For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 102-11 — Permits

Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 102-11

Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/9f287692-b827-44ff-815e-24e2ff394913

Sec. 102-11. - Permits.

(a) Requirements. No person shall plant, remove, replace, prune, cut above or below ground, spray, fertilize, alter, chemically treat, or otherwise injure or disturb any public tree, plant, or shrub, or excavate within eight feet of a public tree, or cause such act to be done by another, without first obtaining a permit for such work from the city forester, as provided in this article. (b) Application. (1) Submittal. An applicant shall submit a completed permit application, along with any permit fees, to the city forester. (2) Contents. a. All projects. The permit application shall include: 1. contact information of the applicant; 2. contact information of the person performing the work; 3. a description of the work to be performed; 4. anticipated start and end dates of the proposed work; and 5. an acknowledgement of the receipt and agreement to abide by the provisions of this chapter and any conditions of approval as set forth by the city forester. b. Underground projects. The permit application shall include all contents listed in subsection (i) and a drawing that identifies: 1. the location of the proposed work; 2. overall dimensions and depth from ground surface; and 3. all trees, plants, and shrubs to be maintained or impacted by the proposed work or within eight feet of any proposed excavation. (3) Fees. Permit fees shall be determined by the budget as set forth in the fee schedule and established by the common council. (4) Timeliness. Unless otherwise permitted by the city forester, or to abate an immediate hazard, a permit application must be submitted not less than two weeks prior to the start date of any work for which the permit is requested. (5) Conditions and issuance. If the city forester determines that the proposed work described in the permit application is in accordance with the purposes and provisions of this chapter, taking into account the health, safety, and welfare of the public; location of utilities, sidewalks, driveways, and street lights; general character of the area in which the tree is located or proposed to be located; type of soil; characteristics and physiological need of the genus, species, and variety of tree; then the city forester shall issue a permit, with or without conditions, to the applicant. (6) Adherence. The permit holder shall abide by all of the representations made in the permit application and all of the conditions stated on the permit. (7) Completion. The permit holder shall complete any such work for which a permit has been issued by the expiration date on the permit. The permit holder shall notify the city forester within five days after completing such work, at which time, the city forester shall cause an inspection to be conducted to ensure compliance with this chapter. (c) Annual permits. Any public or private utility or its contractor that performs tree maintenance operations or otherwise handles public trees as part of regularly scheduled utility work or infrastructure vegetation management operations shall be required to obtain an annual permit for such work. The procedures for applying and obtaining such permit shall be the same as for a general permit under subsection (b), except that the application shall include details of any proposed vegetation management operations for that calendar year. (d) Exemptions. (1) Utility companies; emergencies. No permit is required for a utility company to perform work related to the emergency abatement of storm damage, or to conduct emergency operations necessary for the public health, safety, or welfare, or where necessary for the immediate restoration of disrupted utility service. The utility shall notify the city forester as soon as possible following any emergency operation or storm response work, along with notice of any debris left on the right-of-way or public area as a result of such work. (2) Storm damage. No permit is required for an abutting property owner, contractor for the abutting property owner, utility, or the city to perform work on any public tree in order to abate storm damage immediately following such damage. (3) Public improvement projects. No permit is required for the following public improvement projects: a. Work performed, coordinated, or supervised by the city forester or department of parks, recreation, and cultural services. b. Work performed on any public tree, shrub, plant, or any part thereof, when the same shall be necessary for the construction of any sidewalk, roadway, street, avenue, alley, pavement, sewer, water main, or other public improvement, and where such public improvement is authorized by a governmental agency, so long as prior to the commencement of the project, however, the person or entity performing such work shall obtain a plan review and approval by the city forester with respect to any public trees that may be impacted by such work. Public trees within a construction zone or work area shall receive adequate protection. (4) Watering. No permit is required for an abutting property owner or contractor for the abutting property owner to water public trees, plants, or shrubs. (5) Waiver. Permit requirements may be waived by the director of parks, recreation, and cultural services, city forester, or designee thereof in cases of emergency, storm damage, disease outbreak, insect infestations, or any situation where the immediate abatement of a hazard is necessary to protect the public health, safety, and welfare.

(Ord. No. 0010-24, pt. 2, 11-19-24)

Ask a question about Racine law

Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.