§ 114-1206 — Central loading
Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 114-1206
Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/5d23216b-0a3b-4584-b8fd-8dc55e751c78
Sec. 114-1206. - Central loading.
Central loading facilities may be substituted for loading berths on the individual zoning lots provided the following conditions are fulfilled: (1) Each zoning lot served shall have direct access to the central loading area without crossing streets or alleys at grade. (2) Total off-street loading berths provided shall meet the minimum requirements specified in this division, based on the sum of the several types of uses served. (Area of types of uses may be totaled before computing number of loading berths.) (3) No zoning lot served shall be more than 500 feet removed from the central loading area. (4) The tunnel or ramp connecting the central loading area with the zoning lot served shall be not less than seven feet in width and have a clearance of not less than seven feet.
(Code 1973, § 16.11.030(a)(7))
Ask a question about Racine law
Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.
