For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 46-150 — Sampling and testing

Municipal Code of the City of La Crosse, Wisconsin (Codified through Ordinance No. 5384, enacted August 13, 2026. (Supp. No. 43)) · La Crosse Municipal Code § 46-150

Corpus is an independent public-information project, not the official City of La Crosse website. Stable reference: corpuslaw.us/code/65a934a1-53d6-4ce9-b7a3-cd5d6f5d9e21

Sec. 46-150. - Sampling and testing.

(a) Sampling Requirement. The Utility may sample and test the discharge of any user suspected of discharging wastewater that exceeds that of normal domestic strength wastewater. If testing indicates the strength of the user's wastewater exceeds that of normal domestic strength wastewater for any pollutant parameter, the Utility may require that user to sample and analyze its wastewater for the pollutant parameters at least once during each billing period. The Utility may require more frequent sampling if, in the opinion of the Utility, the variability of the concentrations of the pollutant parameters, or the magnitude of the exceedance warrants. The Utility may require the user to install a sampling manhole if there is not another suitable location to obtain a representative sample. (b) Method of Sampling. Flow proportional 24-hour composite samples collected during a period representing typical discharge conditions shall be used to determine the concentrations of pollutant parameters. The collection, preservation, and analysis of samples shall be performed in accordance with 40 CFR 136 and any amendments thereto, or other such methods approved by the United States Environmental Protection Agency. (c) Responsibility for Costs. The user will be responsible for all sampling and analysis costs, except the Utility will be responsible for the initial sampling and analysis in cases where there is not data available to determine if a user discharges wastewater exceeding normal domestic strength concentrations. (d) Sampling Under Industrial Pretreatment Discharge Permit. Data provided to the Utility under an industrial pretreatment discharge permit is acceptable for purposes of this Section. The results of any samples taken and analyzed with approved methods shall be reported to the Utility within 30 days of the date the user received analysis results.

(Ord. No. 5131, § III, 3-12-2020)

Ask a question about La Crosse law

Corpus searches the La Crosse sections it holds and shows the ones that match, with their citations. Free, no sign-in.