§ 115-615 — Principal uses
Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 115-615
Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/dace1d6d-decf-48e0-bda3-e9c9d658e788
Sec. 115-615. - Principal uses.
The City of La Crosse encourages the development of commercial or utility scale solar energy systems where such systems present few land use conflicts with current and future development patterns. Ground-mounted solar energy systems that are the principal use on the development lot or lots are conditional uses in selected districts. (a) Solar gardens. La Crosse permits the development of community solar gardens, subject to the following standards and requirements: (1) Rooftop gardens permitted. Rooftop community systems are permitted in all districts where buildings are permitted. (2) Ground-mount gardens conditional. Ground-mount community solar energy systems must be less than six acres in total size, and are a conditional use in all districts. Ground-mount solar developments covering more than six acres shall be considered solar farms. (3) Interconnection. An interconnection agreement must be completed with the electric utility in whose service territory the system is located. (4) Dimensional standards. All structures must comply with setback, height, and coverage limitations for the district in which the system is located. (5) Ground cover and buffer areas. Ground-mount solar gardens must comply with solar farm ground cover and buffer area standards, as described in subsection (b)(3). (6) Other standards. Ground-mount systems must comply with all required standards for structures in the district in which the system is located. (b) Solar farms. Ground-mount solar energy arrays that are the primary use on the lot, designed for providing energy to off-site uses or export to the wholesale market, are permitted under the following standards: (1) Conditional use permit. Solar farms are conditional uses in Light Industrial, Heavy Industrial, and Agricultural districts. (2) Stormwater and erosion control. Solar farms are subject to all City of La Crosse's stormwater management and erosion control provisions requirements. (3) Ground cover and buffer areas. In addition to the provisions of the NFPA, the following provisions shall be met related to the clearing of existing vegetation and establishment of vegetated ground cover. Additional requirements may apply as required by Multifamily Residential and Commercial Design Standards. a. Large-scale removal of mature trees on the site is discouraged. b. Top soils shall not be removed during development, unless part of a remediation effort. c. Soils shall be planted and maintained for the duration of operation in perennial vegetation to prevent erosion, manage run off, and improve soil. d. Seeds should include a mix of grasses and wildflowers, ideally native to the region of the project site that will result in a short stature prairie with a diversity of forbs or flowering plants that bloom throughout the growing season. Blooming shrubs may be used in buffer areas as appropriate for visual screening. e. Seed mixes and maintenance practices should be consistent with recommendations made by qualified natural resource professionals such as those from the Wisconsin Department of Natural Resources, County Soil and Water Conservation District, Land and Water Conservation Department or Natural Resource Conservation Service. f. Plant material must not have been treated with systemic insecticides, particularly neonicotinoids. g. The applicant shall submit a financial guarantee in the form of a letter of credit, cash deposit, or bond in favor of the City of La Crosse equal to 125 percent of the costs to meet the ground cover and buffer area standard. The financial guarantee shall remain in effect until vegetation is sufficiently established. (4) Foundations. A qualified engineer shall certify that the foundation and design of the solar panels racking and support is within accepted professional standards, given local soil and climate conditions. (5) Other standards and codes. All solar farms shall be in compliance with all applicable Local, State and Federal regulatory codes, including the State of Wisconsin Uniform Building Code, as amended; and the NFPA and National Electric Code, as amended. (6) Power and communication lines. Power and communication lines running between banks of solar panels and to nearby electric substations or interconnections with buildings shall be buried underground. Exemptions may be granted in instances where shallow bedrock, water courses, or other elements of the natural landscape interfere with the ability to bury lines, or distance makes undergrounding infeasible, at the discretion of the zoning administrator. (7) Site plan required. A detailed site plan for both existing and proposed conditions must be submitted, showing location of all solar arrays, other structures, property lines, rights-of-way, service roads, floodplains, wetlands and other protected natural resources, topography, electric equipment, and all other characteristics requested by the zoning administrator. The site plan should also show all zoning districts, and overlay districts. (8) Aviation protection. For solar farms located within 1,000 feet of an airport or within approach zones of an airport, the applicant must complete and provide the results of the Solar Glare Hazard Analysis Tool (SGHAT) for the Airport Traffic Control Tower cab and final approach paths, consistent with the Interim Policy, FAA Review of Solar Energy Projects on Federally Obligated Airports, or most recent version adopted by the FAA. (9) Agricultural protection. Solar farms must comply with site assessment or soil identification standards that are intended to protect agricultural soils. (10) Decommissioning. A decommissioning plan shall be required to ensure that facilities are properly removed after their useful life. Decommissioning of solar panels must occur in the event they are not in use for 12 consecutive months. The plan shall include provisions for removal of all structures and foundations, restoration of soil and vegetation and a plan ensuring financial resources will be available to fully decommission the site. Disposal of structures and/or foundations shall meet the provisions of Chapter 36, Solid Waste. The zoning administrator may require the posting of a bond, letter of credit or the establishment of an escrow account to ensure proper decommissioning.
(Ord. No. 5117, § I, 11-14-2019)
Ask a question about La Crosse law
Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.
