§ 115-471 — Applications
Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 115-471
Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/289b0f70-8f2f-46be-a17c-773c311e7989
Sec. 115-471. - Applications.
(a) Wireless communication facility permit and/or conditional use permit required. No person shall construct, operate, or continue to operate a wireless communication facility within the City without a wireless communication facility permit and/or conditional use permit (when required) issued under this chapter, unless exempted from such permit requirement by the provisions of this chapter. Application for the permit shall be to the Fire Department - Division of Fire Prevention and Building Safety on forms required by the Fire Department - Division of Fire Prevention and Building Safety. The permit shall be issued by the Fire Department - Division of Fire Prevention and Building Safety. (b) Application for approval. Each request for the approval of a wireless communications facility shall include the following information: (1) Conditional use permit. All information required under article VI of this chapter. (2) Wireless communication facility permit: a. A completed application form, signed by the owner, the owner's agent, or the contract purchaser. If the owner's agent signs the application, he or she shall also submit written information regarding the nature of their corporation or employer. If the contract purchaser signs the application, he or she shall also submit the owner's written consent to the application. b. A recorded plat, recorded boundary survey, or plat of survey, Certified Survey Map (CSM), or American Land Title Association (ALTA) survey of the parcel on which the facility will be located, and a copy of the legal description of the parcel on which the facility will be located. The legal description, tax parcel number, and address of the parcel of land on which the facility will be located. c. The identity of the owner of the parcel and, if the owner is other than a real person, the complete legal name of the entity, a description of the type of entity, and written documentation that the person signing on behalf of the entity is authorized to do so. d. A scaled plan and a scaled elevation view and other supporting drawings, calculations, and other documentation required by the Fire Department - Division of Fire Prevention and Building Safety, signed and sealed by an appropriate licensed professional. The plans and supporting drawings, calculations and documentation shall show: 1. The location and dimensions of all proposed improvements, including the maximum height above ground of the facility (also identified in height above sea level). 2. The design of the facility, including the specific type of support structure and the design, type, location, size, height, and configuration of all proposed antennas and other equipment. 3. The topography within 2,000 feet of the proposed facility, in contour intervals not to exceed ten feet. 4. The height of all trees within 100 feet of any proposed monopole or tower relied upon to establish the proposed height and/or screening of the monopole or tower. 5. All existing and proposed setbacks, parking, fencing and landscaping. 6. The location and design of all proposed accessways. 7. Residential structures, zoning district boundaries, and parcels subject to conservation easements within 2,000 feet of the facility. 8. The proximity of the facility to commercial and private airports and helipads. e. Color photographs of the site. f. For any proposed monopole or tower, color photographs taken of a balloon test, which shall be conducted as follows: 1. The applicant shall contact the Department of Planning and Development within 30 days after the date the application was submitted to schedule a date and time when the balloon test will be conducted. The test shall be conducted within 60 days after the date the application was submitted, and the applicant shall provide the Department with at least seven days prior notice; provided that this deadline may be extended due to inclement weather or by the agreement of the applicant and the Department. 2. The test shall consist of raising one or more balloons from the site to a height equal to the proposed facility. 3. The balloons shall be of a color or material that provides maximum visibility. 4. The photographs of the balloon test shall be taken from the nearest residence and from appropriate locations on abutting properties, along each publicly used road from which the balloon is visible, and other properties and locations as deemed appropriate by the Department of Planning and Development. The applicant shall identify the camera type, film size, and focal length of the lens for each photograph. g. Radio frequency emission certification (in conformance with FCC guidelines).
(Code 1980, § 15.41(G); Ord. No. 4911, § I(attch.), 1-14-2016)
Ask a question about La Crosse law
Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.
