For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 118-8 — Docks to Conform to Standard Plans

Milwaukee Code of Ordinances (Volumes 1-3 revised through Common Council action of Sept. 22, 2026) · Milwaukee Code of Ordinances § 118-8

Corpus is an independent public-information project, not the official City of Milwaukee website. Stable reference: corpuslaw.us/code/3184ba7d-1d4b-44e6-b074-3e1f7564bdb5

118-8. Docks to Conform to Standard Plans.

1. TYPES OF DOCKS. a. The substructure of all docks hereafter built or constructed along the navigable portion of any rivers, canals, slips or basins connected with or a part of the Milwaukee harbor shall conform to either plan no. 1 or plan no. 2, bearing date April 1, 1925, and approved by and on file with the board of harbor commissioners. The superstructure of all docks hereafter built or constructed according to plan No. 1 shall be of concrete. b. The superstructure of all docks hereafter constructed according to plan no. 2 shall be of wood. c. For steel sheet piling dock walls, the top elevation of wall shall be at least 2 feet 10 inches above city datum, and the steel shall penetrate the subsoil in accordance with the design which shall bear the stamp or seal of a registered professional engineer as defined in s. 443.01, Wis. Stats. Ladders of one inch diameter steel rungs, or larger, shall be placed at intervals of not more than 100 feet. Docks between 50 and 100 feet in length shall be provided with at least one ladder. 2. REPAIR OF EXISTING DOCKS. The superstructures of docks existing on April 1, 1925, may be repaired with like materials, but any rebuilding thereof shall be in accordance with sub. 1; provided, however, that no existing superstructure shall be rebuilt or replaced unless the piling and sheeting of the substructure shall be found, upon examination by the board of harbor commissioners, to be of such construction and dimensions as to protect the adjoining river bank from caving in by squeezing under the lower edge of the sheeting or be forcing the substructure beyond the established dock line, and no repairs shall be made to the superstructure of any dock unless the substructure shall be deemed by the board of harbor commissioners suitable and of such strength as shall warrant such repairs being made. 3. PERMITS. a. Permits for the building and repair of docks shall comply with s. 118-7 and this section. b. Whenever the board of harbor commissioners shall require any applicant for a permit to pull sheeting or piling so that the examination contemplated in sub. 2 may be made, it shall be the duty of the applicant to pull specimen piles and sheet piles at locations indicated by the board of harbor commissioners. c. See ss. 81-42, 81-43 and 81-43.5 for the required permit fees or the required engineering survey fee. d. The fees for each such permit or survey shall be paid before such permit is issued or such engineering survey is commenced. 4. PENALTY. Any person, firm or corporation who shall fail to obtain a permit for the construction, erection, rebuilding, alteration or repair of any dock when required to do so by s. 118-7 and this section, or who shall fail to comply with the inspection requirement of sub. 3, shall upon conviction thereof forfeit to the city a penalty of not less than $50 nor more than $500, and in default of payment thereof shall be imprisoned in the county jail or house of correction of Milwaukee county not less than 10 days nor more than 90 days.

Ask a question about Milwaukee law

Corpus searches the Milwaukee sections it holds and shows the ones that match, with their citations. Free, no sign-in.