223-7. General Inspection Rules

1. PERMIT REQUIREMENTS. a. No person may install, alter, replace or repair any boiler, unfired pressure vessel, fired pressure vessel or power piping regulated in this section without first obtaining a permit and paying the fees as prescribed in s. 200-33. b. An application for permit shall be filed with the commissioner of city development on a form furnished for this purpose for each boiler, unfired or fired pressure vessel, or power piping system. The application shall describe the installation, alteration, repair or replacement work to be done. c. The issuance of a permit for a boiler, unfired or fired pressure vessel, or power piping system shall not preclude compliance with the provisions of this code or other laws referring to occupancy and use or construction. No other work on the boiler, unfired or fired pressure vessel, or power piping system may be done, except work authorized by the permit. d. Any person who fails to procure a permit for the installation, alteration, replacement or repair of any boiler, unfired pressure vessel, or fired pressure vessel, or power piping shall be subject to penalties and fees as provided in ss. 200-19-1 and 200-32-3 and b. e. The commissioner may issue a citation with or without prior order for any violation of this chapter as provided in s. 200-19-2. 2. INSPECTION REQUIREMENTS. a. Notification. a-1. Upon the completion of any installation, alteration, replacement or repair of a boiler, or unfired pressure vessel or fired pressure vessel, the person making such installation, alteration, replacement or repair shall notify the commissioner requesting an inspection of such work as soon thereafter as practicable. a-2. The installing contractor shall notify the commissioner requesting an inspection of the power piping, prior to the construction, installation, alteration, repair or replacement of any power piping system, so that inspections may be arranged. The commissioner shall be given a minimum of 2 business days’ notice prior to the requested date of inspection. b. Inspection. b-1. Every boiler, unfired pressure vessel or fired pressure vessel may be inspected by the commissioner to determine whether it complies with the requirements of this section before it is placed in service. b-2. No Wisconsin permit to operate shall be issued by the commissioner until the installation substantially complies with the requirements of this section. c. Hydrostatic test. c-1. A hydrostatic test may be witnessed by the commissioner of every cast iron boiler which has a heat input of more than 200,000 Btu per hour before being placed in service. c-2. Factory assembled boilers may be waived from this requirement by the commissioner. c-3. A test pressure of 1.5 times the maximum pressure (minimum of 45 pounds per square inch) shall be applied to the boiler in the presence of the commissioner. d. Power Piping Systems Not Covered by the ASME code section 1. All power piping systems not covered by ASME code section 1, and requiring construction in accordance with the ASME code for power piping, may be inspected by the commissioner. If the power piping system is not inspected by the commissioner, it shall be inspected by an organization having a documented quality control program as described in par. f. e. Power Piping Installation; Inspections. Except as provided in par. g, no owner shall install, alter or replace any power piping without obtaining inspections in accordance with par. d as follows: e-1. After the material is delivered to the job site, but prior to the start of construction of the power piping system. e-2. Prior to the insulating of the power piping system. e-3. Prior to the power piping system being placed into service. f. Documented Quality Control Program. A documented quality control program shall: f-1. Be reviewed and approved annually by the commissioner. f-2. Contain the scope of work the organization intends to perform. f-3. Contain a description of the repairs of a routine nature to be performed without prior on site approval by the authorized inspection agency. f-4. Contain a written description of the authority and responsibility of those persons in charge of the quality control system. f-5. Contain an organization chart showing the relationship between management and engineering, purchasing, assembling, inspection and quality control. f-6. Contain procedures, which will assure that the drawings, design calculations, specifications, fabrication, examination, testing and inspections are done in accordance with all applicable codes. f-7. Contain a material control system, which will insure that the material received is properly identified to satisfy code requirements. f-8. Contain the method to control welding to insure that welding conforms to section IX of the ASME code. f-9. Contain a system for correction of nonconformities. A nonconformity is any condition which does not comply with the applicable rule of this code. f-10. Contain provisions for identifying nondestructive examination procedures for power piping. f-11. Contain documented inspections, as described in par. e, made by an authorized inspection agency on forms approved by the commissioner. f-12. Contain sample forms and any detailed procedures for their use. g. Exemption. An organization having a documented quality control program as described in par. f shall be exempt from the requirements in subs. 1 and 2-a-2. h. Routine Repairs. Repairs of a routine nature, as specified in the organization’s quality control program and which have been approved by the authorized inspection agency, may be performed without a site inspection. 3. INSTALLATION STANDARDS. a. Other Standards. In any case not covered by reference in s. 223-1, the commissioner may use the ASME codes for boilers, pressure vessels and power piping systems, as amended, as representing standard engineering and safe practice. b. Special Rules. The commissioner may promulgate such rules for the enforcement of the regulations of this section as are deemed proper and desirable, and which are not inconsistent with this chapter and state statutes. c. Change Orders. The commissioner may order such changes to any boiler, pressure vessel or power piping installation as may be necessary for the proper protection of life and property. 4. PERIODIC INSPECTIONS AND INSPECTION FEES. a. Inspection. The commissioner may inspect boilers, unfired pressure vessels and fired pressure vessels in a manner that is consistent with the provisions of ch. SPS 341, Wis. Adm. Code, as amended. b. Testing Authority. b-1. The owner or user of a boiler, unfired pressure vessel or fired pressure vessel to be tested by the commissioner shall, after receiving notice, prepare the boiler, unfired pressure vessel or fired pressure vessel for an internal inspection, external inspection, hydrostatic pressure tests or non-destructive examination. b-2. Failure to comply with such notice within the time specified may result in reinspection fees established in s. 200-33-23-i. c. Inspection Fees. Each inspection, test, of service performed by the commissioner shall be paid for at rates established in s. 200-33. d. Authorized Inspection Agency and Reports. In lieu of inspections by the commissioner, the commissioner may accept inspections made by an authorized inspection agency. Such inspections shall be made in accordance with this section. For boilers, unfired pressure vessels and fired pressure vessels subject to periodic inspection requirements, the authorized inspection agency shall have a detailed report of each inspection filed with the commissioner within 15 days from the date of inspection. The reports shall be printed on an approved form and provide all information requested on the form, including code violations. e. Failure to Report Inspections. If an authorized inspection agency fails to meet the requirements listed in par. d, the commissioner may make the inspections. Inspections done by the commissioner due to a lack of response by the authorized inspection agency shall be billed to the owner or user in accordance with s. 200- 33. f. Responsibility. The owner or user of the boiler, unfired pressure vessel or fired pressure vessel shall be responsible for obtaining a periodic inspection and maintaining a valid Wisconsin permit to operate, pursuant to s. 223-1. g. Service of Order. Any order issued under this section shall be served upon the owner of record pursuant to s. 200-12-2-b. The order may also be posted on the premises. The department may place a charge for the posting in the amount provided in s. 200-33-43.5 and may place a code enforcement fee as provided in s. 200-33-8.8 against the subject property which may be assessed and collected as a special charge. 5. MAINTENANCE: UNSAFE OR HAZARDOUS EQUIPMENT, AND COMPLAINTS. a. The owner or users of any boiler, unfired pressure vessel, fired pressure vessel or power piping system shall maintain such equipment in a safe operating condition. b. Complaints on improper or defective boilers, unfired pressure vessels or fired pressure vessels may be investigated and action may be taken as herein regulated. c. If, upon inspection, any boiler, unfired pressure vessel or fired pressure vessel is found to be unsafe or in a hazardous condition, the commissioner may order such equipment removed from service until such unsafe or hazardous condition is corrected. A written order to remedy conditions may be sent by the commissioner to the person owning or using such equipment. Failure to comply with the order within the time specified shall result in penalties or fees as established in ss. 200-19 and 200-33.

Ask a question about Milwaukee law

Corpus searches the Milwaukee sections it holds and shows the ones that match, with their citations. Free, no sign-in.