Sec. 40-9. - Conditions prescribed for laying gas mains and pipes.

All single gas main installations in the City shall be installed at a minimum of 36 inches below the established grade of the street or streets in which said main is laid and shall be placed and located in a manner as prescribed by the Board of Public Works. The Board of Public Works shall make its determination and prescribe such locations for the laying of such conduits at the time of the issuance of permit required by this Code for street openings of the street whichever is applicable, unless otherwise ordered by the Board of Public Works. Locations of all multiple gas main installations shall be as prescribed by the Board of Public Works upon application to said Board. The Board of Public Works may require detailed plans and specifications for all installations of gas mains, along with a certificate of insurance in accordance with section 2-2. Whenever it shall become necessary to take up and renew any gas main which has been laid in the center of the street or in any portion of the street other than that herein prescribed, it shall be unlawful for any person to relay or renew such gas main except as prescribed in this section. Old gas piping within the center of the street no longer utilized may, at the discretion of the Board of Public Works, be required to be removed. Should gas pipes or mains be installed within the boulevard or public right-of-way, such installation shall include replacement of grass, trees and protection against damage to trees, settling of ground or soil and shall take place within three days of the gas pipe or main installation. The Board of Public Works may require a bond as provided in section 2-3. When the grade of any gas main interferes with the placement of storm or sanitary sewers such mains shall be relaid to eliminate such obstructions to such sewers and the expense of such relaying shall be borne by the appropriate utility. Nothing herein contained shall be construed to permit the installation of thru gas transmission lines.

(Code 1980, § 5.13)