§ 115-215 — Municipalities and state agencies regulated

Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 115-215

Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/890d3d1c-36ce-4c65-88fc-9b782f34906c

Sec. 115-215. - Municipalities and state agencies regulated.

Unless specifically exempted by law, all cities, villages, towns, and counties are required to comply with this division and obtain all necessary permits. State agencies are required to comply if Wis. Stat. § 13.48(13) applies. The construction, reconstruction, maintenance and repair of State highways and bridges by the Wisconsin Department of Transportation is exempt when Wis. Stat. § 30.2022 applies. Although exempt from a local zoning permit and permit fees, DOT must provide sufficient project documentation and analysis to ensure that the community is in compliance with Federal, State, and local floodplain standards. If a local transportation project is located within a Zone A floodplain and is not a WisDOT project under Wis. Stat. § 30.2022, then the road project design documents (including appropriate detailed plans and profiles) may be sufficient to meet the requirements for issuance of a local floodplain permit if the following apply: The applicant provides documentation to the Floodplain Administrator that the proposed project is a culvert replacement or bridge replacement under 20-foot span at the same location, the project is exempt from a DNR permit under Wis. Stat. § 30.123(6)(d), the capacity is not decreased, the top road grade is not raised, and no floodway data is available from a federal, state, or other source. If floodway data is available in the impacted area from a federal, state, or other source that existing data must be utilized by the applicant in the analysis of the project site

(Ord. No. 5338, § I, 6-12-2025)