§ 289-3 — Filling Permits
Milwaukee Code of Ordinances (Volumes 1-3 revised through Common Council action of Sept. 22, 2026) · Milwaukee Code of Ordinances § 289-3
Corpus is an independent public-information project, not the official City of Milwaukee website. Stable reference: corpuslaw.us/code/045789e7-4d83-4bb0-9905-c7fcb052f6ea
289-3. Filling Permits.
1. PERMIT REQUIRED. No person may fill or grade any lot, tract or parcel of land without first obtaining a permit from the commissioner of city development. However, no permit shall be required whenever excavation, filling or grading is performed in conjunction with a construction project for which the department has issued a permit, the proposed final grade is included in the plans approved by the department and the total amount of material other than that deposited in or taken from the building footprint does not exceed 500 cubic yards. Further, no permit shall be required when the total amount of material does not exceed 100 cubic yards. A permit shall be required whether fill is brought to the site or is moved and deposited within the boundaries of the site. 2. APPLICATION FOR PERMIT. Application for a filling permit shall be made on a form provided by the department of city development and accompanied by the permit fee specified in s. 200-33. The application shall be signed by the person applying for the permit and, if different, the owner of the premises for which the filling is proposed. The application shall specify the location of the premises, a detailed description of the portion of the premises to be filled and an estimate of the number of cubic yards of solid fill necessary to fill the area to approximately the grade of the terrain bounding it. 3. PERMIT VALIDITY; REVOCATION. A filling permit shall be valid for a period of 6 months. Permits may be renewed for additional 6-month periods upon reapplication to the commissioner of city development. Reapplications shall be referred to the commissioner of neighborhood services for approval. A permit may be revoked by the commissioner of neighborhood services upon service of written notice to the permit holder whenever the permit holder is depositing, or permitting or causing to be deposited, any materials on the premises other than solid fill or has failed to or refused to comply with any of the regulations of this chapter. 4. PLAN REQUIRED FOR LARGE PROJECTS. For a project involving land area greater than one-half acre in size or the excavation, filling or grading of more than 500 cubic yards of earth or fill material other than that deposited in or taken from the building footprint, an applicant shall submit a plan prepared at a recognized engineering or architectural scale. This plan shall be consistent with the city of Milwaukee’s comprehensive plan and shall include the following information: a. The existing and proposed topography of the site at a contour interval of 2 feet. All topographic information shall be prepared to city datum by a registered professional engineer or land surveyor. b. The existing and proposed grades of the lot at each corner of the lot, at each corner of any existing or proposed buildings and at the center of the street pavement at the lot lines extended. c. The existing and proposed grades of all driveways and parking lots. d. Drainage patterns, or special drainage devices proposed, as well as spot elevations at the top and bottom of all drainage swales, if applicable. e. Spot elevations of all significant cut and fill areas. f. Locations of existing or proposed buildings. g. Locations of any recorded easements as well as above- or below-ground utilities. h. The date of the plan, the north arrow and graphic scale. i. A schedule for the project indicating the duration of the project, phasing and the proposed handling of interim conditions including, but not limited to, stockpiling of materials and equipment storage. j. The proposed use of the site after the completion of the project. k. Any other information as may be reasonably requested by the city. 5. SURETY BOND. Applicants for projects requiring the filing of a plan pursuant to sub. 4 shall file with the commissioner of neighborhood services a bond of a surety company duly incorporated in the state of Wisconsin or duly licensed to do business in this state in an amount equal to the cost of the excavation, filling or grading project, but in no case less than $10,000, such bond to be approved by the city attorney. Individual sureties shall not be deemed in compliance with this section. The bond shall provide that they shall not be cancelled until after 30 days’ notice in writing to the commissioner of neighborhood services. In lieu of the bond, a public service corporation, or a cooperative association organized under ch. 185, Wis. Stats., to render or furnish telephone, gas, light, heat or power may file with the commissioner of neighborhood services proof of financial responsibility containing the conditions required in the public liability policy. Acceptance of this proof shall be subject to approval by the city attorney. 6. ZONING PERMIT. In addition to the permit required by this section, a special use permit from the board of zoning appeals may be required for a filling or grading project. A special use permit may be required even if no permit is required by this section. See s. 295-419 for additional information.
Ask a question about Milwaukee law
Corpus searches the Milwaukee sections it holds and shows the ones that match, with their citations. Free, no sign-in.