the manufacturing of, distribution of, retail or wholesale marketing of goods or services. Dwelling unit means a single unit providing complete, independent living facilities for one or more persons, including permanent provisions for living, sleeping, cooking, and sanitation. Multiple-family residential building means a single building or structure containing more than one dwelling unit under single ownership and in which the owner rents or leases the right to occupy any of the dwelling unit to a tenant(s). Residential means used by occupants as a home, abode, domicile, or dwelling that has housekeeping and cooking facilities for the occupants only. A residential property may have multiple dwelling units. Residential condominium means a multiple dwelling or development containing individually owned dwelling units and shared areas and facilities. (3) The permit fee shall be doubled when work is commenced before a permit is obtained. Other penalties provided by this Code may also be invoked. The permit fee shall be doubled when an applicant seeks expedited review of a permit application. (4) There shall be no permit fees charged for Municipal, County, School District of La Crosse, State or Federal construction projects. (5) Refunds. Permit fees charged in error will be refunded in full. Plan review fees are not refundable for projects that are abandoned or rescinded voluntarily. A fee of 20 percent of the permit fee collected (not including plan review fees) will be retained as an administration charge. (6) The Fire Department - Division of Fire Prevention and Building Safety shall issue a statement showing permit fees to be paid, which statement shall be filed with the Director of Finance/Treasurer and payment thereof made by the applicant. Upon presentation to the Fire Department - Division of Fire Prevention and Building Safety of the receipt of the Director of Finance/Treasurer showing the payment of all required fees, it shall thereupon issue the permit. (7) Beginning January 1, 2010, and each January 1 thereafter, all fees under this subsection (h) shall automatically increase by the Consumer Price Index for All Urban Consumers (SPI-U) or as approved by the Common Council. (8) In addition to the above fees, there shall be paid the costs of the State Seal as provided for in Wis. Admin. Code § SPS 320.09. (9) In addition to the above fees, there shall be paid the costs of the State Seal as provided for in Wis. Admin. Code § SPS 320.09. (i) Wrecking permits for historic buildings. The Fire Department - Division of Fire Prevention and Building Safety shall not issue any wrecking or demolition permit for a historic building or structure after it has been noticed for designation or designated as such by the Heritage Preservation Commission except according to the procedure provided in article II of chapter 20. (j) Permits for properties located in the floodway district and flood zoning overlay districts. All permits for new structures or buildings or substantial improvements to existing structures or buildings located in the Floodway District or Flood Zoning Overlay Districts shall include an elevation certificate, FEMA Form 086-0-33, signed by a land surveyor, engineer or architect who is authorized by State or local law to certify elevation information.

(Code 1980, § 16.02; Ord. No. 4911, § I(attch.), 1-14-2016; Ord. No. 4974, § I, 3-9-2017; Ord. No. 5261, §§ II—VII, 9-18-2023; Ord. No. 5365, § I, 3-12-2026)

Ask a question about La Crosse law

Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.