For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 114-901 — Zoning administrator

Municipal Code of the City of Racine, Wisconsin (Codified through Ordinance No. 0082-26, adopted March 3, 2026. (Supp. No. 108)) · Racine Municipal Code § 114-901

Corpus is an independent public-information project, not the official City of Racine website. Stable reference: corpuslaw.us/code/fabff5d8-1bd0-4739-ae74-269e0fc92519

Sec. 114-901. - Zoning administrator.

(1) In addition to those duties and powers as described in section II, the zoning administrator shall have the followings duties and powers: (a) Inspect all damaged floodplain structures and perform a substantial damage assessment to determine if substantial damage to the structures has occurred. (b) Keep records of all official actions such as: 1. Documentation of certified lowest floor and regional flood elevations for floodplain development; 2. Records of water surface profiles, floodplain zoning maps and ordinances, nonconforming uses and structures including changes, appeals, variances and amendments. 3. All substantial damage assessment reports for floodplain structures. (c) Submit copies of the following items to the DNR regional office: 1. Within ten days of the decision, a copy of any decisions on variances, appeals for map or text interpretations, and map or text amendments; 2. Copies of any case-by-case analyses, and any other information required by DNR including an annual summary of the number and types of floodplain zoning actions taken. 3. Copies of substantial damage assessments performed and all related correspondence concerning the assessments. (d) Investigate, prepare reports, and report violations of this article to the planning, heritage, and design commission and attorney for prosecution. Copies of the reports shall also be sent to DNR regional office. (e) Submit copies of text and map amendments and biennial reports to the FEMA regional office. (2) Conditional use permit. A conditional use permit shall be obtained before any new development or any repair or change in the use of a building or structure, including sewer and water facilities, may be initiated. In addition to the requirements of division 3, an application to the zoning administrator shall include: (a) Site development plan. A site plan drawn to scale shall be submitted with the permit application form and shall contain: 1. Location, dimensions, area and elevation of the lot; 2. Location of the ordinary high-water mark of any abutting navigable waterways; 3. Location of any existing or proposed on-site sewage systems or private water supply systems; 4. Location and elevation of existing or future access roads; 5. Location of floodplain and floodway limits as determined from the official floodplain zoning maps; 6. The elevation of the lowest floor of proposed buildings and any fill using Flood Insurance Rate Maps in North American Vertical Datum (NAVD); 7. Data sufficient to determine the regional flood elevation in NAVD at the location of the development and to determine whether or not the requirements of divisions 3 or 4 are met; and 8. Data to determine if the proposed development will cause an obstruction to flow or an increase in regional flood height or discharge according to section 114-851. This may include any of the information noted in section 114-862(1). (b) Reserved. (c) Data requirements to analyze developments. The applicant shall provide all survey data and computations required to show the effects of the project on flood heights, velocities and floodplain storage, for all subdivision proposals, as "subdivision" is defined in section Wis. Stats. Ch. 236, and other proposed developments exceeding five acres in area or where the estimated cost exceeds $125,000.00. The applicant shall provide: a. An analysis of the effect of the development on the regional flood profile, velocity of flow and floodplain storage capacity; b. A map showing location and details of vehicular access to lands outside the floodplain; and c. A surface drainage plan showing how flood damage will be minimized. The estimated cost of the proposal shall include all structural development, landscaping, access and road development, utilities, and other pertinent items, but need not include land costs. (3) Occupancy certificate. In addition to the procedures set forth in section 114-845, no land shall be occupied or used, and no building which is hereafter constructed, altered, added to, modified, repaired, rebuilt or replaced shall be occupied until an occupancy certificate is issued by the zoning administrator. (a) The applicant shall submit a certification signed by a Wisconsin registered professional engineer, architect or land surveyor that the fill, lowest floor and floodproofing elevations are in compliance with the permit issued. Floodproofing measures also require certification by a Wisconsin registered professional engineer or architect that floodproofing measures meet the requirements of section 114-905. (4) Other permits. The applicant must secure all necessary permits from federal, state, and local agencies, including those required by the U.S. Army Corps of Engineers under section 404 of the Federal Water Pollution Control Act, Amendments of 1972, 33 U.S.C. 1344.

(Ord. No. 38-06, pt. 1, 12-5-06; Ord. No. 3-12, pt. 1, 4-25-12; Ord. No. 0026-19, pt. 100, 11-12-19)

Ask a question about Racine law

Corpus searches the Racine sections it holds and shows the ones that match, with their citations. Free, no sign-in.