For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 115-599 — Permit requirements

Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 115-599

Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/4fb232fa-07e8-4b93-b4bf-dbdde2d52f28

Sec. 115-599. - Permit requirements.

(a) Building permit. A building permit shall be required for the installation of a small wind energy system. (b) Documents. The building permit application shall be accompanied by a plot plan which includes the following: (1) Property lines and physical dimensions of the property; (2) Location, dimensions, and types of existing major structures on the property; (3) Location of the proposed wind system tower; (4) The right-of-way of any public road that is contiguous with the property; (5) Any overhead utility lines; (6) Wind systems specifications, including manufacturer and model, rotor diameter, tower height, tower type (freestanding or guyed); (7) Tower foundation blueprints or drawings; (8) Tower blueprint or drawing; (c) Fees. The application for a building permit for a small wind energy system must be accompanied by the fee required for a building permit for a permitted accessory use. (d) Expiration. A permit issued pursuant to this division shall expire if: (1) The small wind energy system is not installed and functioning within 24-months from the date the permit is issued; or (2) The small wind energy system is out of service or otherwise unused for a continuous 12-month period.

(Code 1980, § 15.48(C))

Ask a question about La Crosse law

Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.