§ 115-440 — Variances
Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 115-440
Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/d069a2cc-2fdc-4e22-a260-f4af088afbb7
Sec. 115-440. - Variances.
Applications for variances shall be reviewed by the Board of Zoning Appeals per division 2 of article II of this chapter. (1) General regulations. All wireless communications facilities shall comply with all applicable FCC and FAA regulations. All facilities shall also comply with all applicable local zoning, building, and electrical codes. In addition, the following regulations shall apply: (2) Co-location requirement. At all times, shared use of existing monopole or lattice towers, including conforming and legal nonconforming towers, shall be preferred to the construction of new towers. Additionally, where such shared use is unavailable, location of an antenna(s) on pre-existing structures shall be considered. a. All applicants must attempt, in good faith, the co-location of wireless communication facilities (WCFs) on already existing towers, or monopoles, or alternative support structures. b. If such co-location is not feasible, said applicant must provide documentation of good faith attempt to co-locate facilities (in the form of written proposals and denials). No new tower shall be permitted unless the applicant demonstrates to the reasonable satisfaction of the City that no existing tower, structure, or alternative technology can accommodate the applicant's needs. Evidence submitted shall address the following: 1. That no existing towers or structures are located within the geographic area that meets the applicant's engineering requirements. 2. That existing towers or structures are not of sufficient height to meet the applicant's engineering requirements. 3. That existing towers or structures do not have sufficient strength to support the applicant's proposed antenna and related equipment. 4. That the applicant's proposed antenna would cause electromagnetic interference with the antenna(s) on the existing tower or structure, or that the antenna(s) on the existing tower or structure would interfere with the applicant's proposed antenna. 5. That other limiting factors that render existing towers or structures unsuitable are demonstrated. 6. That alternative technology that does not require the use of towers or structures, such as a cable micro cell network using multiple low-powered transmitters/receivers attached to a wire line system, is unsuitable. 7. In the event that the applicant claims an inability to co-locate, the City shall require a third party independent review by a radio frequency engineer licensed and registered by the State of Wisconsin. c. An applicant intending to share use of an existing tower or structure, including conforming and legal nonconforming towers, shall be required to document approval from an existing tower or structure owner to share use of the facility. The applicant shall pay reasonable fees and costs of adapting an existing tower or structure to a new shared use. d. An applicant intending to share use of an existing tower or structure, including conforming and legal nonconforming towers, or locate an antenna and supporting electrical and mechanical equipment on a pre-existing building or structure shall be required to submit to the Fire Department - Division of Fire Prevention and Building Safety the following information for review and approval prior to issuance of a wireless communication facility permit: 1. Documentation of the intent from the owner of the existing facility to allow shared use. 2. A site plan which shall show all existing and proposed structures and improvements including antennas, roads, buildings, guy wires and anchors, parking, and landscaping. Any methods used to conceal the modification of the existing facility, as required in subsection (5) of this section, shall be indicated on the site plan. 3. An engineer's report certifying that the proposed shared use will not diminish the structural integrity and safety of the existing tower, building, or structure, and explaining what modifications, if any, will be required in order to certify to the above. 4. A copy of its Federal Communications Commission (FCC) license. (3) Stealth facilities. Stealth facilities shall be allowed only after the applicant has demonstrated that co-location on existing structures is not feasible. The goal of stealth facilities is to minimize obtrusive, intrusive, or incompatible sightings. Examples of facilities promoting the use of "stealth technology" shall consist of, but not be limited to the following: a. Microcells within steeples; b. Camouflaged antenna arrays located on existing buildings or alternative support structures; c. Dual polarized antenna(s) located on streetlights or utility poles. (4) New tower/future shared use. a. Applications for the installation of new monopoles shall only be considered after the applicant has attempted to co-locate on existing facilities and use stealth facilities. No new lattice towers, or other similar guyed or un-guyed structures shall be erected within the City. b. All new monopole facilities shall be restricted to a maximum height of 75 feet. The applicant shall design the proposed new communications tower to accommodate future demand for reception and transmitting facilities. The applicant shall submit to the Fire Department - Division of Fire Prevention and Building Safety a letter of intent committing the owner of the proposed new tower, and his/her successors in interest, to negotiate in good faith for shared use of the proposed tower by other communications providers in the future. This letter shall be filed with the Fire Department - Division of Fire Prevention and Building Safety prior to the issuance of a conditional use permit and/or wireless communication facility permit. Failure to abide by the conditions outlined in the letter may be grounds for revocation of the approval for siting the new tower. The letter shall commit the tower owner and owner's interest to: 1. Respond within 90 days to a request for information from a potential shared use applicant. 2. Negotiate in good faith concerning future requests for shared use of the new tower by other communications providers. 3. Allow shared use of the new tower if another communications provider agrees in writing to pay reasonable charges. The charges may include but are not limited to a pro rata share of the cost of site selection, planning, project administration, land costs, site design, construction and maintenance financing, return on equity, and depreciation, and all of the costs of adapting the tower or equipment to accommodate a shared user without causing electromagnetic interference. (5) Visibility. Wireless facilities shall meet the following requirements: a. The use of "stealth" practices shall be encouraged to minimize the visual impact of wireless facilities. This includes the use of camouflage, concealment, and disguise. b. Where applicable, facilities shall be of a galvanized finish or painted gray above the adjacent surrounding tree-line and/or development, and painted gray, green, black, or similar colors designed to blend into the adjacent natural surroundings and/or development unless other standards are required by the Federal Aviation Administration (FAA). Facilities shall be designed and sited so as to avoid, wherever possible, application of FAA lighting and painting requirements. c. Accessory facilities shall be designed using materials, colors, textures, screening, and landscaping that will help to camouflage, conceal, or disguise the facilities in an effort to blend them into the adjacent natural setting and/or adjacent development. d. If an antenna is installed on a structure other than a tower, the antenna and supporting electrical and mechanical equipment shall be of a neutral color that is identical to, or closely compatible with the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible. (6) Screening and fencing. Buffer/screen planting and security fencing shall be required as follows: a. An eight-foot high security fence shall completely surround the tower, equipment, building(s), guy wires, and anchors (if required). b. An evergreen screen shall be planted that consists of either a hedge, planted three feet from the fencing, maximum, or a row of evergreen trees planted ten feet from the fencing, maximum. All plants should be a minimum of four feet in height at the time of planting. c. Existing vegetation (trees and shrubs) shall be preserved to the maximum extent possible. Mitigation shall be required where preservation is not practical. d. Required plants shall be maintained in a healthy condition at all times. Any plant that dies shall be replaced with another living plant that is comparable to the existing plant materials or plant materials specified in the approved landscape plan within 90 days after notification by the City. The Department of Planning and Development may extend this period up to an additional 90 days due to weather considerations. If the plants have not been replaced after appropriate notification and/or extension, the property owner, shall be in violation of this section of the regulations. e. At the discretion of the Director of Planning and Development, applicants may use alternatives to fencing/ screening provided that the alternatives are compatible with the surroundings and provide adequate security. (7) Lighting. Towers and antennas shall not be artificially lighted, unless required by the FAA or other applicable authority. If lighting is required, the lighting alternatives and design chosen must cause the least disturbance to the surrounding views. (8) Setback. In order to ensure public safety, the minimum distance from the base of any ground mounted monopole tower to any property line or easement line, public right-of-way, habitable dwelling, business or institutional use, or public recreational area shall be a distance equal to at least 40 percent of the height of the tower from any adjoining property line or easement line. The applicant wishing to site a new monopole tower may negotiate an easement with adjoining property owners to establish said setback provided a deed restriction is recorded which prevents any development or building within said easement. All other associated accessory equipment, buildings, guy wires, and anchors shall meet the minimum yards required for an accessory building within the zoning district in which the facility is to be located. Facilities located on alternative support structures are not required to meet the setback requirements of this section. (9) Signage. No signs shall be allowed on an antenna or tower, other than safety or warning signs. No permittee shall place or allow to be placed signs, symbols, or banners attached to, painted, or inscribed upon any wireless communication facility (WCF). Flags may be used in an effort to disguise wireless facilities. A permittee may place not more than one sign measuring 12 inches by 12 inches upon or near the WCF which: a. States that trespassers will be prosecuted (if applicable); b. Lists the names and telephone numbers of persons to be contacted in the event of an emergency; c. Identifies the permittee or person responsible for operating the WCF; and/or d. Contains information necessary and convenient for the permittee or person operating the WCF to identify the WCF. Nothing in this subsection (9) shall be construed to prohibit the placement of safety or warning signs upon any portion of the WCF which are required by law or which are designed to apprise emergency response personnel and the employees and agents of PWS providers of particular hazards associated with equipment located upon the WCF. (10) Historic sites. Historic sites shall be deemed viable sites. Wireless communications facilities may be permitted within or on historic sites on the condition that the placement of the facility shall not compromise the historic significance or appearance of the site. Historic Preservation Board approval shall be required for WCFs on historic sites within the City. (11) Trees. Applicants must indicate in their application all trees which they intend to remove from the site. Removed trees shall be replaced on a one to one basis. (12) Utility poles. Protrusions from the face of the pole should be no greater than the diameter of the pole itself, and in no case greater than 12 inches. The pole should be no wider than the minimum necessary to support the proposed equipment. If antennas are enclosed in a radone shield on top of the pole, the shield should have a maximum overhang of four inches. The pole shall be no wider than the minimum necessary to support the proposed equipment.
(Code 1980, § 15.41(D); Ord. No. 4911, § I(attch.), 1-14-2016)
Ask a question about La Crosse law
Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.
